TABLE OF CONTENTS

 

7          Sewerage and sewage treatment implications. 7-1

7.1          Introduction. 7-1

7.2          Environmental Legislation, Standards, and Guidelines. 7-1

7.3          Existing and Planned Conditions. 7-2

7.4          Assessment Methodology. 7-4

7.5          Sewage Flow Estimation. 7-6

7.6          Proposed Sewerage Connections. 7-9

7.7          Proposed Sewerage Arrangement at Specific Locations. 7-10

7.8          Demarcation of Maintenance Responsibilities. 7-12

7.9          Potential Sewerage Impacts and Proposed Mitigation Measures. 7-12

7.10        Conclusion. 7-13

 

 

List of tables

Table 7.1   Population Factor and Unit Flow Factor for Non-Station Lobby Areas. 7-5

Table 7.2   Peaking Factors. 7-5

Table 7.3   Discharge Units for Sanitary Fitments. 7-6

Table 7.4   Frequency of Use ĄŽK FactorĄ¯ 7-6

Table 7.5   Method (i) - Summary of Adopted Sewage Peak Flow.. 7-7

Table 7.6   Method (ii) ¨C Summary of Adopted Sewage Peak Flow.. 7-7

Table 7.7   Planned Project and Development Time Frame. 7-8

Table 7.8   Proposed Sewerage Connection and Treatment Locations. 7-9

Table 7.9   Proposed Demarcation of Maintenance Responsibilities. 7-12

 

 

LIST OF FIGURES

C1603/C/NOL/ACM/M54/301  to C1603/C/NOL/ACM/M54/311

Existing and Proposed Sewerage Layout Plan

 

 

LIST OF APPENDICES

Appendix 7.1

Sewage Peak Flow Estimations - Method (i)

Appendix 7.2

Sewage Peak Flow Estimations - Method (ii)

 



7                  Sewerage and sewage treatment implications

7.1              Introduction

7.1.1         This section presents an assessment of the potential sewerage and sewage treatment implications associated with the operation of the Project.  For the construction phase, as the sewage generated by the workforce can be treated by temporary sewage treatment facilities (i.e. chemical toilets) provided at construction sites of the railway line, stations, depot, Emergency Access Point (EAP) / Emergency Egress Point (EEP) / Ventilation Building (VB), and the temporary magazine site, no sewerage and sewage treatment implications are identified, and are therefore not discussed in this section (refer to Section 6 for details).  As for the operational phase, the potential sewerage and sewage implications were identified, and recommendations for mitigation measures are provided to minimise the identified sewerage and sewage treatment implications.

7.2              Environmental Legislation, Standards, and Guidelines

7.2.1         The relevant legislations, standards, and guidelines applicable to this Study for the assessment of sewerage and sewage implications include:

Ą¤         Environmental Impact Assessment Ordinance (EIAO) (Cap. 499);

Ą¤         Water Pollution Control Ordinance (Cap. 358);

Ą¤         Sewerage Manual Part 1 and Part 2, published by Drainage Services Department (DSD); and

Ą¤         Guidelines for Estimating Sewage Flows for Sewage Infrastructure Planning (Version 1.0) (Report No.: EPD/TP 1/05),  published by Environmental Protection Department (EPD).

7.2.2         The EIAO (Cap. 499) provides the major statutory framework for the environmental impact assessment in Hong Kong.  Under Section 16 of the EIAO, Environmental Protection Department (EPD) issued the Technical Memorandum on Environmental Impact Assessment Process (EIAO-TM) which specifies the assessment methods and criteria for the EIA.  The sewerage and sewage treatment implications are assessed according to Annexes 6 and 14 of the EIAO-TM, which stipulates the Ą°Criteria for Evaluating Water PollutionĄą and Ą°Guidelines for Assessment of Water PollutionĄą respectively.

7.2.3         WPCO (Cap. 358) provides the major statutory framework for the protection and control of water quality in Hong Kong.  According to the Ordinance and its subsidiary legislation, the entire Hong Kong waters are divided into ten Water Control Zones (WCZs) and four supplementary WCZs.  Each WCZ has a designated set of statutory Water Quality Objectives (WQOs).  The WQOs set limits for different parameters that should be achieved to protect specific beneficial uses and conservation goals of each of the zones.  The ProjectĄ¯s assessment area falls under the Deep Bay WCZ.

7.2.4         DSDĄ¯s Sewerage Manual provides guidelines on the planning, design, construction, operation, and maintenance of the public sewerage systems in Hong Kong.  The manual is divided into two parts.  Part 1 of the manual provides guidelines regarding public gravity sewerage systems in Hong Kong, whereas Part 2 of the manual provides guidelines regarding sewage pumping stations and rising mains.

