Rural Planning and Improvement Strategy - Minor Projects Environmental Guidance Note

3. Guidances on Environmental consideration of RPIS Minor Projects

Water Supply Works

 

3.24 Laying of sub-marine water pipes within or in the vicinity of ecological sensitive areas, e.g. the presence of corals, should be avoided. Pipe routing on land should be designed carefully so as to minimise the potential ecological impact such as tree felling.
   
3.25 Proper design of pump house/header tank such that the level of the intruding noise during operation at facades of noise sensitive receivers are in compliance with the Hong Kong Planning Standard and Guidelines criteria.

 