Drainage Improvement Works in Ta Kwu Ling

____________________________

                                     

Environmental Impact Assessment Report

____________________________

 

Figures (Volume II)


List of Figures

 

Figure 1.1

Project Site

Figure 1.2

Flood Extent Map under 10-Year Return Period under Existing Condition

Figure 2.1

Alternative Project Alignment Options

Figure 2.2

Design Option 1 – Conforming Design (General Layout Plan)

Figure 2.3

Design Option 1 – Conforming Design (Typical Sections)

Figure 2.4

General Layout Plan for Proposed Channel at Ta Kwu Ling

Figure 2.5

Typical Sectional View of Proposed Drainage Channel TKL04

Figure 2.6

Typical Sectional View of Proposed Drainage Channel TKL05 (Sheet 1 of 2)

Figure 2.7

Typical Sectional View of Proposed Drainage Channel TKL05 (Sheet 2 of 2)

Figure 2.8

River Park Phase 1 Sections (Miscellaneous Details)

Figure 2.9

Design Option 3 – Bypass Box Culvert Scheme (General Layout Plan)

Figure 2.10

Design Option 3 – Bypass Box Culvert Scheme (Typical Sections and Details)

Figure 2.11

Design Option 4 – Drainage Tunnel with Pumping Station (General Layout Plan)

Figure 2.12

Design Option 4 – Drainage Tunnel with Pumping Station (Typical Sections)

Figure 2.13

Design Option 4 – Drainage Tunnel with Pumping Station (Typical Sections of Pumping Section and Bypass System)

Figure 2.14

Design Option 5 – Widening and Deepening Scheme (General Layout Plan)

Figure 2.15

Design Option 5 – Deepening Scheme with Pump Station (Widening Scheme)

Figure 2.15a

Schematic Diagram of Alternative Drainage Options

Figure 2.16

Photos of Lining Options (1/2)

Figure 2.17

Photos of Lining Options (2/2)

Figure 2.18

Working Sections in Project Site

Figure 2.19

Location Plan

Figure 2.19a

Proposed Drainage Improvement Works at Ta Kwu Ling (1 of 8)

Figure 2.19b

Proposed Drainage Improvement Works at Ta Kwu Ling (2 of 8)

Figure 2.19c

Proposed Drainage Improvement Works at Ta Kwu Ling (3 of 8)

Figure 2.19d

Proposed Drainage Improvement Works at Ta Kwu Ling (4 of 8)

Figure 2.19e

Proposed Drainage Improvement Works at Ta Kwu Ling (5 of 8)

Figure 2.19f

Proposed Drainage Improvement Works at Ta Kwu Ling (6 of 8)

Figure 2.19g

Proposed Drainage Improvement Works at Ta Kwu Ling (7 of 8)

Figure 2.19h

Proposed Drainage Improvement Works at Ta Kwu Ling (8 of 8)

Figure 2.20a

Existing River General Layout Plan – TKL04

Figure 2.20b

Existing River General Layout Plan – TKL04 (Portion A)

Figure 2.20c

Existing River General Layout Plan – TKL04 (Portion B)

Figure 2.20d

Existing River General Layout Plan – TKL04 (Portion C)

Figure 2.20e

Existing River Cross Section – TKL04 (Sheet 1 of 2)

Figure 2.20f

Existing River Cross Section – TKL04 (Sheet 2 of 2)

Figure 2.20g

Existing River General Layout Plan – TKL05

Figure 2.20h

Existing River General Layout Plan – TKL05 (Portion A)

Figure 2.20i

Existing River General Layout Plan – TKL05 (Portion B)

Figure 2.20j

Existing River General Layout Plan – TKL05 (Portion C)

Figure 2.20k

Existing River General Layout Plan – TKL05 (Portion D)

Figure 2.20l

Existing River General Layout Plan – TKL05 (Portion E)

Figure 2.20m

Existing River Cross Section – TKL05 (Sheet 1 of 7)

Figure 2.20n

Existing River Cross Section – TKL05 (Sheet 2 of 7)

Figure 2.20o

Existing River Cross Section – TKL05 (Sheet 3 of 7)

Figure 2.20p

Existing River Cross Section – TKL05 (Sheet 4 of 7)

Figure 2.20q

Existing River Cross Section – TKL05 (Sheet 5 of 7)

Figure 2.20r

Existing River Cross Section – TKL05 (Sheet 6 of 7)

Figure 2.20s

Existing River Cross Section – TKL05 (Sheet 7 of 7)

Figure 2.21

Typical Water Diversion Scheme for Construction of Channel TKL05 (1/3)

Figure 2.22

Typical Water Diversion Scheme for Construction of Channel TKL05 (2/3)

Figure 2.23

Typical Water Diversion Scheme for Construction of Channel TKL05 (3/3)

