Agreement No. CE 72/2019 (EP) Contaminated Sediment Disposal Facility at West
of Lamma Island – Investigation Environmental
Impact Assessment (EIA) Report for the New Contaminated Sediment Disposal
Facility |
|
EIA
REPORT (PDF) |
|
TABLE OF CONTENTS |
|
1.
INTRODUCTION 4.
MARINE ECOLOGICAL IMPACT ASSESSMENT 5.
FISHERIES IMPACT ASSESSMENT 6.
WASTE MANAGEMENT IMPLICATIONS 9.
AIR QUALITY 10.
NOISE 11.
ENVIRONMENTAL MONITORING AND AUDIT 12.
CONCLUSION |
|
|
|
LIST OF FIGURES |
|
Figure
2.1 Typical
Design of CAD Facility Figure
2.2 Typical
Design of Nearshore CDF Figure
2.3a Absolute
Environmental Constraints in Southern Waters of Hong Kong Figure
2.3b Absolute
Physical Constraints in Southern Waters of Hong Kong Figure
2.3c Absolute Social
Constraints in Southern Waters of Hong Kong Figure
2.4a Potential
Environmental Constraints in Southern Waters of Hong Kong Figure
2.4b Potential
Physical Constraints in Southern Waters of Hong Kong Figure
2.4c Potential Social
Constraints in Southern Waters of Hong Kong Figure
2.5 Marine Geophysical
Surveys Figure
2.6 Key Area Identified for
Potential CMP Development Figure
2.7 Location for
Site Investigation Figure
2.8 Preliminary
layout of the proposed CMPs Figure
3.1 Locations
of EPD Monitoring Stations and Typhoon Shelter Stations in the Study Area Figure
3.2 Locations of
Sediment Monitoring Data from the EPD Monitoring Stations Figure
3.3 Locations of the
Identified Water Sensitive Receivers (WSRs) Figure
3.4 Modelled
Bathymetry Figure
3.5 Cross
Sections of Selected Major Channels Figure 3.6 Selected Velocity Points Figure
4.1 Marine Habitats Identified
within the Assessment Area Figure
4.4 Representative Photographic Records from Drop
Camera Survey Figure
4.5 Location of Finless Porpoise
Sightings during Marine Mammal Survey Figure
5.1 Fisheries
Sensitive Receivers Figure
6.1 Locations
for Sediment Sampling and Testing Figure
7.1 Key Area Identified
for Potential CMP Development / MAI Assessment Area Figure
7.2 Geophysical
Survey Area and Location of Sonar Contacts Figure
7.3 SC008 on historic Admiralty
Chart “Hong Kong, No. 1466” dated from 1843 to 1966 Figure
7.4 SC008 overlaid on 2020
Electronic Navigational Chart Figure
8.1 Indicative Pathways to
Potential Contaminant Release Figure
9.1 Locations of Representative Air Sensitive
Receivers in the vicinity of the Project Figure
10.1 Location of Representative Noise
Sensitive Receivers in the vicinity of the Project |
|
|
|
LIST OF APPENDICES |
|
Annex 1A Details
of the Stakeholder Engagement Activities Undertaken and the Feedback Received
Annex 3A Method
Statement for Water Quality Modelling Assessment Annex 3B Contour
Plots For Construction Phase Sediment Dispersion Modelling Annex 3C Time
Series Plots Annex 3D Water
Current Vector Plots for Operation Phase Change in Flow Regime Assessment Annex 3E Water
Quality Impact Assessment for CMPs located at West of the Key Area Annex 3F Water
Quality Impact Assessment for CMPs during Initial Years of the Project Annex 4A Marine Ecology -
Literature Review Annex 4B Method Statement for Marine Ecological Survey Annex 4C Data on Coral
Surveys Annex 4D Data
on Subtidal Benthos Survey Annex 4E Data on Marine
Mammal Survey Annex 5A Fisheries –
Literature Review Annex 5B Method
Statement for Fisheries Impact Assessment Annex 5C Fisheries Survey
Results Annex 5D Adult
Fish Production Survey Data Annex 5E Ichthyoplankton
and Fish Post-larvae Survey Data Annex 5F Commercial
Value of Adult Fish and Crustacean Species Recorded from Field Surveys Annex 6A Proposal for
Field Investigation for Assessment of Waste Management Implications Annex 6B Laboratory
Test Reports Annex 7A Side Scan Sonar
and Echo Sound Track Plot Annex 7B Seabed
Features Map Annex 7C Sonar
Contacts Images Annex 8A Bioaccumulation
Assessment Annex 8B Human
Health Risk Assessment Methodology Annex 11A Implementation
Schedule |
|
LIST OF TABLES |
|
Table
2.1 Identified Absolute and
Potential Constraints in Southern Waters of Hong Kong Table
2.2 Evaluation of the Study
Area against the Assessment Criteria Table
2.3 Nearby Physical
Constraints Table
2.4 Tentative Programme of the
Project (Indicative for the first three CMPs) Table
3.1 Summary of Water Quality
Objectives for Southern WCZ, Western Buffer WCZ and Victoria Harbour WCZ Table
3.2 Summary of EPD Routine
Water Quality Monitoring Data from Selected Stations within the Assessment
Area (1986 – 2020) Table
3.3 Summary of EPD Routine
Water Quality Monitoring Data from Selected Stations within the Assessment
Area (1986 – 2020) Table
3.4 Summary of EPD Typhoon
Shelter Water Quality Monitoring Data within the Assessment Area (1986 –
2020) Table
3.5 Summary of EPD Routine
Marine Sediment Quality Monitoring Data within the Assessment Area (1986-2020) Table
3.6 Summary of EPD Routine
Typhoon Shelters and Government Dockyard Sediment Quality Monitoring Data at