7.2.5         EPDĄ¯s Guidelines for Estimating Sewage Flows (GESF) provides guidance on good practices for estimating sewage flows for planning catchment level and sub-catchment level sewage infrastructure.  The application of the GESF to planning sub-catchment local sewage infrastructure would involve deliberation of the worst-case scenarios of usages and populations of the existing and proposed developments.

7.3              Existing and Planned Conditions

General

7.3.1         The vicinity of the works sites is mostly unsewered rural land, except for areas in Kam Tin.  Existing sewerage systems are only identified near Kam Sheung Road and Au Tau.  These existing sewerage systems are conveying sewage via Kam Tin Sewage Pumping Station (SPS) and Sha Po SPS to the existing Yuen Long Sewage Treatment Works (YL STW).  The Existing YL STW is currently being upgraded to the Yuen Long Effluent Polishing Plant (YL EPP).

7.3.2         Planned sewerage systems in Kam Tin South, Sha Po, Ngau Tam Mei, San Tin and Kwu Tung North are also identified.

7.3.3         Existing sewerage key plans and layout plans for Northern Link (NOL) are shown in Figure Nos. C1603/C/NOL/ACM/M54/301 to 311.

KSR(NOL) Station

7.3.4         An existing sewerage system was identified along the southern and western sides of KSR(TML) Station, with pipelines ranging from 225mm to 450mm in diameter.  An existing Sewage Holding Tank No. 2 located underground was also identified, which is planned to be demolished. Sewage will be diverted to the planned public sewerage systems.

7.3.5         Planned sewerage system was identified for Kam Tin South Housing Development.

Kam Sheung Road (KSR) to Au Tau (AUT) Stations

7.3.6         A section of existing private 600mm diameter sewerage pipe along Shui Mei Road, at the south of Park Yoho Phase 1 near Shui Mei Road Ancillary Building was identified above the bored tunnels.

Au Tau (AUT) Station

7.3.7         The existing Sha Po SPS and associated sewerage system were identified at the south-west corner of AUT Station.

7.3.8         Planned sewerage system was identified for Sha Po Public Housing Development.

Au Tau (AUT) to Ngau Tam Mei (NTM) Stations

7.3.9         No existing nor planned public sewerage systems in the vicinity were identified in this area.

Ngau Tam Mei (NTM) Station and Ngau Tam Mei Depot (NTD)

7.3.10       The existing Ngau Tam Mei area is an unsewered land.  No existing public sewerage system in the vicinity was identified in this area.

7.3.11       CEDD commissioned a land use review feasibility study of Ngau Tam Mei Area Land Use Review (NTM LUR) in November 2021, both NTM Station and NTD are within the study area of NTM LUR.  The planned sewerage system will be developed under the NTM LUR project and further liaison with CEDD regarding the sewerage connection will be conducted.

Ngau Tam Mei (NTM) to San Tin (SAT) Stations

7.3.12       There were 2 nos. of private sewage treatment plants near the Vineyards and the Tam Mei Barrack identified in this area.

San Tin (SAT) Station

7.3.13       The existing San Tin area is an unsewered land.  No existing public sewerage system in the vicinity was identified in this area.

7.3.14       CEDD commissioned an investigation study on the Development of the San Tin / Lok Ma Chau Development Node (STLMC DN) in October 2021, a planned sewerage system would be proposed for STLMC DN.  Further liaison is required for the planned drainage and sewerage network in the vicinity of SAT Station.

San Tin (SAT) to Kwu Tung (KTU) Stations

7.3.15       Existing SAT to KTU areas are unsewered land.  No existing public sewerage system in the vicinity was identified in this area.

Kwu Tung (KTU) Station

7.3.16       The existing Kwu Tung area is an unsewered land, and foul water from the existing EAPs of Lok Ma Chau Spur Line (LMCSL) are discharged to soak away pits with a petrol interceptor at the immediate upstream.

7.3.17       KTU Station is located within the KTN NDA boundary under Agreement No. 13/2014 (CE) Development of Kwu Tung North and Fanling North New Development Areas, Phase 1 ¨C Design and Construction (KTN NDA Advanced Phase) and Agreement No. CE 19/2019 (CE) Development of Kwu Tung North New Development Area, Remaining Phase ¨C Design and Construction (KTN NDA Remaining Phase), of which the construction would be completed by 2025/2026 and 2031 tentatively.

