TECHNICAL STUDY ON PARTIAL DEVELOPMENT OF FANLING GOLF COURSE SITE FEASIBILITY STUDY

 

ENVIRONMENT IMPACT ASSESSMENT REPORT

 

CONTENTS

 

8          LAND CONTAMINATION         

8.1       Introduction   

8.2       Environmental Legislations and Evaluation Criteria

8.3       Assessment Approach and Methodology      

8.4       Description of the Environment        

8.5       Remediation Measures and Validation         

8.6       Environmental Monitoring & Audit (EM&A)          

8.7       Evaluation of Residual Impact          

8.8       Conclusion     

 

9          ECOLOGICAL IMPACT ASSESSMENT

9.1       Introduction   

9.2       Relevant Legislation and Criteria      

9.3       Methodology for Baseline Establishment     

9.4       Results of Literature Review 

9.5       Ecological Survey Results     

9.6       Evaluation of Habitats and Species of Conservation Importance     

9.7       Impact Identification and Prediction  1

9.8       Mitigation Measures and Precautionary Measures   

9.9       Cumulative Impacts   

9.10     Residual Impacts       

9.11     Environmental Monitoring and Audit (EM&A)       

9.12     Conclusions   

 

10.       FISHERIES IMPACT ASSESSMENT     

10.1     Introduction   

10.2     Statutory Requirements and Evaluation Criteria      

10.3     Assessment Area       

10.4     Assessment Methodology      

10.5     Baseline Condition    

10.6     Evaluation of Impacts during Construction Phase    

10.7     Evaluation of Impacts during Operational Phase      

10.8     Overall Summary of Fisheries Impact          

10.9     Mitigation Measures  

10.10   Potential for Cumulative Impacts      

10.11   Residual Impacts       

10.12   Monitoring and Audit Requirements

10.13   Conclusion     

10.14   References     

 

TABLES

 

Table 8.1         Risk-Based Remediation Goals (RBRGs) for Soil and the Soil Saturation Limit                                                

Table 8.2         Risk-Based Remediation Goals (RBRGs) for Groundwater and Solubility Limit                                 

Table 8.3         Summary of Historical Aerial Photographs at the PDA 

Table 8.4         Summary of Historical Aerial Photographs at the Associated Off-site Works Area                                                             

Table 8.5         Land Use Activities and Corresponding Chemicals of Concern at the Proposed Development Area                 

Table 8.6         Full List of Chemicals of Concern                                 

Table 8.7         Post-Restoration Land Uses and the Corresponding RBRGs           

Table 8.8a       Potential Soil Remediation Options                               

Table 8.8b     Potential Groundwater Remediation Options                 

Table 9.1        Ecological Survey Programme

Table 9.2         List of Flora and Fauna Species of Conservation Importance from Reviewed Literature

Table 9.3         List of Fauna Species of Conservation Importance within the Assessment Area by AFCD

Table 9.4       Habitats within the Assessment Area and the 4 Sub-Areas within Project Site

Table 9.5       Evaluation of Abandoned Agricultural Land within Assessment Area

Table 9.6       Evaluation of Active Agricultural Land within Assessment Area

Table 9.7       Evaluation of Developed Area within Assessment Area

Table 9.8       Evaluation of Fung Shui Wood within Assessment Area

Table 9.9       Evaluation of Marsh within Assessment Area

Table 9.10     Evaluation of Mixed Woodland within Assessment Area

Table 9.11     Evaluation of Orchard within Assessment Area

Table 9.12     Evaluation of Plantation within Assessment Area

Table 9.13     Evaluation of Pond within Assessment Area

Table 9.14     Evaluation of Ruderal Vegetation within Assessment Area

Table 9.15     Evaluation of Shrubland/Grassland within Assessment Area

Table 9.16     Evaluation of Swampy Woodland within Assessment Area

Table 9.17     Evaluation of Turfgrass Land within Assessment Area

Table 9.18     Evaluation of Watercourse within Assessment Area

Table 9.19     Evaluation of Woodland within Assessment Area

Table 9.20     Evaluation of the Four Sub-Areas within Project Site

Table 9.21     Evaluation of Flora Species of Conservation Importance Recorded within the                          Assessment Area and Project Site

Table 9.22     Evaluation of Fauna Species of Conservation Importance Recorded within the Assessment Area and Project Site

Table 9.23     Estimated Habitat Loss for the Proposed Layout Scheme at Sub-Area 1 of the Project Site