Figure 2.24

Project Interfacing Plan

Figure 3.1

Air Sensitive Receivers

Figure 4.1

Noise Sensitive Receivers

Figure 5.1

Location of Water Sensitive Receivers and EPD Water Quality Monitoring Stations

Figure 7.1

Suspected Land Contamination Sites Project Area

Figure 7.2

Proposed Sampling Location

Figure 8.1

Study Area

Figure 8.2

Locations of the species of conservation importance recorded within the Study Area and Proposed Works Limit from reviewed literature

Figure 8.3

Survey Transect and Terrestrial Sampling Point within the Study Area

Figure 8.4

Sampling Point for Freshwater Aquatic Assemblage within the Study Area

Figure 8.5

Habitat Map and Species of Conservation Importance

Figure 8.6

Indicative Locations and Conceptual Design of Animal Corridor

Figure 9.1

Location of Oyster Culture Area and Area of Fish Ponds in Deep Bay Area

Figure 9.2

Location of Ponds within the Study Area

Figure 10.1

Cultural Heritage Assessment Area and Works Area

Figure 10.2

Geology for Cultural Heritage Assessment Area

Figure 10.3

Test Pits and Auger Holes Locations recorded from Previous Studies

Figure 11.1

500 m Study Area

Figure 11.2

Visual Envelope and Locations of Visually Sensitive Receiver (VSR) and Vantage Point (VP)

Figure 11.3

Outline Zoning Plan (OZP)

Figure 11.4

Landscape Character Areas (LCA)

Figure 11.5

Landscape Resources (LR)

Figure 11.5a

Landscape Resources (LR) (Zoom-in 1 of 6)

Figure 11.5b

Landscape Resources (LR) (Zoom-in 2 of 6)

Figure 11.5c

Landscape Resources (LR) (Zoom-in 3 of 6)

Figure 11.5d

Landscape Resources (LR) (Zoom-in 4 of 6)

Figure 11.5e

Landscape Resources (LR) (Zoom-in 5 of 6)

Figure 11.5f

Landscape Resources (LR) (Zoom-in 6 of 6)

Figure 11.6

Landscape Resources and Trees with Particular Interest within the Study Area

Figure 11.6a

Landscape Resources and Trees with Particular Interest within the Study Area (Zoom-in 1 of 4)

Figure 11.6b

Landscape Resources and Trees with Particular Interest within the Study Area (Zoom-in 2 of 4)

Figure 11.6c

Landscape Resources and Trees with Particular Interest within the Study Area (Zoom-in 3 of 4)

Figure 11.6d

Landscape Resources and Trees with Particular Interest within the Study Area (Zoom-in 4 of 4)

Figure 11.7a-b

Photographic Record of Landscape Resources

Figure 11.8

Photographic Record of Landscape Character Area

Figure 11.9a-d

Photographic Record of Visually Sensitive Receivers

Figure 11.10a

Photomontage from VP1 - View from Further east on the Tsung Shan Range (Sheet 1 of 2)

Figure 11.10b

Photomontage from VP1 - View from Further east on the Tsung Shan Range (Sheet 2 of 2)

Figure 11.11a

Photomontage from VP2 - View from Ping Che Road (Sheet 1 of 2)

Figure 11.11b

Photomontage from VP2 - View from Ping Che Road (Sheet 2of 2)

Figure 11.12a

Photomontage from VP3 - View from Main access of Lei Uk Village (Sheet 1 of 2)

Figure 11.12b

Photomontage from VP3 - View from Main access of Lei Uk Village (Sheet 2 of 2)

Figure 11.13a

Photomontage from VP4 - View from Main access of Tai Po Tin (Sheet 1 of 2)

Figure 11.13b

Photomontage from VP4 - View from Main access of Tai Po Tin (Sheet 2 of 2)

Figure 11.14a

Photomontage from VP5 - View from Pedestrian crossing near Ping Che Village (Sheet 1 of 2)

Figure 11.14b

Photomontage from VP5 - View from Pedestrian crossing near Ping Che Village (Sheet 2 of 2)

Figure 11.15a

Photomontage from VP6 - View from Pedestrian crossing near Caritas Nursery School – Ta Kwu Ling (Sheet 1 of 2)

Figure 11.15b

Photomontage from VP6 - View from Pedestrian crossing near Caritas Nursery School – Ta Kwu Ling (Sheet 2 of 2)

Figure 11.16a

Photomontage from VP7 - Ping Yuen Road near Ping Yeung Village (Sheet 1 of 2)

Figure 11.16b

Photomontage from VP7 - Ping Yuen Road near Ping Yeung Village (Sheet 2 of 2)

Figure 11.17

Landscape Character Impacts During Construction

Figure 11.18

Landscape Character Impacts at Day 1 of Operation

Figure 11.19

Landscape Character Impacts at Year 10 of Operation

Figure 11.20

Landscape Resources Impacts During Construction

Figure 11.21

Landscape Resources Impacts at Day 1 of Operation

Figure 11.22

Landscape Resources Impacts at Year 10 of Operation

Figure 11.23

Landscape Mitigation Plan