· Section 3 (Potential Contaminated Land Issues) of Annex 19 “Guidelines for Assessment of Impact on Sites of Cultural Heritage and Other Impacts” of the Technical Memorandum on Environmental Impact Assessment Process (EIAO-TM).
· Guidance Note for Contaminated Land Assessment and Remediation (Guidance Note)
The Guidance Note sets out the requirements for proper assessment and management of potentially contaminated sites such as oil installations (e.g. oil depots, petrol filling stations), gas works, power plants, shipyards / boatyards, chemical manufacturing / processing plants, steel mills / metal workshops, car repairing / dismantling workshops and scrap yards. In addition, this Guidance Note provides guidelines on how site assessments should be conducted and analysed and suggests practical remedial measures that can be adopted for the remediation of contaminated sites.
· Practice Guide for Investigation and Remediation of Contaminated Land (Practice Guide)
This guide outlines typical investigation methods and remediation strategies for the range of potential contaminants typically encountered in Hong Kong.
· Guidance Manual for Use of Risk-based Remediation Goals for Contaminated Land Management (Guidance Manual)
The Guidance Manual introduces the risk-based approach in land contamination assessment and present instructions for comparison of soil and groundwater data to the Risk-Based Remediation Goals (RBRGs) for 54 Chemicals of Concern (COCs) commonly found in Hong Kong. The RBRGs were derived to suit Hong Kong conditions by following the international practice of adopting a risk-based methodology for contaminated land assessment and remediation and were designed to protect the health of people who could potentially be exposed to land impacted by chemicals under four broad post restoration land use categories. The RBRGs also serve as the remediation targets if remediation is necessary.
· Aerial photographs and topographic maps held by the Lands Department (LandsD);
· Hong Kong Geological Survey Map (Series HGM20) – Sheet Nos. 7 and 11 (1:20,000 and 1:100,000);
· Records on dangerous goods (DG), chemical wastes, chemical spillage/leakage and fire incidents from the identified potentially contaminated sites from Environmental Protection Department (EPD) and Fire Services Department (FSD); and
· Ground Investigation (GI) Report (Final) under the Project, September 2020.
General
Review of Historical Land Uses
Table 7.1 Aerial Photographs Reviewed
Year |
Site Description |
1963 |
The Lion Rock Tunnel was under construction. Lung Cheung Road and Waterloo Road were observed. The remaining portions of the Project Area were occupied by agricultural land and natural terrain. |
1976 |
The agricultural land was cleared and the existing Lion Rock Tunnel was constructed. At the Sha Tin Portal, the former administration building (existing Electronic & Mechanical (E&M) Building), former service reservoirs (existing surge tanks), the existing toll plaza and ventilation building S1 were observed. At the Kowloon Portal, control room, valve house and ventilation building K1 were observed. The Second Lion Rock Tunnel was under construction and construction works were observed at both portals. Realignments of Lung Cheung Road and Waterloo Road were observed to connect with Lion Rock Tunnel Road. Village houses and construction site were also observed at Hung Mui Kuk. |
1985 |
The existing Second Lion Rock Tunnel, Lion Rock Tunnel Office (Administration Building) and ventilation buildings (S2 and K2) were observed. The toll plaza was under expansion. The Lion Rock Country Park was established. Hung Mui Kuk Road and the existing car park at Hung Mui Kuk were also observed. |
1993 |
The toll plaza was expanded. The existing Kak Tin Village Nam Hin Road was observed. No significant land use changes were observed in the remaining areas of the Project Area. |
2003 |
The existing S1-2,
S2-2 Buildings associated with ventilation buildings (S1 & S2) and a car
park were observed at Sha Tin Portal. |
2017 |
The existing K2-2
building associated with ventilation building K2 and expansion of
Administration Building were observed. |
Site Geology
Information from Government Departments
Site Reconnaissance
· Vehicle maintenance workshop in Administration Building (with a chemical storage area and a chemical waste storage area);
· Long vehicle maintenance and parking area (with a chemical storage area);
· Workshop at E&M Building;
· E&M Building (with a chemical store room and a generator);
· Ventilation Building S1 (with a generator, a transformer and a chemical waste storage area);
· S1-2 Building (with a generator and a transformer);
· Ventilation Building S2 (with a transformer and a chemical waste storage area);
· S2-2 Building (with a generator, a transformer and a chemical waste storage area);
· Ventilation Building K1 (with 2 transformers);
· Ventilation Building K2 (with 2 generators, a transformer and a chemical waste storage area);
· K2-2 Building (with a transformer)
Table 7.2 Summary of Potential Land Contamination Issues within the Project Area
Concerned Facility / Area |
Hotspot (approx. area) |
Site Observation / Current Potentially Contaminating Activities |
Corresponding Photographic Record Reference in the CAP in Appendix 7.1 |
Other Past Potential Contaminating Land Use / Activities |
Potential COCs |
Future Land Uses |
RBRGs Land Use Scenario |
Sha Tin Portal |
|||||||
Vehicle Maintenance Workshop in Administration Building (130 m2)
|
- |
The vehicle maintenance workshop is located in the southwest of the Administration Building in the centre of the Sha Tin Portal of LRT.
