TECHNICAL STUDY ON PARTIAL DEVELOPMENT OF FANLING GOLF COURSE SITE FEASIBILITY STUDY

 

ENVIRONMENT IMPACT ASSESSMENT REPORT

 

CONTENTS

 

11        LANDSCAPE AND VISUAL IMPACT ASSESSMENT

11.1     Introduction

11.2     Environmental Legislation, Standards and Guideline           

11.3     Planning and Development Control Framework

11.4     The Proposed Development

11.5     Assessment Methodology

11.6     Landscape Baseline Condition          

11.7     Visual Baseline Condition     

11.8     Potential Sources of Impacts 

11.9     Landscape and Visual Impact Before Mitigation      

11.10   Mitigation Measures  

11.11   Residual Impact         

11.12   Cumulative Impacts   

11.13   Implementation and Maintenance

11.14   Conclusion     

 

12        CULTURAL HERITAGE IMPACT ASSESSMENT

12.1     Objectives of this Assignment           

12.2     Legislation, Standards and Criteria   

12.3     Cultural Heritage Impact Assessment Methodology

12.4     Cultural heritage Baseline review     

12.5     Built Heritage Impact Assessment    

12.6     Archaeological Impact Assessment   

12.7     Conclusion and summary      

12.8     Bibliography and references  

 

13        ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS

13.1     Introduction   

13.2     Project Organisation  

13.3     EM&A Manual          

13.4     Environmental Mitigation Implementation Schedule

13.5     EM&A Programme

           

14        SUMMARY OF ENVIRONMENTAL OUTCOME

14.1     Introduction   

14.2     Environmentally Friendly Options Recommended to Avoid Environmental Impacts           

14.3     Environmental Designs Recommended to Minimise and Mitigate Environmental Impacts

14.4     Summary of Key Environmental Problems and Sensitive Areas Avoided

14.5     Estimated Population Protected from Various Environmental Impacts         

14.6     Environmental Benefits of Environmental Protection Measures Recommended

 

15        CONCLUSION        

15.1     General          

15.2     Air Quality Impact    

15.3     Noise Impact 

15.4     Water Quality

15.5     Sewage and Sewerage Treatment Implications        

15.6     Waste Management   

15.7     Land Contamination  

15.8     Ecology Impact         

15.9     Fisheries Impact        

15.10   Landscape and Visual Impacts          

15.11   Cultural Heritage       

15.12   Environmental Monitoring and Audit Requirements

           

FIGURES

Figure 11.1                  Review of Planning and Development Control Framework

Figure 11.2                  Landscape Resources Plan – Tree of Particular Interest

Figure 11.2.1               Landscape Resources Plan – Tree of Particular Interest

Figure 11.2.2               Landscape Resources Plan – Tree of Particular Interest

Figure 11.2.2.1            Landscape Resources Plan – Tree of Particular Interest (Inset Plan 1)

Figure 11.2.3               Landscape Resources Plan – Tree of Particular Interest

Figure 11.2.4               Landscape Resources Plan – Tree of Particular Interest

Figure 11.2.4.1            Landscape Resources Plan – Tree of Particular Interest (Inset Plan 2 &3)

Figure 11.2.5               Landscape Resources Plan – Plant with Conservation Importance

Figure 11.2.6               Landscape Resources Plan – Plant with Conservation Importance

Figure 11.2.7               Landscape Resources Plan – Plant with Conservation Importance

Figure 11.2.8               Landscape Resources Plan – Plant with Conservation Importance

Figure 11.2.9               Landscape Resources Plan – Plant with Conservation Importance

Figure 11.3                  Landscape Character Area Plan

Figure 11.4                  Aerial Photo

Figure 11.5                  Visual Sensitive Receiver Plan

Figure 11.6                  Key Public Viewing Point Plan

Figure 11.7.1               Photos of Landscape Resources (Sheet 1)

Figure 11.7.2               Photos of Landscape Resources (Sheet 2)

Figure 11.7.3               Photos of Landscape Resources (Sheet 3)

Figure 11.7.4               Photos of Landscape Resources (Sheet 4)

Figure 11.7.5               Photos of Landscape Resources (Sheet 5)

Figure 11.7.6               Record of Pterocarpus Indicus - Landscape Resources

Figure 11.8                  Photos of Landscape Character Area

Figure 11.9.1               Mitigation Plan (Overall)

Figure 11.9.2               Mitigation Plan (Sub-area 1)

Figure 11.10.1             Photomontage of VP1

Figure 11.10.2             Photomontage of VP2

Figure 11.10.3             Photomontage of VP3

Figure 11.10.4             Photomontage of VP4

Figure 11.10.5             Photomontage of VP5

Figure 11.10.6             Photomontage of VP6

Figure 11.10.7           Photomontage of VP7

Figure 11.10.8             Photomontage of VP8

Figure 11.10.9             Photomontage of VP9

Figure 11.10.10           Photomontage of VP10

Figure 11.10.11           Photomontage of VP11

Figure 11.10.12           Photomontage of VP12

Figure 11.10.13           Photomontage of VP13

Figure 11.10.14           Photomontage of VP14

Figure 11.10.15           Photomontage of VP15

Figure 11.10.16           Photomontage of VP16

Figure 11.11                Conceptual Landscape Plan (Sub-area 1)

Figure 11.12                Master Layout Plan (Sub-area 1)

Figure 11.13.1             Impacts in Landscape Resources (Before Mitigation)

Figure 11.13.2             Impacts in Landscape Resources (After Mitigation)

Figure 11.13.3             Impacts in Landscape Character Area (Before Mitigation)

Figure 11.13.4             Impacts in Landscape Character Area (After Mitigation)

Figure 11.14.1             Proposed Housing Development - Section Plan

 

APPENDICES

 

Appendix 11.1             Tree Survey Plan

Appendix 11.2             Tree Assessment Schedule and Photos of Trees of Particular Interests

Appendix 11.2.1         Summary and Justifications for the Removal of Trees of Particular Interest

Appendix 11.2.2         Tree Survey Schedule

Appendix 11.3             Vegetation Plan (Non-tree Species) - Sub-area 1

Appendix 11.4             Tentative Layout of Proposed 1-Storey Building in Sub-area 2

Appendix 11.5             Tree Assessment Schedule and Tree Survey Plan for the affected Trees in Sub-area 2

Appendix 12A            Graded Historic Buildings Catalogue

Appendix 12B             Not Graded Historic Buildings, Structures and Graves Catalogue

Appendix 12C             Plates of Field Visit

Appendix 12D            Review of old maps, photos and aerial photographs

Appendix 12E             Supporting Documents

Appendix 13.1             Environmental Mitigation Implementation Schedule

Appendix 15.1             Key Assessment Assumptions and Limitation of Assessment Methodologies
Appendix 15.2             Summary of Environment Impacts Associated with the Project