TABLE OF CONTENT
1.1. Background
1.2. The Assignment
1.3. Purpose and Objectives of this EIA Study
1.4. EIA Study Scope
1.5. Use of Relevant Studies
1.6. Structure of this Report
2.1. Location and Scope of the Project
2.2. Background and History of the Project
2.3. Design of the Project
2.4. Operation of the Project
2.5. Construction Methodology
2.6. Project Implementation Programme
2.7. Concurrent Projects
2.8. Identification of Key Environmental Issues
2.9. Public Consultation
3. Needs of Project and Consideration of Alternatives
3.1. Introduction
3.2. Purposes, Objective and Environmental Benefits of the Project
3.3. Consideration of Scenarios With and Without the Project
3.4. Consideration of Alternative Options
3.5. Sustainability Consideration
4. Air Quality Impact Assessment
4.1. Introduction
4.2. Environmental Legislation, Standards and Guidelines
4.3. Description of Existing Environment
4.4. Identification of Air Sensitive Receivers
4.5. Identification of Potential Sources of Impacts
4.6. Assessment Methodology
4.7. Air Quality Impact Assessment
4.8. Summary of the Mitigation Measures
4.9. Residual Impacts
4.10. Environmental Monitoring and Audit
4.11. Conclusion
5.1. Introduction
5.2. Environmental Legislation, Standards and Guidelines
5.3. Identification of Noise Sensitive Receivers
5.4. Description of the Existing Environment
5.5. Identification of Potential Noise Sources
5.6. Assessment Methodology
5.7. Prediction and Evaluation of Noise Impacts
5.8. Proposed Mitigation Measures
5.9. Assessment of Noise Impact with the Application of Mitigation Measures
5.10. Residual Impacts
5.11. Environmental Monitoring and Audit
5.12. Conclusion
6. Water Quality and Sewerage Impact Assessment
6.1. Introduction
6.2. Environmental Legislation, Standards and Guidelines
6.3. Existing Environment
6.4. Assessment Methodology
6.5. Construction Phase Impact Assessment
6.6. Operation Phase Impact Assessment
6.7. Mitigation Measures
6.8. Cumulative Impacts
6.9. Residual Impacts
6.10. Environmental Monitoring and Audit
6.11. Conclusion
7. Waste Management Implications Assessment
7.1. Introduction
7.2. Relevant Environmental Legislation, Standards and Guidelines
7.3. Assessment Methodology
7.4. Identification and Evaluation of Environmental Impacts. 7-5
7.5. Evaluation of Impacts
7.6. Mitigation Measures
7.7. Residual Impacts
7.8. Environmental Monitoring and Audit
7.9. Conclusion
8. Impact to Cultural heritage
8.1. Introduction
8.2. Environmental Legislation and Standards
8.3. Assessment methodology
8.4. Baseline Condition
8.5. Key Character defining elements (CDEs)
8.6. The Project description
8.7. Conservation Policies and Guidelines
8.8. Impact Assessment
8.9. Conclusion
8.10. Reference
9. Landscape and Visual Impact Assessment
9.1. Introduction
9.2. Relevant Legislation, Standards and Guidelines
9.3. Assessment Methodology
9.4. Review of the Planning and Development Control Framework. 9-10
9.5. Landscape Baseline Study
9.6. Visual Baseline
9.7. Identification and Assessment of Landscape Impacts
9.8. Identification and Assessment of Visual Impacts
9.9. Mitigation Measures
9.10. Preliminary Evaluation of Residual Impacts After Mitigation and Cumulative Impact
9.11. Environmental Monitoring and Audit
9.12. Conclusion
10.1. Introduction
10.2. Summary of Environmental Outcomes
10.3. Summary of Environmental Impacts
10.4. Environmental Monitoring and Audit (EM&A)
10.5. Overall Conclusion
11. Environmental Monitoring And Audit Requirements
11.1. Introduction
11.2. Air Quality
11.3. Noise
11.4. Water Quality and Sewerage
11.5. Waste Management Implication