As reported by the site representative, maintenance works of tunnel operation vehicles are carried out at the vehicle maintenance workshop in Administration Building. Typical maintenance activities included greasing and lubrication involving use of lubricating oil.
As observed during the site walkover, the entire area was paved with intact concrete noted to be in good condition with no signs of oil stains / chemical spillages observed.
Based on EPD information, there were no spillage records. However, there were 2 valid CWP records for the site (refer to CWP ID 1 & 2 in Table 2.2 of the CAP).
|
Photo 2506 in 60604728/CAPb/PR3
|
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads |
Lower of Industrial or Public Park |
Chemical Storage Area (approx. 5 m2)
|
A chemical storage area (approx. 5 m2) was observed in the north of vehicle maintenance workshop in Administration Building. The chemicals identified including lubricating oils, hydraulic fluids, cleaning solvents (kerosene), thinners and anti-corrosive paints were stored in cabinets. The cabinets were in good conditions with no spillage observed in the vicinity.
|
Photo 2552 & 9731 in 60604728/CAPb/PR3
|
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads |
Lower of Industrial or Public Park |
|
Chemical Waste Storage Area |
A chemical waste storage area (approx. 6 m2) for the storage of spent lubricating oil drums was observed in the southwest of the vehicle maintenance workshop in Administration Building. The drums were stored on metal trays within a designated chemical waste storage container. The drums, metal trays and container were in good conditions with no spillage observed in the vicinity.
|
Photo 2526 & 9713 in 60604728/CAPb/PR3
|
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads |
Lower of Industrial or Public Park |
|
Air Compressor |
An oil-lubricated mobile air compressor was observed on a metal tray within a metal storage cage in the west of the vehicle maintenance workshop in Administration Building. The metal tray was in good conditions with no spillage observed in the vicinity. |
Photo 2518 in 60604728/CAPb/PR3 |
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads |
Lower of Industrial or Public Park |
|
Long Vehicle Maintenance and Parking
Area |
-
|
A long vehicle maintenance and parking area was observed in the east of the Sha Tin Portal of LRT. As reported by the site representative, maintenance of long vehicles for tunnel operation are carried out at the area.
As observed during the site walkover, the entire area was paved with intact concrete noted to be in good condition with no signs of oil stains / chemical spillages observed.
|
Photo 2621 & 9762 in 60604728/CAPb/PR3 |
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads / Car Park |
Lower of Industrial or Public Park |
Chemical Storage Area
|
A chemical storage area (approx. 3 m2) was observed in the east of long vehicle maintenance and parking area. The chemicals identified included lubricating oils and anti-corrosive paints and were stored in cabinets within the storage area. The cabinets were in good conditions with no spillage observed in the vicinity. |
Photo 4364 & 9760 in 60604728/CAPb/PR3 |
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads / Car Park |
Lower of Industrial or Public Park |
|
Workshop at E&M Building (100 m2)
|
-
|
A workshop was observed in the southwest of the E&M building. As reported by the site representative, repair and maintenance of equipment for tunnel operation are carried out at the workshop. The chemicals identified included lubricating oils and anti-corrosive paints, which were stored in cabinets within the workshop.
