Drainage Improvement Works in Ta Kwu Ling
____________________________
Environmental
Impact Assessment Report
____________________________
Figures (Volume
II)
List of Figures
Project
Site |
|
Flood
Extent Map under 10-Year Return Period under Existing Condition |
|
Alternative
Project Alignment Options |
|
Design
Option 1 – Conforming Design (General Layout Plan) |
|
Design
Option 1 – Conforming Design (Typical Sections) |
|
General
Layout Plan for Proposed Channel at Ta Kwu Ling |
|
Typical
Sectional View of Proposed Drainage Channel TKL04 |
|
Typical
Sectional View of Proposed Drainage Channel TKL05 (Sheet 1 of 2) |
|
Typical
Sectional View of Proposed Drainage Channel TKL05 (Sheet 2 of 2) |
|
River
Park Phase 1 Sections (Miscellaneous Details) |
|
Design
Option 3 – Bypass Box Culvert Scheme (General Layout Plan) |
|
Design
Option 3 – Bypass Box Culvert Scheme (Typical Sections and Details) |
|
Design
Option 4 – Drainage Tunnel with Pumping Station (General Layout Plan) |
|
Design
Option 4 – Drainage Tunnel with Pumping Station (Typical Sections) |
|
Design
Option 4 – Drainage Tunnel with Pumping Station (Typical Sections of Pumping
Section and Bypass System) |
|
Design
Option 5 – Widening and Deepening Scheme (General Layout Plan) |
|
Design
Option 5 – Deepening Scheme with Pump Station (Widening Scheme) |
|
Schematic
Diagram of Alternative Drainage Options |
|
Photos
of Lining Options (1/2) |
|
Photos
of Lining Options (2/2) |
|
Working
Sections in Project Site |
|
Location
Plan |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (1 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (2 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (3 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (4 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (5 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (6 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (7 of 8) |
|
Proposed
Drainage Improvement Works at Ta Kwu Ling (8 of 8) |
|
Existing
River General Layout Plan – TKL04 |
|
Existing
River General Layout Plan – TKL04 (Portion A) |
|
Existing
River General Layout Plan – TKL04 (Portion B) |
|
Existing
River General Layout Plan – TKL04 (Portion C) |
|
Existing
River Cross Section – TKL04 (Sheet 1 of 2) |
|
Existing
River Cross Section – TKL04 (Sheet 2 of 2) |
|
Existing
River General Layout Plan – TKL05 |
|
Existing
River General Layout Plan – TKL05 (Portion A) |
|
Existing
River General Layout Plan – TKL05 (Portion B) |
|
Existing
River General Layout Plan – TKL05 (Portion C) |
|
Existing
River General Layout Plan – TKL05 (Portion D) |
|
Existing
River General Layout Plan – TKL05 (Portion E) |
|
Existing
River Cross Section – TKL05 (Sheet 1 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 2 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 3 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 4 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 5 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 6 of 7) |
|
Existing
River Cross Section – TKL05 (Sheet 7 of 7) |
|
Typical
Water Diversion Scheme for Construction of Channel TKL05 (1/3) |
|
Typical
Water Diversion Scheme for Construction of Channel TKL05 (2/3) |
|
Typical
Water Diversion Scheme for Construction of Channel TKL05 (3/3) |
|
Project
Interfacing Plan |
|
Air
Sensitive Receivers |
|
Noise Sensitive
Receivers |
|
Location
of Water Sensitive Receivers and EPD Water Quality Monitoring Stations |
|
Suspected
Land Contamination Sites Project Area |
|
Proposed
Sampling Location |
|
Study
Area |
|
Locations
of the species of conservation importance recorded within the Study Area and
Proposed Works Limit from reviewed literature |
|
Survey
Transect and Terrestrial Sampling Point within the Study Area |
|
Sampling
Point for Freshwater Aquatic Assemblage within the Study Area |
|
Habitat
Map and Species of Conservation Importance |
|
Indicative
Locations and Conceptual Design of Animal Corridor |
|
Location
of Oyster Culture Area and Area of Fish Ponds in
Deep Bay Area |
|
Location
of Ponds within the Study Area |
|
Cultural
Heritage Assessment Area and Works Area |
|
Geology
for Cultural Heritage Assessment Area |
|
Test
Pits and Auger Holes Locations recorded from Previous Studies |
|
500 m
Study Area |
|
Visual
Envelope and Locations of Visually Sensitive Receiver (VSR) and Vantage Point
(VP) |
|
Outline
Zoning Plan (OZP) |
|
Landscape
Character Areas (LCA) |
|
Landscape
Resources (LR) |
|
Landscape
Resources (LR) (Zoom-in 1 of 6) |
|
Landscape
Resources (LR) (Zoom-in 2 of 6) |
|
Landscape
Resources (LR) (Zoom-in 3 of 6) |
|
Landscape
Resources (LR) (Zoom-in 4 of 6) |
|
Landscape
Resources (LR) (Zoom-in 5 of 6) |
|
Landscape
Resources (LR) (Zoom-in 6 of 6) |
|
Landscape
Resources and Trees with Particular Interest within the Study Area |
|
Landscape
Resources and Trees with Particular Interest within the Study Area (Zoom-in 1
of 4) |
|
Landscape
Resources and Trees with Particular Interest within the Study Area (Zoom-in 2
of 4) |
|
Landscape
Resources and Trees with Particular Interest within the Study Area (Zoom-in 3
of 4) |
|
Landscape
Resources and Trees with Particular Interest within the Study Area (Zoom-in 4
of 4) |
|
Photographic
Record of Landscape Resources |
|
Photographic
Record of Landscape Character Area |
|
Photographic
Record of Visually Sensitive Receivers |
|
Photomontage
from VP1 - View from Further east on the Tsung Shan Range (Sheet 1 of 2) |
|
Photomontage
from VP1 - View from Further east on the Tsung Shan Range (Sheet 2 of 2) |
|
Photomontage
from VP2 - View from Ping Che Road (Sheet 1 of 2) |
|
Photomontage
from VP2 - View from Ping Che Road (Sheet 2of 2) |
|
Photomontage
from VP3 - View from Main access of Lei Uk Village
(Sheet 1 of 2) |
|
Photomontage
from VP3 - View from Main access of Lei Uk Village
(Sheet 2 of 2) |
|
Photomontage
from VP4 - View from Main access of Tai Po Tin (Sheet 1 of 2) |
|
Photomontage
from VP4 - View from Main access of Tai Po Tin (Sheet 2 of 2) |
|
Photomontage
from VP5 - View from Pedestrian crossing near Ping Che Village (Sheet 1 of 2)
|
|
Photomontage
from VP5 - View from Pedestrian crossing near Ping Che Village (Sheet 2 of 2) |
|
Photomontage
from VP6 - View from Pedestrian crossing near Caritas Nursery School – Ta Kwu Ling (Sheet 1 of 2) |
|
Photomontage
from VP6 - View from Pedestrian crossing near Caritas Nursery School – Ta Kwu Ling (Sheet 2 of 2) |
|
Photomontage
from VP7 - Ping Yuen Road near Ping Yeung Village (Sheet 1 of 2) |
|
Photomontage
from VP7 - Ping Yuen Road near Ping Yeung Village (Sheet 2 of 2) |
|
Landscape
Character Impacts During Construction |
|
Landscape
Character Impacts at Day 1 of Operation |
|
Landscape
Character Impacts at Year 10 of Operation |
|
Landscape
Resources Impacts During Construction |
|
Landscape
Resources Impacts at Day 1 of Operation |
|
Landscape
Resources Impacts at Year 10 of Operation |
|
Landscape
Mitigation Plan |