Papers Discussed by EIA Subcommittee in 2002
66th Meeting on 28 January 2002
1. Widening of Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange (without Figure)
2. Sheung Shui to Lok Ma Chau Spur Line - Tunnel/Viaduct Option
67th Meeting on 7 February 2002
2. Sheung Shui to Lok Ma Chau Spur Line - Tunnel/Viaduct Option
68th Meeting on 4 March 2002
3. Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay (without map)
4. Yau Tong Bay Development - Reclamation of Yau Tong Bay (without map)
5. Decommissioning of Cheoy Lee Shipyard at Penny's Bay (without figure)
6. Permanent Aviation Fuel Facility Preliminary Results of the EIA (without map)
69th Meeting on 18 March 2002
5. Decommissioning of Cheoy Lee Shipyard at Penny's Bay (without figure)
70th Meeting on 27 May 2002
7. Fill Bank at Tseung Kwan O Area 137
8. Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha Investigation and Preliminary Design Assignment
71st Meeting on 3 June 2002
9. Final Soil Quality Report of Previously Contaminated Areas - South East Kowloon Development at Kai Tak Airport (without Annex A)
10. Informal dialogue - EIA report on Shenzhen Western Corridor
72nd Meeting on 8 July 2002
11. Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 1 Packages 1A-1T and 1B-1T - Kam Tin Trunk Sewerage Phases I and II
12. Permanent Aviation Fuel Facility (without Figure 1)
13. Informal dialogue - Ngong Ping Sewage Treatment Plant and Sewerage (without drawing)
73rd Meeting on 5 August 2002
14. Deep Bay Link (without Figure 1)
74th Meeting on 30 September 2002
16. Ngong Ping Sewage Treatment Works and Sewerage
17. Shenzhen Western Corridor
18. Construction of Lung Kwu Chau Jetty (by circulation)
75th Meeting on 4 November 2002
No paper was discussed.
Circulation Paper