7.3.18       By the time of KTU(EAL) StationĄ¯s opening, infrastructure works under KTN NDA Advanced Phase would be completed.  However, these sewerage provisions do not cover the whole site for KTU Station and terminate at the west of the station.  In addition, the invert level of the nearest sewage manhole is above the site formation level of KTU Station, hence interim sewage networks are proposed at KTU Station.

Existing and Planned Sewage Treatment Works and Sewage Pumping Stations

7.3.19       According to the information provided by DSD, the existing and planned STW and SPS closest to the Project include:

Ą¤         Shek Wu Hui STW (SWH STW);

Ą¤         Yuen Long STW (YL STW);

Ą¤         Kam Tin SPS;

Ą¤         Sha Po SPS;

Ą¤         Nam Sang Wai SPS; and

Ą¤         Proposed Kwu Tung North SPS.

7.3.20       The existing SWH STW is a secondary treatment works which collects and treats the sewage generated from Fanling/Sheung Shui and other areas before discharging into Deep Bay through Ng Tung River and Shenzhen River, and the average daily flow in 2022 at SWH STW is approximately 93,840m³/day.  The capacity of the existing SWH STW is 105,000m³/day and the designed capacity will be 190,000 m³/day being upgraded to the Shek Wu Hui Effluent Polishing Plant (SWH EPP), with the completion date planned to be Year 2034.

7.3.21       The existing YL STW is a secondary treatment works with a designed capacity of 35,000m³/day, collecting sewage from Yuen Long. The averaged daily flow in 2022 is approximately 26,750m3/day.  According to EIA for Yuen Long Effluent Polishing Plant (Register No.: AEIAR-220/2019), YL STW will be upgraded to the Yuen Long Effluent Polishing Plant (YL EPP), and it will be constructed in two phases.  Phase 1 works will upgrade the existing YL STW into YL EPP with a treatment capacity of 100,000 m³/day in Average Dry Weather Flow (ADWF).  As advised by EPD, Phase 2 works will be implemented subject to further review of sewage flow projections and will further upgrade the treatment capacity to 150,000 m3/day. 

7.3.22       The existing Kam Tin SPS is a sewage pumping station with a designed capacity of 17,133m³/day, collecting sewage from Kam Tin area and directing it to the YL STW for treatment.  The averaged daily flow in 2022 is approximately 2,480m³/day, and the planned Kam Tin South Development will generate an approximated ADWF of 13,000m³/day, which is within the designed capacity.

7.3.23       The existing Sha Po SPS is a sewage pumping station with a designed capacity of 8,795m³/day, it directs sewage to the YL STW for treatment, the averaged daily flow in 2022 is approximately 1,370m³/day.  The planned Sha Po Public Housing Development will generate an approximated ADWF of 13,200m³/day.  The SPS is planned to be upgraded to a capacity of 16,750m³/day for the Sha Po Public Housing Development.

7.3.24       The existing Nam Sang Wai SPS is a sewage pumping station with a designed capacity of 42,921m³/day, and directs sewage to the YL STW for treatment.  It is currently serving as an intermediate pumping station between Kam Tin SPS and YL STW; and Sha Po SPS and YL STW.  The averaged daily flow in 2022 is approximately 3,970m³/day.

7.3.25       The Proposed Kwu Tung North SPS will be constructed under KTN NDA, which has a planned ADWF of 56,215m³/day.

7.4              Assessment Methodology

General

7.4.1         The major wastewater sources generated by the Project include the sewerage from the staff, commercial activities and passengers, and Ancillary Building Wastewater as listed below:

Ą¤         Rainfall blown into railway louvre openings;

Ą¤         Groundwater seepage;

Ą¤         Discharge from tests on the fire system;

Ą¤         Leakage from services; and

Ą¤         Condensation from E&M equipment.

Sewage from Commercial Activities, Staff, and Passengers

 

7.4.2         The assessment was out in accordance with the guidelines set out in Report No.: EPD/TP 1/05 Guidelines for Estimating Sewage Flows for Sewage Infrastructure Planning Version 1.0 and the Sewerage Manual published by DSD.

7.4.3         The methodology for flow estimation is based on the following steps:

Ą¤         Identify the scope of the Project;

Ą¤         Determine the sewage generation from the Project;

Ą¤         Identify the existing and planned sewerage systems within and in the vicinity of the proposed Project boundary;

Ą¤         Examine the impact arising from new sewage generation from the Project on the existing sewage conveyance, pumping stations and treatment systems; and

Ą¤         Identify new and upgrading sewerage works.