No stains were observed inside the workshop. The concrete paved floors and the cabinets were in good condition. |
Photo 2677, 2679, 2683 & 9782 in 60604728/CAPb/PR2 |
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads / Car Park |
Lower of Industrial or Public Park |
E&M Building |
Chemical Store Room (10 m2)
|
A store room for the storage of chemicals was observed in the E&M building located in the northeast of the Sha Tin Portal of LRT.
The chemicals identified included cleaning solvents (naphtha), lubricating oils, anti-corrosive paints and thinners, which were stored on shelves and directly on the concrete paved ground in the room. No stains were observed inside the chemical store room. The concrete paved floors and shelves were in good condition. |
Photo 9793, 9794 & 2709 in 60604728/CAPb/PR2 |
N/A |
Metals, VOCs, SVOCs and PCRs
|
Roads / Car Park |
Lower of Industrial or Public Park |
Generator (1 m2)
|
A generator with a 70 L diesel fuel tank was installed on a thick concrete slab in the southeast of the E&M building.
No stains were observed in the vicinity of the generator. The concrete paved floor and the concrete slab were in good condition. |
Photo 4378 in 60604728/CAPb/PR2 |
N/A |
Metals, PCRs, VOCs and SVOCs
|
Roads / Car Park |
Lower of Industrial or Public Park |
|
Ventilation Building S1 |
Generator S1 (15 m2)
|
A generator with a 300 L diesel fuel tank was installed on thick concrete slab in the ventilation building S1 in the south of the Sha Tin Portal of LRT.
No stains were observed in the vicinity of the generator. The concrete paved floors and the concrete slabs were in good condition.
|
Photo 9838 & 9840 in 60604728/CAPb/PR4 |
N/A |
Metals, PCRs, VOCs and SVOCs |
Roads |
Lower of Industrial or Public Park |
Transformer S1 (5 m2)
|
A transformer was installed on concrete paved ground in the transformer room (substation D) of ventilation building S1.
No stains were observed in the vicinity of the transformers. The concrete paved floors and the concrete slabs were in good condition. |
Photo 2783 in 60604728/CAPb/PR4 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
Roads |
Lower of Industrial or Public Park |
|
Chemical Waste Storage Area (5 m2)
|
A chemical waste storage area for the storage of spent diesel oil after filling the generators (S1 and S1-2) was observed at the south of Ventilation Building S1. 4 spent diesel oil drums were observed on raised concrete platform within the area. No stains were observed in the chemical waste storage area. The raised concrete platform was in good condition. |
Photo 4430 in 60604728/CAPb/PR4 |
N/A |
Metals, PCRs, VOCs and SVOCs |
Roads |
Lower of Industrial or Public Park |
|
S1-2 Building |
Generator |
A generator with a 480 L diesel fuel tank was observed on thick concrete slab in the emergency generator room of S1-2 building located in the south of the Sha Tin Portal of LRT.
No stains were observed in the vicinity of the generator. The concrete paved floors and the concrete slabs were in good condition. |
Photo 9827 in 60604728/CAPb/PR4 |
N/A |
Metals, PCRs, VOCs and SVOCs |
Roads |
Lower of Industrial or Public Park |
Transformer S1-2 |
A transformer was observed on thick concrete slab in the transformer room of S1-2 building.
No stains were observed in the vicinity of the transformers. The concrete paved floors and the concrete slabs were in good condition. |
Photo 2752 in 60604728/CAPb/PR4 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
Roads |
Lower of Industrial or Public Park |
|
Ventilation Building S2* |
Transformer S2 (5 m2)
|
A transformer was observed on concrete paved ground in the transformer room (substation B) of ventilation building S2. The ventilation building S2 is located in the southwest of the Sha Tin Portal.
