Sludge Treatment Facility

Sludge Treatment Facility

Image of Sludge Treatment Facility

Facility : Sludge Treatment Facility (STF)
Location : Tsang Tsui, Nim Wan, Tuen Mun
Design Capacity : 2,000 tonnes/day
Commencement of Operation : 1 April 2015 (Phase 1)
    5 April 2016 (Phase 2)
Contract Operation Period : 15 years
Contractor : VW-VES(HK) Ltd

Technical Information

Technical Information
Remarks
Design Capacity
· 1,600 tonnes/day (Phase 1)
· 400 tonnes/day (Phase 2)
Incineration technology
· 4 fluidized bed incinerators, grouped into two plants each with 2 incinerator units
· The incineration process is raised to at least 850oC for
at least 2 seconds
Flue gas treatment system
· Selective non-catalytic reduction of NOx
· Multi-cyclone
· Dry reactor
· Bag filter
Seawater desalination plant
· Reverse osmosis technology
· 600 m3/day of potable and process water produced
Power generation system
· Two 14 MW Steam Turbine Generators

Back to top Back Table of Content Next