Unit Flow Factors - Commercial Flows

7.4.4         Commercial flows comprise flows from the employee and commercial activities which contains 11 job categories as classified in GESF.  The unit flow factors of commercial flows are shown in Table 7.1.

Table 7.1   Population Factor and Unit Flow Factor for Non-Station Lobby Areas

Floor Uses

Population Factor

Category

Unit Flow Factor(1)

(m3/head/day)

Non-public E&M Rooms

35(2)

m2/worker

J2 Electricity, Gas & Water

0.33

Concession (Retail Area)

25(2)

m2/worker

J4 Wholesale & Retail

0.28

Concession (Food & Beverage)

5.1(3)

Worker/100m2

J10 Restaurants & Hotels

1.58

Non-public Operation Room

25(2)

m2/worker

Territorial Average

0.28

Notes:

(1)   Table T2 of Guidelines for Estimating Sewage Flows for Sewage Infrastructure Planning Version 1.0 (Report No. EPD/TP 1/05) refers.

(2)   Table 2 of Chapter 5 of the Hong Kong Planning Standards and Guidelines published by the Planning Department.

(3)   Figure 9 of Commercial and Industrial Floor Space Utilization Survey published by the Planning Department.

Peaking Factors

7.4.5         The Peaking Factor (P) was used to determine peak flows which are flows resulting from a combination of factors including diurnal and seasonal flow variations of flow components and characteristic response of inflow and base flows to storm events.  Peak flows could be determined from peaking factors and adequate safety margins could be provided during the planning of sewerage facilities.  The Peaking Factors adopted for this assessment are listed under Table 7.2 below.

Table 7.2    Peaking Factors

Population Range

Peaking Factor (including stormwater allowance) for facility with existing upstream sewerage

Peaking Factor (excluding stormwater allowance) for facility with new upstream sewerage

a)     For sewers

<1,000

8

6

1,000 - 5,000

6

5

5,000 - 10,000

5

4

10,000 - 50,000

4

3

> 50,000

Max (7.3/N0.15, 2.4) (1)

Max (6/N0.175, 1.6) (1)

b)    Sewage Treatment Works, Preliminary Treatment Works and Pumping Station

<10,000

4

3

10,000 - 25,000

3.5

2.5

25,000 - 50,000

3

2

> 50,000

Max (3.9/N0.065, 2.4) (1)

Max (2.6/N0.065, 1.6) (1)

Note:

(1) N is the contributing population in thousands, where contributing population is the calculated total average flow / 0.27 m3/person/day.

Catchment Inflow Factors

7.4.6         Catchment Inflow Factors (PCIF) such as infiltration of water or sewage are not considered relevant in the estimation of planned sewerage flows.  PCIF was therefore not considered to be applicable to new sewerage systems, and a factor of 1 was applied.  According to Table T-4 in GESF, a PCIF of 1 was adopted. 

Discharge Unit Method

7.4.7         Sewage from public toilets within the stations are estimated based on the Ą°Discharge Unit (DU) MethodĄą with reference to the Chartered Institute of Plumbing and Heating Engineering (CIPHE)Ą¯s Plumbing Engineering Services Design Guide. The adopted DU are in Table 7.3 while K refers to Frequency of Use Ą°K FactorĄą as listed in Table 7.4.

Table 7.3   Discharge Units for Sanitary Fitments

Appliances

Discharge Units (L/s)

Wash Basin

0.3

Urinals with Basin

0.4

Washing Closet with 6L Cistern

1.5

Shower

0.5

Cleaner's Sink

0.3

Cleansing Point

0.5


Table
7.4   Frequency of Use ĄŽK FactorĄ¯

Usage of Appliance

Frequency of Use ĄŽK FactorĄ¯

Intermittent Use (e.g. dwelling, guesthouse, office etc.)

0.5

Frequent Use (e.g. hotel, restaurant, school, hospital etc.)

0.7

Congested Use (e.g. toilets and/or showers open to the public etc.)

1.0

Special use (e.g. laboratories etc.)

1.2

7.4.8         The Ą°K factorĄą of 1.0 is deemed most appropriate for the proposed rail stations and was therefore adopted for sewage flow estimations.

7.5              Sewage Flow Estimation

7.5.1         The sewerage impacts from the operation of NOL to the hinterland is assessed by the methodology mentioned above.  Two methods were used, which calculates (i) sewage peak flow rate and (ii) sewage daily flow rate.

7.5.2         Method (i) estimates the peak flow rate discharged into terminal manholes/sewerage holding tanks, which is the sum of the full load of sump pump flow rate, plus discharge flow from internal gravity sewerage system, if applicable. Therefore, Method (i) is considering the peak flows under an extreme case.