No stains were observed in the vicinity of the transformer. All the concrete paved floors and concrete slabs were in good condition.
|
Photo 4481 in 60604728/CAPb/PR5 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
To be confirmed*
|
To be confirmed*
|
Chemical Waste Storage Area (2 m2)
|
A chemical waste storage area was observed in the south of the ventilation building S2. The chemical waste storage area was a vacant room and was reported to store spent diesel drums after filling the generator S2-2.
No stains were observed in the chemical waste storage area. All the concrete paved floors and concrete slabs were in good condition. |
Photo 2936 in 60604728/CAPb/PR5 |
N/A |
Metals, PCRs, VOCs and SVOCs |
To be confirmed*
|
To be confirmed*
|
|
S2-2 Building* |
Generator
|
A generator with a 300 L diesel fuel tank was observed on a thick concrete slab in the S2-2 building located in the southwest of the Sha Tin Portal of LRT.
No stains were observed inside the generator room. All the concrete paved floors and concrete slabs were in good condition. |
Photo 2917 in 60604728/CAPb/PR5 |
N/A |
Metals, PCRs, VOCs and SVOCs |
To be confirmed*
|
To be confirmed*
|
Transformer S2-2 (5 m2)
|
A transformer was installed on thick concrete slabs in the transformer room of the S2-2 building.
No stains were observed in the vicinity of the transformer. All the concrete paved floors and concrete slabs were in good condition.
|
Photo 9908 in 60604728/CAPb/PR5 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
To be confirmed*
|
To be confirmed*
|
|
Chemical Waste Storage Area (2 m2)
|
A chemical waste storage area was observed in the vicinity of generator S2-2 in the S2-2 building. A total of 3 spent diesel oil drums after filling the nearby generator S2-2 were observed on concrete paved ground with no stains observed.
No stains were observed in the chemical waste storage area. All the concrete paved floors and concrete slabs were in good condition.
|
Photo 4477 in 60604728/CAPb/PR5 |
N/A |
Metals, PCRs, VOCs and SVOCs |
To be confirmed*
|
To be confirmed*
|
|
Kowloon Portal |
|||||||
Ventilation Building K1* |
2 Transformers (K1 and K1-2) (5 m2 each)
|
The Ventilation Building K1 is located in the north of the Kowloon Portal of LRT.
Two transformers (K1 and K1-2) were observed on concrete paved floor in the transformer rooms (substation C and substation K1-2) within the Ventilation Building K1.
No stains were observed inside the building and the concrete paved floor was in good condition.
|
Photo 2881, 4462 & 9882 in 60604728/CAPb/PR6 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
To be confirmed* |
To be confirmed* |
Ventilation Building K2 |
2 Generators (Mobile Genset 1 and 2) (10 m2 each)
|
The Ventilation Building K2 located in the northeast of the Kowloon Portal of LRT.
Two mobile diesel generators (Mobile Genset 1 and 2) were observed in the northwest and adjacent to the southeast of Ventilation Building K2 respectively.
The generators were observed on raised concrete plinth / concrete paved ground. No stains were observed in the vicinity of the generators. All the concrete paved floors were in good condition.
|
Photo 2835 & 9854 in 60604728/CAPb/PR6 |
N/A |
Metals, PCRs, VOCs and SVOCs |
Roads |
Lower of Industrial or Public Park |
Transformer K2 (5 m2)
|
A transformer was installed on concrete paved floor in the transformer room (substation A) of Ventilation Building K2.
No stains were observed in the vicinity of the transformer. All the concrete paved floors and the concrete slabs were in good condition.
|
Photo 9867 in 60604728/CAPb/PR6 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs
|
Roads |
Lower of Industrial or Public Park |
|
Chemical Waste Storage Area
|
A chemical waste storage area was observed in the north of the ventilation building K2, which was a vacant concrete paved room. According to the site representative, the area reportedly store any spent diesel oil drums after filling the 2 mobile gensets.