Table 9.24     Summary of Construction Phase and Operational Phase Impacts

Table 9.25     Cumulative Impacts from Concurrent Projects near the Project Site

Table 10.1     Fish Pond Area and Annual Fish Production in Hong Kong from 2009 to 2018

Table 10.2     Fisheries Impact on Fish Ponds within the Assessment Area

Table 10.3       Cumulative Impacts from Concurrent Projects near the Project Site

 

FIGURES

Figure 8.1        Delineation of Sub-Area 1 to Sub-Area 4 at Fanling Golf Course

Figure 8.2        Notional Layout Plan of Proposed Housing Development at Sub-Area 1

Figure 8.3        Land Use Activities at Sub-Area 1

Figure 8.4        Land Use Activities at Sub-Areas 2 and 3

Figure 8.5        Land Use Activities at Sub-Area 4

Figure 8.6        Land Use Activities Outside the Project Development Area

Figure 8.7        Proposed RBRGs Land Use at Sub-Area 1

Figure 8.8        Proposed RBRGs Land Use at Sub-Areas 2 to 4

Figure 9.1        Ecological Survey Locations within the 500m Assessment Area

Figure 9.2        Recognized Sites of Conservation Importance

Figure 9.3a      Habitat Map and Potential Ecological Corridor

Figure 9.3b      Habitats Photos Recorded within the 500m Assessment Area

Figure 9.4        Habitat Map and Locations of Flora Species of Conservation Importance

Figure 9.4a      Habitat Map and Locations of Flora Species of Conservation Importance (Zoom-in to Project Site Sub-Area 1)

Figure 9.4b      Habitat Map and Locations of Flora Species of Conservation Importance (Zoom-in to Project Site Sub-Area 2)

Figure 9.4c      Habitat Map and Locations of Flora Species of Conservation Importance (Zoom-in to Project Site Sub-Area 3)

Figure 9.4d      Habitat Map and Locations of Flora Species of Conservation Importance (Zoom-I            n to Project Site Sub-Area 4)

Figure 9.4e      Photos of Species of Conservation Importance Recorded within the 500m Assessment Area

Figure 9.5        Habitat Map and Locations of Fauna Species of Conservation Importance

Figure 9.5a      Habitat Map and Locations of Fauna Species of Conservation Importance (Zoom-in to Project Site Sub-Area 1)

Figure 9.5b      Habitat Map and Locations of Fauna Species of Conservation Importance (Zoom-in to Project Site Sub-Area 2)

Figure 9.5c      Habitat Map and Locations of Fauna Species of Conservation Importance (Zoom-in to Project Site Sub-Area 3)

Figure 9.5d      Habitat Map and Locations of Fauna Species of Conservation Importance (Zoom-in to Project Site Sub-Area 4)

Figure 9.6a      Major Flight-lines of Ardeids of Ho Sheung Heung and Man Kam To Road Egretry

Figure 9.6b      Major Flight-lines of Ardeids of North District Park Day Roost

Figure 9.6c      Major Flight-lines of Ardeids of North District Park Egretry

Figure 9.7        Proposed Layout Scheme Overlaid with Habitat Map

Figure 9.8        Proposed Location of Woodland Compensation

Figure 10.1      Location of Pond within and in the vicinity of the 500m Assessment Area

 

APPENDICES

 

Appendix 8.1              Contamination Assessment Plan (CAP)

Appendix 8.2              Geochemical Atlas of Hong Kong – Arsenic in Stream Sediment

Appendix 9A(1)          Plant Species Recorded within the Assessment Area

Appendix 9A(2)          Plant Species Recorded within the Four Sub-Areas of Project Site 

Appendix 9B(1)          Mammal Species Recorded within the Assessment Area

Appendix 9B(2)          Mammal Species Recorded within the Four Sub-Areas of Project Site

Appendix 9C(1)          Bird Species Recorded within the Assessment Area

Appendix 9C(2)          Bird Species Recorded within the Four Sub-Areas of Project Site

Appendix 9D(1)          Herpetofauna Species Recorded within the Assessment Area

Appendix 9D(2)          Herpetofauna Species Recorded within the Four Sub-Areas of Project Site

Appendix 9E(1)          Butterfly Species Recorded within the Assessment Area

Appendix 9E(2)          Butterfly Species Recorded within the Four Sub-Areas of Project Site

Appendix 9F(1)          Odonate Species Recorded within the Assessment Area

Appendix 9F(2)          Odonate Species Recorded within the Four Sub-Areas of Project Site

Appendix 9G              Moth Species Recorded within the Assessment Area

Appendix 9H              Aquatic Fauna Species Recorded within the Assessment Area