Upgrading of Tai Po Sewage Treatment Works
Environmental Impact Assessment Report
Volume 3 ¡V Appendix
Appendix 2.1 Existing
Layout of Project Site
Appendix 2.2 Responses
to Public Comments
Appendix 3.1 Calculation
of Dust Emission Rate
Appendix 3.2 Calculation
of Industrial Emission Rate
Appendix 3.3 Details
of Surface Characteristics
Appendix 3.4 Traffic
Forecast
Appendix 3.5 Weather
Information from the Hong Kong Observatory (HKO)
Appendix 3.6 Calculation
of Vehicular Emission
Appendix 3.7 Odour
Survey for Tai Po Sewage Treatment Works
Appendix 3.8 Calculation
of Odour Emission Rate
Appendix 3.9 Detailed
Air Quality Assessment Results
Appendix 4.1 Correspondences
from Intake Operators
Appendix 4.2A THMB
Model Grid Layout and Coverage
Appendix 4.2B VH
Model Grid Layout and Coverage
Appendix 4.3
Contour
Plots of Water Quality Modelling Results for Victoria Harbour
Appendix 4.4 Contour
Plots of Water Quality Modelling Results for Tolo
Harbour and Tolo Channel
Appendix 4.5 Water
Quality Modelling Results for Water Sensitive Receivers in Tolo
Harbour and Tolo Channel
Appendix 4.6 Time
Series Plots of Water Quality Modelling Results for THEES Maintenance
Discharge
Appendix 4.7 Comparison
of Historical Red Tide and Chlorophyll-a Data Before, During and After Past
THEES Maintenance Discharge
Appendix 4.8 Time
Series Plots of Water Quality Modelling Results for Emergency Discharge
Appendix 4.9 DSD¡¦s
Existing Contingency Plan for Incidents Possibly Encountered in Sewage
Treatment Facilities
Appendix 5.1 List
of Flora recorded within Project Site and 500m Assessment Area
Appendix 5.2 List
of Fauna recorded within Project Site and 500m Assessment Area
Appendix 5.3 Number
of Target Avifauna Species recorded during the Roosting Surveys
Appendix 5.4 Representative
Photographs of Habitats within Project Site and 500m Assessment Area
Appendix 5.5 Representative
Photographs of Species of Conservation Concern
Appendix 5.6 Benthic
Survey Report
Appendix 5.7 Coral
Survey Report
Appendix 7.1 Broad
Brush Tree Survey
Appendix 8.1 Population
Data
Appendix 8.2 Calculation
of Transient Population
Appendix 8.3 Preliminary Layout of Proposed
Biogas Facilities and Tentative Locations of Chemical Storage
Appendix 8.4 Existing
Biogas Facilities and Tentative Construction Plan
Appendix 8.5 External
Hazards Review
Appendix 8.6 PHAST
RISK Parameters
Appendix 8.7 Review
of Historical Accident
Appendix 8.8 Consequence
Data
Appendix 8.9 Failure
Frequency for Scenarios Associated with Naphtha Storage Tanks
Appendix 8.10 Projectile
Risk Assessment
Appendix 8.11 Detailed
FTA
Appendix 8.12 Top Risk
Contributors
Appendix 9.1 Geology
Map for Project Site
Appendix 9.2 Locations
of LFG Monitoring
Appendix 9.3 LFG
Monitoring Data for Shuen Wan Restored Landfill
Appendix 9.4 Facilities
Surrounding the Project Site
Appendix 10.1 Sediment
Sampling and Testing Methodology Paper
Appendix 10.2 As-built
Sediment Sampling Locations
Appendix 10.3 Summary
of Chemical and Biological Screening Results
Appendix 11.1 Contamination
Assessment Plan
Appendix 15.1 Key
Assessment Assumptions and Limitations of Methodologies
Appendix 15.2 Summary
of Environmental Impacts