7.5.3         Method (ii) estimates the sewage flow rate through a summation of the population based daily sewage discharge calculated by EPDĄ¯s GESF method and daily sanitary fitment discharge calculated by CIPHEĄ¯s ĄŽDischarge Unit MethodĄ¯. Therefore, Method (ii) is considering the case under normal operation.

Sewage Flow Estimation for Depot, Stations, Ancillary Buildings

7.5.4         For Method (i), the detailed breakdown of peak sewage peak flows by adopting pump flow rate and maximum sanitary fitment discharge are shown in Appendix 7.1.  For Method (ii), the daily sewage flow and peak flow calculations adopting sewage discharge rate according to EPDĄ¯s GESF and CIPHEĄ¯s ĄŽDischarge Unit MethodĄ¯ are shown in Appendix 7.2.

7.5.5         The adopted sewage peak flow estimated for depot, stations and ancillary buildings using Method (i) are summarised in Table 7.5 below.

Table 7.5   Method (i) - Summary of Adopted Sewage Peak Flow

Location

Adopted Peak Flow (L/s)

KSR(NOL) Station(1)

187.0

AUT Station(1)

176.5

NTM Station(1)

88.0

NTD(1)

261.6

SAT Station(1)

186.0

KTU(NOL) Station(1)

24.0

Shui Mei Road Ancillary Building (SMA)

24.0

Pok Wai Ancillary Building (PWA)

24.0

Long Ha Tsuen Ancillary Building (LHA)

24.0

San Tin Ancillary Building (SNA)

60.0

Ka Lung Road Ancillary Building (KLA)

24.0

Kwu Tung Road Ancillary Building (KTA)

24.0

Pak Shek Au Ancillary Building (PAA)

24.0

Note:

(1)   Tunnel sewage has been included in the station flow.

7.5.6         For Method (ii), the daily sewage flow was estimated through the summation of EPDĄ¯s GESF method and CIPHEĄ¯s ĄŽDischarge Unit MethodĄ¯. A peaking factor for sewers of 6 was adopted to estimate the sewage peak flow of Method (ii) for EPDĄ¯s GESF method. The summary of the extracted and adopted sewage peak flows and ADWF of the mentioned locations are presented in Table 7.6.  The values are presented for comparison only, and will not be adopted in the sewerage network design.

Table 7.6   Method (ii) ¨C Summary of Adopted Sewage Peak Flow

Location

Adopted Peak Flow (L/s)

ADWF

(m3/day)

KSR(NOL) Station

57.4

256.9

AUT Station

47.2

204.0

NTM Station

50.2

210.9

NTD

75.8

247.7

SAT Station

59.3

236.3

KTU(NOL) Station

7.3

86.2

Shui Mei Road Ancillary Building (SMA)

9.7

15.1

Pok Wai Ancillary Building (PWA)

10.7

15.4

Long Ha Tsuen Ancillary Building (LHA)

7.4

8.7

San Tin Ancillary Building (SNA)

14.8

47.0

Ka Lung Road Ancillary Building (KLA)

13.3

25.4

Kwu Tung Road Ancillary Building (KTA)

15.2

44.8

Pak Shek Au Ancillary Building (PAA)

11.8

24.9

 

7.5.7         To summarise, the peak flow rate estimated under Method (i) represents the maximum sewage flow received by terminal manholes/sewage holding tanks under extreme/emergency scenarios. Whereas the daily flow rate estimated through Method (ii) estimates the sewage flow rate generated under normal daily operations of NOL.

7.5.8         The total peak flow generated from this Project estimated from Method (i) is 1,127.1 L/s (including 923.1 L/s from stations and depot, and 204.0 L/s from ancillary buildings). Whereas the averaged dry weather flow generated under normal daily operations of NOL estimated from Method (ii) is 1,466.5 m3/day.

Sewage Flow Estimation for Track Washdown Water

7.5.9         Track washdown water is allowed in the proposed sewerage network, which is a maximum of 25,000L spread evenly over 1km of tracks per 1 hour.  When assuming a 2km section of single track is washed within 1 hour, the contribution of track washdown water would be 14L/s.

7.5.10       The proposed rail alignment would be tunneled. The track washdown water will then be conveyed by tunnel sewerage system, and ultimately discharge to stations via internal sewage pumping system. 