Selected Locations within the Assessment Area (1986 – 2020) Table
3.7 Highest Contaminant Levels
among all Stations from the Sediment Sampling conducted in mid-2020 Table
3.8 Water Sensitive Receivers
(WSRs) in the Vicinity of the Project Site Table
3.9 WSD’s Water Quality
Criteria for Water at Seawater Intakes Table
3.10 Allowable Increase in SS
(mg L-1) Levels for Water Quality Sensitive Receivers and Observation Points Table
3.11 Allowable DO Depletion (mg
L-1) for Water Quality Sensitive Receivers and Observation Points Table
3.12 Summary of Assessment
Criteria for Dissolved Metals and Organic Contaminants Table
3.13 Predicted SS Elevation at
Identified WSRs Table
3.14 Predicted Sedimentation
Flux (g/m2/day) at the Identified Coral WSRs Table
3.15 Predicted Maximum
Conservative Tracer Concentrations at WSRs under various Scenarios Table
3.16 Estimation of Contaminant Levels
at the Most Impacted WSRs Table
3.17 Predicted Tidal Discharges
across Major Nearby Channels Table
3.18 Predicted Percentile
Distribution of Tidal Discharges across Major Nearby Channels (Black: Base
Case; Blue: With Project) Table
3.19 Predicted Instantaneous
Tidal Discharges across Major Nearby Channels (Black: Base Case; Blue: With
Project) Table
3.20 Predicted Average Velocity
at Selected Locations across Modelled Area Table
3.21 Predicted Modal Class of
Current Direction at Selected Locations across Modelled Area Table
3.22 Predicted Bed Shear Stress
Level at Project Site (Solid Line: Base Case; Dashed Line: With Project) Table
4.1 Summary of Marine
Ecological Survey Schedule Table
4.2 Summary of Results of
Qualitative Spot Dive Reconnaissance Check and REA Survey Table
4.3 Summary of Drop Camera
Survey Results Table
4.4 Density and Indices of
Richness, Evenness and Diversity of Infaunal Assemblages at the Sampling
Locations for the Soft Bottom Habitat Surveys at the Study Area during the
Dry Season Table
4.5 Density and Indices of
Richness, Evenness and Diversity of Infaunal Assemblages at the Sampling
Locations for the Soft Bottom Habitat Surveys at the Study Area during the
Wet Season Table
4.6 Ecological Importance of
Recognised Sites of Conservation Importance in the vicinity of the Project Table
4.7 Ecological Importance of
Sub-tidal Hard Bottom Habitat (Coral Communities) in the vicinity of the
Project Table
4.8 Ecological Importance of
Subtidal Soft Benthos Assemblages in the vicinity of the Project Table
4.9 Ecological Importance of
Marine Waters in the vicinity of the Project Table
4.10 Species of Conservation
Importance within the Assessment Area Table
4.11 Approximate Shortest
Distance to Marine Ecological Sensitive Receivers in the vicinity of the
Project Table
4.12 Potential Impacts to Marine
Ecological Resources (Excluding FP) Table
4.13 Potential Impacts to
Finless Porpoises Table
4.14 Significance of Ecological
Impacts Associated with the Construction and Operation Activities of the Proposed
Project Evaluated in accordance with EIAO-TM Table
5.1 Evaluation of Fisheries
Impacts in accordance to the Criteria described in Annex 9 of EIAO-TM Table
6.1 Government Waste Disposal
Facilities for Construction Waste Table
6.2 HKSAR Government Charging
System for Disposal of Dredged Sediment Table
6.3 Marine Sediment Analytical
Results Table
6.4 Estimated Volumes of
Sediments for each CMP Table
7.1 Geophysical Survey
Equipment Table
7.2 Sonar Contact Table
8.1 Calculations of Dose and
Subsequent Incremental Carcinogenic Risk Levels Table
8.2 Hazard Quotients for
Populations of Concern Table
9.1 Hong Kong Air Quality
Objectives Table
9.2 Identified Representative
ASRs Table
9.3 Concentrations of Air
Pollutants Measured at HK Electric’s Cheung Chau AQMS in the Recent Three
Years (2018-2020) Table
9.4 Concentrations of Air
Pollutants Measured at HK Electric’s Ap Lei Chau AQMS in the Recent Three
Years (2018-2020) Table
9.5 Background Air Pollutant
Concentrations Predicted by PATH Model (v2.1) in 2024 Table
10.1 EIAO-TM Daytime
Construction Noise Standards (Leq, 30 min dB(A)) Table
10.2 Area Sensitivity Ratings Table
10.3 Acceptable Noise Levels for
General Construction Works Table
10.4 Acceptable Noise Levels for
Operational Noise Table
12.1 Summary of Environmental
Assessment – Water Quality Table
12.2 Summary of Environmental
Assessment – Marine Ecology Table
12.3 Summary of Environmental
Assessment – Fisheries Table
12.4 Summary of Environmental
Assessment – Waste Management Table 12.5 Summary of Environmental Assessment –
Cultural Heritage Table
12.6 Summary of Environmental
Assessment – Hazard to Health Table
12.7 Summary of Environmental
Assessment – Air Quality Table
12.8 Summary of Environmental
Assessment – Noise Table
12.9 Key Assessment Assumptions,
Limitation of Assessment Methodologies and related Prior Agreement(s) with
the Relevant Authorities |