11.6. Cultural Heritage
11.7. Landscape and Visual
11.8. Summary of EM&A Requirements
12.1. Introduction
LIST OF FIGURES
Site Location Plan Demarcation Plan of Works Within Site |
|
Locations of Concurrent Projects |
|
Locations of Representative of Air Sensitive Receivers |
|
Locations of Representative Noise Sensitive Receivers |
|
Locations of Background Noise Measurement Points and Representative Noise Assessment Points |
|
Locations of Notional Source Positions for Construction Phase |
|
Locations of Key Noise Sources within the Annex Block |
|
Locations of Water Quality Monitoring Stations and Key Water Sensitive Receivers |
|
Proposed Sewerage Layout Plan |
|
Location of Proposed Stockpile Area |
|
Cultural Heritage Assessment Area |
|
Geology and Previous Archaeological Investigation |
|
Site Location Plan For Landscape and Visual Impact Assessment |
|
Aerial Photograph and Landscape Impact Study Area |
|
Review of Planning and Development Control Framework |
|
Landscape Resources Plan |
|
Landscape Resources Photographs (1 of 2) |
|
Landscape Resources Photographs (2 of 2) |
|
Landscape Character Area |
|
Landscape Character Area Photographs |
|
Zone of Visual Influence (ZVI) and Visually Sensitive Receivers (VSRS) |
|
Photomontage Viewpoint 01 (View from HKO1883 Building) (1 of 2) |
|
Photomontage Viewpoint 01 (View from HKO1883 Building) (2 of 2) |
|
Photomontage Viewpoint 02 (View from Bauhinia Hotel) (1 of 2) |
|
Photomontage Viewpoint 02 (View from Bauhinia Hotel) (2 of 2) |
|
Photomontage Viewpoint 03 (View from Miramar Tower) (1 of 2) |
|
Photomontage Viewpoint 03 (View from Miramar Tower) (2 of 2) |
|
Photomontage Viewpoint 04 (View from St. Andrew’s Christian Centre) (1 of 2) |
|
Photomontage Viewpoint 04 (View from St. Andrew’s Christian Centre) (2 of 2) |
|
Photomontage Viewpoint 05 (View from Victoria Towers) (1 of 2) |
|
Photomontage Viewpoint 05 (View from Victoria Towers) (2 of 2) |
|
Photomontage Viewpoint 06 (View from Kowloon Park) (1 of 2) |
|
Photomontage Viewpoint 06 (View from Kowloon Park) (2 of 2) |
|
Photomontage Viewpoint 07 (View from Observatory Road) (1 of 2) |
|
Photomontage Viewpoint 07 (View from Observatory Road) (2 of 2) |
|
Photomontage Viewpoint 08 (View from Rooftop of Lok Fun Mansion) (1 of 2) |
|
Photomontage Viewpoint 08 (View from Rooftop of Lok Fun Mansion) (2 of 2) |
|
Landscape and Visual Mitigation Measures Plan |
|
Landscape and Visual Mitigation Measures Plan GF & 1F |
|
Landscape and Visual Mitigation Measures Plan 2F |
|
Landscape and Visual Mitigation Measures Plan 3F |
|
Landscape and Visual Mitigation Measures Plan RF |
|
Individual Tree Survey on Landscape Resource Plan |
|
Indicative Landscape Section 01 |
|
Indicative Landscape Section 02 |
|
Preliminary Compensatory Tree Planting Plan (Sheet 1 of 2) |
|
Preliminary Compensatory Tree Planting Plan (Sheet 2 of 2) |
LIST OF APPENDICES
Tentative Programme of the Project |
|
Response to Key Public Comments |
|
Rendering Diagram for Building Design Options |
|
Results of Prevailing Background Noise Surveys |
|
Detailed Calculation of Fixed Plant Noise Impact Assessment |
|
Calculation of Construction Noise Impact Assessment and Construction Plant Inventory (Unmitigated) |
|
Calculation of Construction Noise Impact Assessment and Construction Plant Inventory (Mitigated) |
|
Sewerage Impact Assessment |
|
Calculation of Surface Runoff Asbestos Investigation Report |
|
Tree Survey Report |
|
Summary of Environmental Impacts |
|
Documentation of Key Assessment Assumptions, Limitation of Assessment Methodologies and Related Prior Agreement(s) with Director |