Cumulative Impacts and Proposed Sewerage Network

7.5.11       To determine the connection arrangement to the public sewerage system, the cumulative sewage flow with the interfacing projects were estimated to check whether the capacity is sufficient.   As part of the Project areas (i.e., NTM, SAT, and KTU Stations) fall into the planned development areas of the Northern Metropolis, new public sewerage networks are anticipated for the new town developments including the stations.  A list of interfacing projects is shown in Table 7.7. 

Table 7.7   Planned Project and Development Time Frame

Planned Project / Development

Time Frame

Kam Tin South Public Housing Development

Completion years for Site 1

Phase 1: 2027/2028

Phase 2: 2027

Completion years for Site 4A

Phase 1: 2028

Phase 2: 2028

Phase 3: 2030

Completion years for Site 6

Phase 1: 2027

Phase 2: 2028

Kam Sheung Road Package 2 Property Development

Under planning

Park Yoho Phase 2 & 3 Development

Under planning

Sha Po Public Housing Development

Completion year: 2031

Land Use Review Study for Ngau Tam Mei Area

Under planning

San Tin Lok Ma Chau Development Node

Completion year: 2034

Kwu Tung North New Development Area

Advance works completion year: 2026

Remaining phase completion year: 2031

7.6              Proposed Sewerage Connections

7.6.1         In general, sewage generated from the operation of the Project would be connected to the public sewerage system and discharged to the planned YL EPP, planned STLMC EPP, and planned SWH EPP for treatment.  At some satellite locations without nearby public sewerage systems, sewage generated will be stored at the proposed sewage holding tanks before being tankered away by competent contractors regularly.  Table 7.8 below summarises the proposed sewerage connections and treatment locations for the Project.

Table 7.8   Proposed Sewerage Connection and Treatment Locations

Locations

Proposed Sewerage Connection Location

Proposed Sewage Treatment Location

KSR(NOL) Station

Planned KTS Sewerage System

Planned YL EPP via existing Kam Tin SPS

AUT Station

Planned Sha Po Sewerage System

Planned YL EPP via existing / planned Sha Po SPS

NTM Station

Proposed Temporary Sewage Holding Tank / Planned NTM LUR Sewerage System

Tanker away by MTRCLĄ¯s competent contractor(2) / TBC by NTM LUR(1)

NTD

Proposed Temporary Sewage Holding Tank / Planned NTM LUR Sewerage System

Tanker away by MTRCLĄ¯s competent contractor(2) / TBC by NTM LUR (1)

SAT Station

Planned STLMC DN Sewerage System

Planned STLMC EPP

KTU(NOL) Station

Planned KTN NDA Sewerage System

Planned SWH EPP via Planned KTN SPS

Shui Mei Road Ancillary Building (SMA)

Proposed Sewerage Holding Tank

Tanker away by MTRCLĄ¯s competent contractor(2)

Pok Wai Ancillary Building (PWA)

Proposed Sewerage Holding Tank

Tanker away by MTRCLĄ¯s competent contractor(2)

Long Ha Tsuen Ancillary Building (LHA)

Proposed Sewerage Holding Tank

Tanker away by MTRCLĄ¯s competent contractor(2)

San Tin Ancillary Building (SNA)

Planned STLMC DN Sewerage System

Planned STLMC EPP

Ka Lung Road Ancillary Building (KLA)

Proposed Temporary Sewage Holding Tank / Planned STLMC DN Sewerage System

Tanker away by MTRCLĄ¯s competent contractor(2) / Planned STLMC EPP

Kwu Tung Road Ancillary Building (KTA)

Proposed Temporary Sewage Holding Tank / Planned STLMC DN Sewerage System

Tanker away by MTRCLĄ¯s competent contractor(2) / Planned STLMC EPP

Pak Shek Au Ancillary Building (PAA)

Proposed Temporary Sewage Holding Tank / Planned STLMC DN Sewerage System or Planned KTN NDA Sewerage System

Tanker away by MTRCLĄ¯s competent contractor(2) / Planned SWH EPP via Planned KTN SPS

Notes:

(1)   TBC = to be confirmed.

(2)   The tanker away method should be similar to that adopted by the existing Pat Heung Depot.

 

7.7              Proposed Sewerage Arrangement at Specific Locations

7.7.1         The proposed sewerage key plan and layout plans are shown in Figure Nos. C1603/C/NOL/ACM/M54/301 to 311.

KSR(NOL) Station

7.7.2         The sewage generated at KSR(NOL) Station is proposed to be conveyed by gravity sewers towards the middle and northern ends of the station.  Sewage terminal manholes and public sewerages are proposed for the connection to Kam Tin South planned sewerage network, which will then convey sewage to Kam Tin SPS before ultimately discharged to the planned YL EPP.