No stains were observed in the chemical waste storage area. All the concrete paved floors were in good condition.
|
Photo 9872 in 60604728/CAPb/PR6 |
N/A |
Metals, PCRs, VOCs and SVOCs |
Roads |
Lower of Industrial or Public Park |
|
K2-2 Building |
Transformer K2-2 |
A transformer was installed on a thick concrete slab in the transformer room of K2-2 building located in the south of Kowloon Portal.
No stains were observed in the vicinity of the transformer. All the concrete paved floors and the concrete slabs were in good condition.
|
Photo 9857 in 60604728/CAPb/PR6 |
N/A |
Metals, VOCs, SVOCs, PCRs and PCBs |
Roads |
Lower of Industrial or Public Park |
Note:
* The proposed land use of the concerned areas will be determined at a later stage of the Project. If the proposed land use could not be confirmed at the time of site re-appraisal and supplementary CAP(s) (refer to Section 7.8), the most stringent set of RBRGs should be adopted for the concerned area(s).
Future Land Uses
· Urban residential;
· Rural residential;
· Industrial; and
· Public park.
Table 7.3 Sampling and Testing Plan
Concerned Facility / Area |
Hotspot (approx. area) |
Sampling Location ID(1) |
Grid Size (m) |
Sampling and Testing Rationale |
Sampling Method |
Sample Matrix/ Depth(2) |
Parameters to be Tested(3) |
|||||
PCRs |
VOCs |
SVOCs |
Metals |
PCBs |
||||||||
Sha Tin Portal |
||||||||||||
Vehicle Maintenance Workshop in Administration Building (130 m2) |
- |
ENV-BH01 to ENV-BH03 |
7 |
Sampling to target the vehicle maintenance workshop in Administration Building (130 m2). A grid sampling approach based on the Practice Guide and specified grid size was adopted for the sampling strategy. |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Chemical Storage Area (approx. 5 m2) |
ENV-BH04 |
- |
Target potential hotspot area at chemical storage area (approx. 5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Chemical Waste Storage
Area |
ENV-BH05 |
- |
Target potential hotspot area at chemical waste storage area (approx. 6 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Air Compressor |
ENV-BH06 |
- |
Target potential hotspot area at air compressor (approx. 6 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Long Vehicle
Maintenance and Parking Area |
- |
ENV-BH07 to ENV-BH12 |
13 |
Sampling to target the long vehicle maintenance and parking area (810 m2). A grid sampling approach based on the Practice Guide and specified grid size was adopted for the sampling strategy. |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Chemical Storage Area |
ENV-BH13 |
- |
Target potential hotspot area at chemical storage area (approx. 3 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Workshop at E&M Building (100 m2) |
-
|
ENV-BH14 to ENV-BH16 |
6 |
Sampling
to target the workshop |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
E&M Building |
Chemical Store Room (10 m2) |
ENV-BH17 |
- |
Target potential hotspot area at chemical store room (10 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Generator |
ENV-BH18 |
- |
Target potential hotspot area at generator (1 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Ventilation Building S1 |
Generator S1 (15 m2) |
ENV-BH19 |
- |
Target potential hotspot area at generator S1 (15 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Transformer S1 (5 m2) |
ENV-BH20
|
- |
Target potential hotspot area at transformer S1 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Chemical Waste Storage Area (5 m2) |
ENV-BH21 |
- |
Target potential hotspot area at chemical waste storage area (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
S1-2 Building |
Generator S1-2 |
ENV-BH22 |
- |
Target potential hotspot area at generator S1-2 (15 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Transformer S1-2 |
ENV-BH23 |
- |
Target potential hotspot area at transformer S1-2 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Ventilation Building S2 |
Transformer S2 |
ENV-BH24 |
- |
Target potential hotspot area at transformer S2 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Chemical Waste Storage
Area |
ENV-BH25 |
- |
Target potential hotspot area at chemical waste storage area (2 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
S2-2 Building |
Generator S2-2 (15 m2) |
ENV-BH26 |
- |
