Location
of Proposed Hung Shui Kiu Effluent Polishing Plant (HSKEPP) |
|
Location
of NWNT Tunnel and Urmston Road Outfall |
|
Schematic Layout of Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) |
|
Process
Flow Diagram of Sewage Treatment for HSKEPP |
|
Process
Flow Diagram of Sludge Treatment for HSKEPP |
|
Locations
of Other Possible Concurrent Projects |
|
Location of Representative
Air Sensitive Receiver (Construction Phase) |
|
Location of Representative
Air Sensitive Receiver (Operation Phase) |
|
Contour of Predicted Maximum
Cumulative Hourly TSP Concentration at 1.5 mAG
(µg/m3) (Construction Phase, Mitigated) |
|
Contour of Predicted 10th
Highest Cumulative Daily RSP Concentration at 1.5 mAG
(µg/m3) (Construction Phase, Mitigated) |
|
Contour of Predicted
Cumulative Annual RSP Concentration at 1.5 mAG
(µg/m3) (Construction Phase, Mitigated) |
|
Contour of Predicted 19th
Highest Cumulative Daily FSP Concentration at 1.5 mAG
(µg/m3) (Construction Phase, Mitigated) |
|
Contour of Predicted
Cumulative Annual FSP Concentration 1.5mAG (µg/m3) (Construction
Phase, Mitigated) |
|
Contour of Predicted 10th
Highest Cumulative Daily RSP Concentration at 1.5 mAG
(µg/m3) (Operation Phase) |
|
Contour of Predicted
Cumulative Annual RSP Concentration at 1.5 mAG
(µg/m3) (Operation Phase) |
|
Contour of Predicted 19th
Highest Cumulative Daily FSP Concentration at 60 mAG (µg/m3) (Operation Phase) |
|
Contour of Predicted
Cumulative Annual FSP Concentration 50 mAG (µg/m3)
(Operation Phase) |
|
Contour of Predicted 19th
Highest Cumulative Hourly NO2 Concentration at 50 mAG (µg/m3) (Operation
Phase) |
|
Contour of Predicted
Cumulative Annual NO2 Concentration at 1.5 mAG
(µg/m3) (Operation Phase) |
|
Contour of Predicted 4th
Highest Cumulative 10-min SO2 Concentration at 60 mAG (µg/m3)
(Operation Phase) |
|
Contour of Predicted 4th
Highest Daily SO2 Concentration at 50 mAG (µg/m3) (Operation Phase) |
|
Contour of Predicted
5-Second Average Odour Concentration in OU/m3
at 1.5mAG (Operation Phase) |
|
Indicative Locations of
Marine Water Sensitive Receivers and Observation Points (North
Western Waters) |
|
Indicative Locations of
Marine Water Sensitive Receivers and Observation Points (Deep Bay Waters) |
|
Indicative Locations of WSRs
in 500m from Project Site Boundary |
|
Locations of Identified Potentially Contaminated
Sites / Hotspots within the Proposed HSKEPP Site |
|
Concerned Areas and Proposed Sampling Locations
(Northern Portion of Proposed HSKEPP) |
|
Ecological Assessment Area,
Walk Transect and Sampling Locations for Ecological Surveys (Hung Shui Kiu
Effluent Polishing Plant) |
|
Assessment Areas of Previous
Environmental Impact Assessment Studies |
|
Habitat Map and Indicative
Location of Species of Conservation Importance Recorded in the Ecological
Survey |
|
Landscape Resources
Overlaid with Proposed Layout |
|
Landscape Resource Photos
(Sheet 1) |
|
Landscape Resource Photos (Sheet 2) |
|
Landscape Resource Photos (Sheet 3) |
|
Landscape
Character Areas with Development Proposal Overlaid |
|
Landscape Character Area
Photos |
|
Visual Envelope and Key
VSRs with Development Proposal Overlaid |
|
Photos of Key Viewpoints |
|
Landscape and Visual Mitigation Plan |
|
Photomontage Viewpoint 1 |
|
Photomontage Viewpoint 2 |
|
Photomontage Viewpoint 3 |
|
Photomontage Viewpoint 4 |
|
Photomontage Viewpoint 5 |