TABLE OF CONTENT

 

List of Appendices

Appendix 2.1

Preliminary Construction and Population Intake Schedule

Appendix 2.2

Tentative Construction Programme

Appendix 2.3

General Layout Plan of Alternative Sites of Water Reservoirs

Appendix 2.4

Consideration of Alternative Road Alignment (Road P1)

Appendix 2.5

General Layout Plan of Alternative Sites of STLMC Effluent Polishing Plant and Food Waste Pre-treatment Facilities

Appendix 2.6

General Layout of Alternative Alignment for Protection of Mai Po Lung Village

Appendix 2.7

General Layout of Alternative Sites of STLMC Water Reclamation Plant

Appendix 2.8

General Layout of Alternative Sites of Refuse Transfer Station

Appendix 3.1

(Not Used)

Appendix 3.2

(Not Used)

Appendix 3.3

Calculation of EPP Emission Source

Appendix 3.4

Traffic Data

Appendix 3.5

Calculation of Vehicular Emission Source

Appendix 3.6

Calculation of Emissions Associated with Transport Interchange Hub

Appendix 3.7

Calculation of Emissions from Portal

Appendix 3.8

(Not Used)

Appendix 3.9

Emission Inventory of Major Stack in 4km Boundary

Appendix 3.10

Calculation of Odour Emission Source at EPP, FWPF and SPS

Appendix 3.11

Calculation of Odour Emission Source at Retained Pig Farm and RTS

Appendix 3.12

Calculation of Odour Emission Source at San Tin Barracks STW

Appendix 3.13

Determination of Surface Characteristics

Appendix 3.14

Detailed Prediction Results (Operation Phase, Year 2031)

Appendix 3.15

Detailed Prediction Results (Operation Phase, Year 2034)

Appendix 3.16

Detailed Prediction Results (Operation Phase, Year 2039)

Appendix 3.17

Detailed Prediction Results (Odour Impact)

Appendix 3.18

Frequency and Magnitude of Odour Exceedance for ASRs within Exceedance Zone

Appendix 3.19

Derivation of Cumulative Annual Average NOX-to-NO2 Conversion Equation using Jenkin Method

Appendix 3.20

Comparison of Odour Impact between Existing and Future Scenarios

Appendix 4.1

Photographic Records of the Existing Representative Noise Sensitive Receivers

Appendix 4.2

Prevailing Background Noise Measurement Data

Appendix 4.3

Construction Programme

Appendix 4.4

Traffic Forecast Data (Year 2024)

Appendix 4.5

Traffic Forecast Data (Post-2046)

Appendix 4.6

Endorsement of the Traffic Forecast Data from Transport Department

Appendix 4.7

Information from MTRC for the Operation Details of LMCSL

Appendix 4.8

Construction Plant Inventory (Unmitigated)

Appendix 4.9

Construction Noise Impact Assessment (Unmitigated)

Appendix 4.10

Traffic Noise Impact Assessment (Unmitigated)

Appendix 4.11

Detailed Calculation of Fixed Noise Impact Assessment

Appendix 4.12

Results of Airborne Railway Noise Impact Assessment

Appendix 4.13

Construction Plant Inventory (Mitigated)

Appendix 4.14

Construction Noise Impact Assessment (Mitigated)

Appendix 4.15

Traffic Noise Impact Assessment (Mitigated)

Appendix 4.16

Results of the Eligibility Assessment for Indirect Technical Remedies

Appendix 4.17

Computation Plot of Traffic Noise Model

Appendix 5.1

Indicative Locations of Marine Water Sensitive Receivers and Water Quality Monitoring Stations

Appendix 5.2

Model Grid Layout, Properties and Model Verifications

Appendix 5.3

Spin-up Test Results

Appendix 5.4

Contour Plots of Water Quality Modelling Results

Appendix 5.5

Predicted Water Quality at Key Water Sensitive Receivers

Appendix 5.6

Time Series Plots of Water Quality Modelling Results - Dry Season

Appendix 5.7

Time Series Plots of Water Quality Modelling Results - Wet Season

Appendix 8.1

Contamination Assessment Plan

Appendix 8.2

Health Impact Assessment Report

Appendix 8.3

Potentially Contaminated Sites identified in the Schedule 2 Designated Projects

Appendix 9.1

Landfill Monitoring Data

Appendix 10.1

Representative Photographs of Habitat

Appendix 10.2

Representative Photographs of Species and Sites of Conservation Importance

Appendix 10.3

Flora Species Recorded within the Assessment Area

Appendix 10.4

Fauna Species Recorded within the Assessment Area

Appendix 10.5

Records of Egretries, Ardeid and Great Cormorant Night Roosts, and Associated Flight Paths

Appendix 10.6

Sample Calculations of Functional Value

Appendix 10.7

Sensitivity Analysis for Abandoned Pond Usage

Appendix 10.8

Draft Habitat Creation and Management Plan

Appendix 11.1

Representative Photographs of Fishponds within the Assessment Area

Appendix 12.1

Cultural Heritage Resources and Other Identified Items Recording Sheets

Appendix 12.2

Full List of Built Heritage and Other Identified Items

Appendix 12.3

Fieldwork Records

Appendix 12.4

Maximum Entropy Modelling Result Paper

Appendix 12.5

Working Photos of Field Scanning

Appendix 13.1

Hazard to Life Assessment for Proposed Effluent Polishing Plant (EPP)

Appendix 13.2

Hazard to Life Assessment for HP Gas Pipeline

Appendix 13.3

Hazard to Life Assessment for Green Fuel Stations

Appendix 14.1

Broad-brush tree survey

Appendix 14.2

Planning, urban design, blue-green framework and building height concept

Appendix 14.3

Typical section for noise barriers

Appendix 14.4

Perspective view of designated projects

Appendix 18.1

Summary of Key Assessment Assumptions and Limitation of Methodologies

Appendix 18.2

Summary of Environmental Impacts

Appendix 18.3

Details of Schedule 2 Designated Projects for Environmental Permit Application