AUT Station

7.7.3         The sewage generated at AUT Station is proposed to be conveyed by gravity sewers towards the southern end of the station.  Sewage terminal manholes with public sewerages are proposed for connection to the planned sewerage network of Sha Po Public Housing Development, which will then be connected to the Sha Po SPS before being ultimately discharged to the planned YL EPP.

NTM Station and NTD

7.7.4         The sewage generated at NTM Station is proposed to be conveyed by the proposed internal gravity sewers towards the northern end of station and discharge to the proposed sewage terminal manholes.  Proposed sewage generated at NTD will also be conveyed by the proposed internal sewerage network and discharged to the proposed sewage terminal manhole.  Sewage generated at both NTM Station and NTD will be conveyed to the public sewers at the northeastern end, and a sewer plug end is proposed for connection to the NTM LUR planned sewerage network.  The sewage would be ultimately discharged to the Planned STLMC EPP via NTM SPS. Temporary sewage arrangements at both NTM Station and NTD would be required.

SAT Station

7.7.5         The sewage generated at SAT Station is proposed to be conveyed by gravity sewers.  It is proposed that a sewage terminal manhole with sewer plug ends should be connected the sewerage system of the planned STLMC DN, with the sewage ultimately discharged to the planned STLMC EPP.

KTU Station

7.7.6         The sewage generated at KTU Station is proposed to be conveyed by gravity sewers.  It is proposed that a sewage terminal manhole with sewer plug ends should be connected the sewerage system of the planned KTN NDA, with the sewage connected ultimately to the planned SWH EPP.

7.7.7         Provisions for connection from KTU(NOL) Station are reserved at the sewerage system constructed with KTU(EAL) Station and it is designed to cater for KTU (NOL) Station development.  The interim sewerage arrangements would be decommissioned by the time of KTU(NOL) Station opening.

Tunnel Sewage

7.7.8         The foul water accumulated at the foul water line sumps in railway tunnels will be pumped to nearby stations for collection and eventual discharge into the public sewerage system.

Ancillary Buildings

7.7.9         For ancillary buildings including SMA, PWA, and LHA, due to the unavailability of existing public and planned sewer nearby, discharge generated from toilets and washdown sanitary fitments will be collected in sewage holding tanks located at ground level.  The sewage will then be tankered away by competent contractors regularly.  Sewage plug ends were proposed in the design of these ancillary buildings in case of future connections.

7.7.10       For ancillary buildings including KLA, KTA and PAA, disposal from toilet and washdown sanitary fitments the sewage generated will be discharged by gravity sewers to a sewage terminal manhole, and then connected to the planned public sewers in NTM LUR, STLMC DN and KTN NDA.  Temporary sewerage arrangements would be required.

Ventilation Buildings

7.7.11       For ancillary buildings containing ventilation buildings (i.e. SMA, PWA, SNA and KTA), discharge from toilets and washdown sanitary fitments will be discharged by gravity sewers to a sump pit located at the track level.  The sewage will then be collected and transferred via sump pumps to a foul water terminal manhole at ground level, before being connected to sewage holding tanks for further connection to the public sewer system or tankered away by competent contractors.  Vent pipes will be connected to all traps of water closets and urinals, which will then be connected to a common vent stack and will be discharged to the open space located above ground level.

7.7.12       For surface wastewater sewerage system, discharges from floor drains will be connected to the sump pit at track level via gravity sewers.  The discharges will be then collected and lifted by sump pumps to an oil interceptor at ground level before being discharged to a foul water terminal manhole.

Temporary Sewerage Arrangements

7.7.13       All sewages generated at different locations of the Project will be collected by public sewerage treatments and directed to EPPs for treatment (unless specifically stated otherwise).  However, in case that the municipal sewerage systems for the new town developments and along the NOL alignment by DSD were not in commission before the Project (i.e. Year 2034), the effluent generated from the Project would be collected in temporary sewage holding tanks at ground level, which will be tankered away for off-site disposals.  Provision of plug end would be allowed in the temporary sewerage system for future connections to the public sewerage system.  Only the NTM Station, NTD, KLA, KTA, and PAA would require temporary sewerage arrangements.

7.7.14       Considering that some planned stations, depot and ancillary buildings (i.e., NTM Station, NTD, and ancillary buildings listed under Section 7.7.10) are located at more than 2km away from existing public sewers, and that the commissioning time between the stations and their respective interfacing developments are less than 2 years, as listed in Table 7.7 above, the timeframe requiring temporary sewerage arrangements would be relatively short, and hence it would not be practical to construct a sewerage network just to cater for the Project.

