TABLE OF CONTENTS
1.4 Recommended
Outline Development Plan
1.5 Designated
Project under EIAO
1.7 Objectives
of this EIA Study
1.8 Structure
of the EIA Report
List of Tables
Table 1.1 Schedule 2 Designated Projects in this
Project
Table 1.2 Summary of Non-Designated Projects
List of Figures
Project Location Plan |
|
Location of Designated Projects |
|
|
|
|
|
1: An urban development or redevelopment project covering an area more
than 50 ha.
Table 1.1 Schedule 2 Designated Projects in
this Project
Ref. No. |
Schedule 2 Designated
Project |
Work Component
/Reference in Revised RODP |
||
DP1 1 |
A.1 |
A carriageway for motor vehicles that is an expressway, trunk road,
primary distributor road or district distributor road |
Construction and operation of primary distributor road P1, district distributor
road D1, D2, D3, D4, D5 and D6. |
|
DP2 1 |
F.1 |
Sewage treatment works with an installed capacity of more than 15,000m3
per day |
Construction and operation of STLMC Effluent Polishing Plant |
|
F.2 |
Sewage treatment works with an
installed capacity of more than 5,000m3 per day; and a boundary of
which is less than 200m from the nearest boundary of an existing or planned
residential area and educational institution |
|||
DP3 1 |
F.4 |
A facility for generating, from
sewage effluent treated by a sewage treatment plant, reclaimed water for use
by the general public |
Construction and operation of STLMC
Water Reclamation Plant |
|
DP4 2 |
G.2 |
A refuse transfer station |
Construction and operation of a
refuse transfer station |
|
DP5 2 |
H.1 |
A 400kV electricity substation
and transmission line |
Construction and operation of two
400kV electricity substations |
|
DP6 1 |
I.1 |
A drainage channel or river
training and diversion works located less than 300 m from the nearest
boundary of an existing or planned conservation area |
Revitalisation works (i.e. river
training, diversion works) for San Tin Eastern Main Drainage Channel are
located less than 300m from Conservation Area 3 |
|
DP7 1 |
P.1 |
A residential or recreational
development, other than New Territories exempted houses, within Deep Bay
Buffer Zone 2 |
Recreational development for
proposed Sites O.1.1, O.1.2, and O.1.3 (as open space) encroach into Deep Bay
Buffer Zone 2 |
Note:
1
Subject to an Environmental Permit application for
both construction and operation phases of the DP under this EIA Study
2
Subject to separate EIA Study, as required
3
The future zonings of the concerned ‘Conservation
Area’ as shown on Figure 1.2 are subject to change due to the land use proposals
as reflected in the Revised RODP.
Table 1.2 Summary of Non-Designated Projects
Non-Designated Project |
Sub-Element |
Residential Development |
Public Housing Site (RSc) |
Private Housing - Zone 1 (R1) |
|
Village Type Development (V) |
|
Government, Institutional or
Community (G/IC) |
Divisional Police Station |
Fire Station |
|
Ambulance Depot |
|
Library |
|
Sports Centre |
|
Market |
|
Swimming Pool Complex |
|
EcoHub |
|
Education (E) |
Primary and Secondary Schools |
Open Space (O) |
Recreational Facilities and Landscaping |
Amenity (A) |
Roadside amenity |
Green Belt (GB) |
- |
Other Specified Uses (OU) |
Other Specified Uses (Mixed Use) -
Zone 1 (OU(MU)1) |
Other Specified Uses (Mixed Use) -
Zone 2 (OU(MU)2) |
|
Other Specified Uses (Innovation and Technology) (OU(I&T)) |
|
Other Specified Uses (Green Fuel
Station) (OU(GFS)) |
|
Other Specified Uses (Logistics,
Storage and Workshop) (OU(LSW)) |
|
Other Specified Uses (Railway
Ancillary Facilities) (OU(RAF)) |
|
Other Specified Uses (Ventilation
Building) (OU(VB)) |
|
District Cooling System (OU(DCS)) |
|
Reclaimed Water Reservoir and
Fresh Water Reservoir (OU(WSR)) |
|
Refuse Collection Point (OU(RCP)) |
|
Public Transport Interchange (OU(PTI)) |
|
Sewage Pumping Station (OU(SPS)) |
|
Stormwater Pumping Station (OU(SmPS)) |
|
Electrical Substation (OU(ESS)) |
|
Roads |
Local roads |
(a)
Should
the change(s) involve a DP item under Schedule 2 of the EIAO, the requirements
under the EIAO will be complied with; and
(b)
Should
the change(s) not involve any DP items under Schedule 2 of the EIAO, prevailing
planning mechanisms and standards will be followed and
relevant EIA findings will be conformed to.
