Agreement No. CE 54/2020 (DS)

Drainage Improvement Works in Mui Wo ¡V Investigation

 

Volume II ¡V Figures

 

CONTENTS

 

Figure 1.1           Location of Project Site and Its Environs

Figure 2.1           Proposed Drainage Improvement Works under the DMP Review Study

Figure 2.2           Design Option 1 - Stormwater Pumping Scheme at Nam Bin Wai

Figure 2.3           Design Option 2 - Stormwater Pumping Scheme at River Silver

Figure 2.4           Design Option 3 - Stormwater Pumping Scheme at Luk Tei Tong River

Figure 2.5           Project Interfacing Plan

Figure 3.1           Air Sensitive Receivers (ASRs) within Assessment Area

Figure 4.1           Representative Noise Sensitive Receivers (NSRs) within Assessment Area

Figure 5.1           Surrounding Water Environment, Water Sensitive Receivers and EPD River / Marine Water Quality Monitoring Stations

Figure 7.1           Areas of Conservation Importance within and near the Assessment Area

Figure 7.2           Habitat Map and Species of Conservation Concern within Works Area

Figure 7.2a         Habitat Map and Species of Conservation Concern within Works Area (Zoom-in)

Figure 8.1           500 m Assessment Area, Visual Envelope and Locations of Visually Sensitive Receiver (VSR) and Vantage Point (VP)

Figure 8.2           Outline Zoning Plan (OZP)

Figure 8.3           Landscape Character Area (LCA)

Figure 8.4           Landscape Resources (LR)

Figure 8.5           Photographic Record of Landscape Character Area

Figure 8.6a-b      Photographic Record of Landscape Resources

Figure 8.7a-g      Photographic Record of Visually Sensitive Receivers

Figure 8.9a-b      Photomontage from VP1 - View from Footbridge near Ngan Shu Street

Figure 8.10a-b   Photomontage from VP2 - View from Luk Tei Tong Bypass Channel

Figure 8.11a-b   Landscape and Visual Mitigation Plan (Construction Stage), (Operation Stage)

Figure 8.12a-e    Illustration for Green Roof and Landscape Works of Stormwater pumping station Mitigation Measures

Figure 8.13a-b   Sections of River Revitalization and Gabion Wall with Mitigation Measures

Figure 8.14a-c    Landscape Character Impacts During Construction, at Day 1 of Operation and Year 10 of Operation

Figure 8.15a-c    Landscape Resources Impacts During Construction, at Day 1 of Operation and Year 10 of Operation

Figure 9.1           CHIA Assessment Area (Built Heritage Survey Area)

Figure 9.2           Geology

Figure 9.3           Previous Archaeological Investigation