7.7.15       The tanker away frequencies under normal operation (proposed that 15m3 tank trucks will be deployed) for NTM Station and NTD will be approximately 14 and 17 times daily respectively, before public sewerage system is available for connection.  Sewage generation at SMA, PWA, and LHA would be very minimal as these ancillary buildings are mainly used by MTR staff.  Tanker away frequency is expected to be once to twice per a month.

7.7.16       It is unlikely that temporary sewage arrangements will be provided for SAT Station and SNA, as the planned sewerage networks of STLMC DN will be available near the commissioning time of these facilities. However, in case of programme mismatch, it is recommended that tanker away by a competent registered contractor at the designated disposal location should be arranged as a temporary mitigation measure to dispose of sewage generated at these locations.

7.7.17       Tanker away arrangement will be carried out by competent registered contractor and disposed the connected sewage at designated disposal locations to be further advised by DSD after further liaison on tanker away arrangement.

Interim Discharge of Effluent

7.7.18       All sewage generated would either be discharged to the planned SWH EPP, planned YL EPP, and planned STLMC EPP for treatment, or tankered away regularly by competent contractors for off-site disposal. Hence, no interim discharge of effluent is anticipated.

7.8           Demarcation of Maintenance Responsibilities

7.8.1         Table 7.9 lists out the demarcation of the maintenance responsibilities for the various proposed sewerage facilities.

Table 7.9  Proposed Demarcation of Maintenance Responsibilities

Description

Proposed Works Agent

Proposed Maintenance Agent

Proposed Sewers and Manholes up to Terminal Manholes

MTR Corporation

MTR Corporation

Proposed Sewers and Manholes beyond Terminal Manholes

MTR Corporation

DSD

7.9              Potential Sewerage Impacts and Proposed Mitigation Measures

Sewerage Impact

7.9.1         In this Project, sewage generated will be discharged to the planned SWH EPP, planned YL EPP, and planned STLMC EPP, except for satellite locations and temporary arrangements. The planned EPPs will have a sufficient capacity to handle the sewage load generated by this Project. For locations where there are unavailable existing or planned public sewerage systems nearby, sewage will be tankered away regularly by competent contractors.

7.9.2         Planned sewerage systems located in Kam Tin South, Sha Po, Ngau Tam Mei, San Tin, and Kwu Tung North were also identified, which have considered and incorporated the proposed sewage load generated by this Project in their designs.

7.9.3         For existing public sewerage systems, there is sufficient capability to handle the additional sewage load generated by the Project.  As for the planned public sewerage systems, the additional sewage load generated by the Project has been accounted for by the interfacing projects (i.e. Kam Tin South, Sha Po, NTM LUR, STLMC DN, and KTN NDA), any planned upgrades have been incorporated in their respective assessments, and thus the planned public sewerage systems will have sufficient capacity to handle the additional sewage load generated by this Project.

Proposed Mitigation Measures

7.9.4         Considering that the existing and planned sewage load can be sufficiently handled by both existing and planned public sewerage systems, it is anticipated that there would be no unacceptable adverse impact on the sewerage systems arising from the operation of the Project.  Hence, no mitigation measures are required.

7.10           Conclusion

7.10.1       The implications of potential impacts on the existing public sewerage system from the potential sewage generated by the Project was assessed.

7.10.2       The Project is located within the existing Yuen Long sewerage catchment and the planned STLMC DN sewerage catchment.  Existing sewerage systems were only identified in the vicinity of KSR(NOL) and AUT Stations.  Planned sewerage systems in Kam Tin South, Sha Po, Ngau Tam Mei, San Tin and Kwu Tung North were also identified.  All the sewage generated by this Project will be discharged to MTRCLĄ¯s Sewage Holding Tanks, planned SWH EPP, planned YL EPP, and planned STLMC EPP for treatment, except for satellite locations and temporary arrangements.

7.10.3       The proposed sewers will be generally connected to nearby existing or planned sewerage systems via the proposed terminal manholes to minimise the construction implications.

7.10.4       It is anticipated that there would be no adverse impacts to the existing and planned sewerage system due to the Project.

7.10.5       Analysis of planned sewer usage for connection will be updated when further information is available.  Upgrade of planned sewers may be required subject to further assessment.  Further liaison with Kwu Tung North New Development Area, Kam Tin South Public Housing Development, Sha Po Public Housing Development, Ngau Tam Mei Area Land Use Review and San Tin / Lok Ma Chau Development Node is required for the proper arrangement of sewerage interfaces.