(a)
the
overall acceptability of any adverse environmental consequences that are likely
to arise as a result of the Project and its staged implementation;
(b)
the
conditions and requirements for the detailed design, construction
and operation of the Project to mitigate against adverse environmental
consequences wherever practicable; and
(c)
the
acceptability of residual impacts after the proposed mitigation measures are
implemented.
(a)
to
describe the Project and associated works together with the requirements and
environmental benefits for carrying out the project;
(b)
to
identify and describe the elements of the community and environment likely to
be affected by the Project, and/or likely to cause adverse impacts to the
Project, including both the natural and man-made environment and the associated
environmental constraints;
(c)
to
identify and quantify emission sources and determine the significance of
impacts on sensitive receivers and potential affected uses, and to propose
measures to mitigate these impacts;
(d)
to
identify and quantify waste management requirements and to propose measures to
mitigate these impacts;
(e)
to
identify and quantify contaminated land within any Project area for development
works and to propose measures to avoid disposal in the first instance;
(f)
to
identify and quantify any potential losses or damage to flora, fauna and
natural habitats and fisheries activities/resources and to propose measures to
mitigate these impacts;
(g)
to
identify any potential landscape and visual impacts and to propose measures to
mitigate these impacts;
(h)
to
identify any adverse impacts on sites of cultural heritage and to propose
measures to mitigate these impacts;
(i)
to
identify and quantify any potential hazard to life and to propose measures to
mitigate these impacts if required;
(j)
to
identify any landfill gas hazard to sensitive receivers of the Project located
within the consultation zone of Ngau Tam Mei Landfill and to propose measures
to mitigate these impacts;
(k)
to
identify any impacts from electric and magnetic field and to propose measures
to mitigate these impacts;
(l)
to
propose the provision of infrastructure or mitigation measures to minimise
pollution, environmental disturbance and nuisance during construction and
operation of the Project;
(m)
to
investigate the feasibility, effectiveness and implications of the proposed
mitigation measures;
(n)
to
identify, predict and evaluate the residual (i.e. after practicable mitigation)
environmental impacts and the cumulative effects expected to arise during
construction and operation of the Project in relation to the sensitive
receivers and potential affected uses;
(o)
to
identify, assess and specify methods, measures and standards, to be included in
the detailed design, construction and operation of the Project which are
necessary to mitigate these residual environmental impacts and cumulative
effects and reduce them to acceptable levels;
(p)
to
investigate the extent of the secondary environmental impacts that may arise
from the proposed mitigation measures and to identify constraints associated
with the mitigation measures recommended in the EIA study, as well as the
provision of any necessary modification;
(q)
to
design and specify the environmental monitoring and audit requirements;
(r)
to
identify any additional studies necessary to implement the mitigation measures
or monitoring and proposals recommended in the EIA report; and
(s)
to
identify DP(s) listed under Schedule 2 of the EIAO as part of the Project for
assessment under the EIA study.
· Section 3: Air Quality Impact
· Section 4: Noise Impact
· Section 5: Water Quality Impact
· Section 6: Sewage and Sewerage Treatment Implications
· Section 7: Waste Management Implications
· Section 8: Land Contamination
· Section 9: Landfill Gas Hazard
· Section 10: Ecological Impact
· Section 11: Fisheries Impact
· Section 12: Cultural Heritage Impact
· Section 13: Hazard to Life
· Section 14: Landscape and Visual Impact
· Section 15: Electric and Magnetic Fields