Target potential hotspot area at generator S2-2 (15 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Transformer S2-2 (5 m2) |
ENV-BH27 |
- |
Target potential hotspot area at transformer S2-2 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Chemical Waste Storage Area (2 m2) |
ENV-BH28 |
- |
Target potential hotspot area at chemical waste storage area (2 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Kowloon Portal |
||||||||||||
Ventilation Building K1 |
Transformers |
ENV-BH29 |
- |
Target potential hotspot areas at transformers K1 and K1-2 (5 m2 each) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Ventilation Building K2 |
Generators (Mobile
Gensets |
ENV-BH31 |
- |
Target potential hotspot areas at mobile gensets 1 and 2 (10 m2 each) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
Transformer K2 (5 m2) |
ENV-BH33 |
- |
Target potential hotspot area at transformer K2 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
||||||
Chemical Waste Storage
Area |
ENV-BH34 |
- |
Target potential hotspot area at chemical waste storage area (2 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
- |
|
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
- |
||||||
K2-2 Building |
Transformer K2-2 (5 m2) |
ENV-BH35 |
- |
Target potential hotspot area at transformer K2-2 (5 m2) |
Borehole drilling to 2m below the groundwater table or 6m bgl |
Soil |
(i) 0.5m bgl (ii) 1.5m bgl (iii) 3.0m bgl (iv) at GW level or 6m bgl(4) |
ü |
ü |
ü |
ü |
ü |
GW |
If present(4) |
ü |
ü |
ü |
Mercury only |
ü |
(1) Refer to 60604728/R42b/Figure 7.2 and 7.3 for concerned facility / area and proposed sampling locations.
(2) bgl = below ground level; GW = groundwater
(3) The testing parameters refer to the parameters as shown in Table 2.1 – RBRGs for Soil & Soil Saturation Limit and Table 2.2 – RBRGs for Groundwater and Solubility Limit under VOCs, SVOCs, Metals, PCBs and PCRs in the Guidance Manual.
Since RBRG value of benzo(a)anthracene, benzo(a)pyrene, benzo(g,h,i)perylene, benzo(k)fluoranthene, bis-(2-Ethylhexyl)phthalate, dibenzo(a,h)anthracene, indeno(1,2,3-cd)pyrene and phenol were not available for groundwater, the said parameters would not be tested in groundwater samples.
(4) The deepest depth of sampling should be at groundwater table or 6m bgl, whichever is shallower. Groundwater sample would only be collected if encountered.
Recommended Further Works
Table 7.4 Tentative Programme for Land Contamination Assessment
Task |
Tentative Timeframe |
Site re-appraisal, preparation and submission of supplementary CAP |
Q1 of 2026 |
Approval of supplementary CAP |
Q1 of 2026 |
SI works, laboratory tests, preparation and submission of CAR/RAP |
Q2 of 2026 |
Approval of CAR/RAP |
Q2 of 2026 |
Remediation works, preparation and submission of RR |
Subject to results of the SI works |
Mitigation Measures for Remediation Works
· Excavation profiles must be properly designed and executed with attention to the relevant requirements for environment, health and safety;
· Excavation shall be carried out during dry season as far as possible to minimise contaminated runoff from contaminated soils;
· Supply of suitable clean backfill material (or treated soil) after excavation;
· Stockpiling site(s) shall be lined with impermeable sheeting and bunded. Stockpiles shall be fully covered by impermeable sheeting to reduce dust emission. If this is not practicable due to frequent usage, regular watering shall be applied. However, watering shall be avoided on stockpiles of contaminated soil to minimise contaminated runoff.
· Vehicles containing any excavated materials shall be suitably covered to limit potential dust emissions or contaminated wastewater run-off, and truck bodies and tailgates shall be sealed to prevent any discharge during transport or during wet conditions;
· Speed control for the trucks carrying contaminated materials shall be enforced;
· Vehicle wheel and body washing facilities at the site’s exist points shall be established and used; and
· Pollution control measures for air emissions (e.g. from biopile blower and handling of cement), noise emissions (e.g. from blower or earthmoving equipment), and water discharges (e.g. runoff control from treatment facility) shall be implemented and complied with relevant regulations and guidelines.