Figures
Figure 1.1
Project Location
Figure 2.1
Comparisons of Project Alignment
Figures 2.2.1 – 2.2.5
Project Alignment (sheet 1-5)
Figure 3.1
Location Plan of the Air Sensitive Receivers
Figure 4.1
Location Plan of the Representative Noise Sensitive Receivers
Figures 4.2.1 – 4.2.10
Location Plan for the Noise Assessment Points
Figure 4.3
Indicative Plan of the Workfront
Figure 4.4.1
Proposed Noise Barrier at Blessing Villa Block F
Figure 4.4.2
Proposed Noise Barrier at Seacoast Royale Tower 3
Figure 4.4.3
Proposed Noise Barrier at Villa La Plage House 8
Figure 4.4.4
Proposed Noise Barrier at Villa La Plage House 15
Figure 4.4.5
Proposed Noise Barrier at Villa La Plage House 25
Figure 5.1
Location of Water Sensitive Receivers
Figure 6.1
Location Plan of Ground Investigation Record
Figure 8.1
Ecological Survey Transects and Sampling Locations
Figure 8.2
Habitat Map and Locations of Species of Conservation Importance
Figure 8.2a
Habitat Map and Locations of Species of Conservation Importance (zoom in)
Figure 8.2b
Figure 8.3
Photos of Habitats and Plant Species of Conservation Importance
Figure 8.4
Hard Coral and Gorgonian recorded in the Dive Survey
Figure 9.1
Distribution of Fishing Vessel Operation (sampan)
Figure 9.2
Distribution of Fisheries Production (sampan)
Figure 9.3
Distribution of Spawning Grounds for Fisheries Species
Figure 9.4a
Fisheries Sampling Locations of 3RS EIA Study (Trawl survey)
Figure 9.4b
Fisheries Sampling Locations of 3RS EIA Study (Purse seine & hand line)
Figure 9.4c
Fisheries Sampling Locations of 3RS EIA Study (Ichthyoplankton & fish post-larvae survey)
Figure 9.5
Locations of Project Site and Fish Culture Zones
Figure 10.1
General Site Location Plan
Figure 10.2
Aerial Photograph of Study Area
Figure 10.3
Future Planning Context
Figure 10.4
Landscape Resources Plan
Figures 10.5.1 – 10.5.2
Landscape Resources Photographs
Figure 10.6
Landscape Character Areas Plan
Figures 10.7.1 - 10.7.2
Landscape Character Areas Photographs
Figures 10.8.1 - 10.8.4
Visual Envelope and Visual Sensitive Receivers
Figures 10.9.1 – 10.9.4
Existing VSR Views
Figures 10.10.1 – 10.10.3
Recommended Landscape and Visual Mitigation Measures – Plan
Figures 10.11.1 – 10.11.3, 10.11.5, 10.11.6
Recommended Landscape and Visual Mitigation Measures – Sections
Figure 10.11.4
Recommended Landscape and Visual Mitigation Measures – Cycle Bridge Design
Figures 10.12.1 – 10.12.6
Preliminary Landscape Master Plan
Figures 10.13.1 – 10.13.3
Residual Impact on Landscape Resources during Construction and Operation
Figures 10.14.1 – 10.14.3
Residual Impact on Landscape Character Areas during Construction and Operation
Figures 10.15.1 – 10.15.3
Residual Visual Impact during Construction and Operation
Figure 10.16
Vantage Points of Photomontage
Figures 10.17.1 – 10.17.32
Photomontage of Vantage Points