Press
Release
List
of environmental impact assessment studies released
The Environmental
Protection Department (EPD) today (April 30) released a list of
environmental impact assessment (EIA) reports for major development
projects approved between January 1, 2003 and March 31, 2003.
Statutory
EIA reports
- Lamma Power
Station Navigation Channel Improvement- EIA (The Hong Kong Electric
Company Limited)
- Proposed
Joint User Complex and Wholesale Fish Market at Area 44, Tuen
Mun- EIA (Architectural Services Department)
For non-statutory
studies, the environmental assessment (EA) for " Design and Cosntruction
of Drainage Works to Alleviate Flooding near Belvedere Garden in
Tsuen Wan" conducted by Drainage Services Department has been completed.
The reports
and executive summaries of approved statutory EIAs are available
at the following locations:
(a) |
Environmental
Impact Assessment Ordinance (EIAO) |
|
Register
Office, EPD, 27th floor, Southorn Centre, |
|
130 Hennessy
Road, Wan Chai; |
(b) |
Wan
Chai Environmental Resource Centre, |
|
221 Queen's
Road East, Wan Chai; |
(c) |
Tsuen Wan
Environmental Resource Centre, |
|
Tak Wah
Park, Tak Wah Street, Tsuen Wan; |
(d) |
Public
Enquiry Centre of relevant District Office(s); and |
(e) |
EIAO website
- http://www.epd.gov.hk/epd/eia. |
In addition,
a list of EIA study briefs issued under the EIAO and ongoing non-statutory
EA studies is also available at the EPD's EIAO Register Office and
environmental resource centres for public inspection.
They include:
I. Statutory
Studies
- Reclamation
of Sai Wan Typhoon Shelter and Associated Engineering Works at
Cheung Chau - EIA (Territory Development Department)
- Tung Chung
- Ngong Ping Cable Car Project - EIA (Territory Development Department)
- Remaining
Development in Tung Chung and Tai Ho - Comprehensive Feasibility
Study - EIA (Territory Development Department)
- Siu Ho Wan
Water Treatment Works Extension - EIA (Water Supplies Department)
- Road P1
Advance Works at Yam O on Lantau Island (Civil Engineering Department)
- Peng Chau
Helipad - EIA (Civil Engineering Department)
- Peng Chau
Sewage Treatment Works Upgrade - EIA (Drainage Services Department)
- New Contaminated
Mud Marine Disposal Facility at Airport East/East Sha Chau - EIA
(Civil Engineering Department)
- Drainage
Improvements in Southern Lantau - EIA (Drainage Services Department)
- Flyover
at Junction of Che Kung Miu Road/Hung Mui Kuk Road - EIA (Highways
Department)
- Proposed
Shuen Wan Landfill Golf Course - EIA (Home Affairs Bureau)
- Widening
of T6 Bridge, Sha Tin - EIA (Highways Department)
- Widening
of Tate's Cairn Highway between Shek Mun Interchange and T6 Interchange
- EIA (Highways Department)
- Tai Po Sewage
Treatment Works and Sewerage - EIA (Drainage Services Department)
- Planning
and Development Study on North East New Territories - EIA (Territory
Development Department)
- Drainage
Improvement in Sha Tin and Tai Po - EIA (Drainage Services Department)
- Cement Silos
Addition Work in Tai Po Cement Depot - EIA (K. Wah Materials Limited)
- Trunk Road
T4 in Sha Tin - EIA (Territory Development Department)
- Drainage
Improvement in the Northern New Territories - Package C - EIA
(Drainage Services Department)
- Tseung Kwan
O Development Contract No. TK 44/97: Dualling of Hang Hau Road
- EIA (Territory Development Department)
- Tseung Kwan
O Development Phase 3 - Road P2 connecting Town Centre and Western
Coast Road - EIA (Civil Engineering Department)
- Proposed
Extension of Public Golf Course of Kau Sai Chau, Sai Kung - EIA
(The Hong Kong Jockey Club)
- Sai Kung
Sewage Treatment Works, Phase II Upgrading - EIA (Drainage Services
Department)
- Drainage
Improvements in Sai Kung - EIA (Drainage Services Department)
- Road Widening
of Hing Wah Street - EIA (Highways Department)
- Drainage
Improvement in Tsuen Wan, Kwai Chung and Tsing Yi, Tsuen Wan Drainage
Tunnel - EIA (Drainage Services Department)
- Widening
of Yeung Uk Road between Tai Ho Road and Ma Tau Pa Road, Tsuen
Wan - EIA (Territory Development Department)
- Shatin to
Central Link - EIA (Kowloon-Canton Railway Corporation)
- Animal Cremator
- EIA (Environmental Protection Department)
- Route 10
(North Lantau to Yuen Long Highway) Northern Section - EIA (Highways
Department)
- Feasibility
Study of Waste-to-Energy Incineration Facilities - EIA (Environmental
Protection Department)
- Planning
and Development Study of Potential Housing Site near Area 1 (San
Wai Court), Tuen Mun - EIA (Territory Development Department)
- Planning
and Development Study on North West New Territories - EIA (Territory
Development Department)
- Upgrading
of Pillar Point Sewage Treatment Works - EIA (Drainage Services
Department)
- Recovery
Park in Tuen Mun Area 38 - EIA (Environmental Protection Department)
- Upgrading
and Expansion of San Wai Sewage Treatment Works and Expansion
of Ha Tsuen Pumping Station - EIA (Drainage Services Department)
- Lau Fau Shan
Development - Package 4 - EIA (Territory Development Department)
- Proposed
Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in DD123
- EIA (Mutual Luck Investment Limited)
- Yuen Long,
Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Package Stage
1 - EIA (Drainage Services Department)
- San Tin Western
Main Drainage Channel - EIA (Drainage Services Department)
- Yuen Long
and Kam Tin Sewerage and Sewage Disposal Stage 2 - EIA (Drainage
Services Department)
- Lau Fau Shan
Development - Remaining Engineering Works Phase 1 - Hang Hau Tsuen
Channel and Associated Works - EIA (Territory Development Department)
- Improvement
to San Tin Interchange - EIA (Highways Department)
- Proposed
Road A connecting Sin Fat Road and Cha Kwo Ling Road at Cha Kwo
Ling, Kwun Tong - EIA (Civil Engineering Department)
- Central Kowloon
Route - EIA (Highways Department)
- Kowloon Southern
Link - EIA (Kowloon Canton Railways Corporations)
- South East
Kowloon Development - Kai Tak Approach Channel Reclamation - EIA
(Territory Development Department)
- Distributor
Roads under Agreement No. CE 42/2000 South East Kowloon Development,
Infrastructure at North Apron Area of Kai Tak Airport, Design
and Construction - EIA (Territory Development Department)
- Reprovisioning
of Diamond Hill Crematorium - EIA (Architectural Services Department)
- Yung Shue
Wan Development, Engineering Works, Phase 2 - EIA (Civil Engineering
Department)
- Outlying
Island Sewerage Stage 1 Phase 2, Package J - Sok Kwu Wan Sewage
Collection, Treatment and Disposal (previously known as Outlying
Island Sewerage Stage 1 Phase 2 Sok Kwu Wan Sewage Treatment Works
and Submarine Outfall) - EIA (Drainage Services Department)
- Helipad at
Yung Shue Wan, Lamma Island - EIA (Civil Engineering Department)
- Investigation
and Preliminary Design of Route 7 - Section between Kennedy Town
and Aberdeen - EIA (Highways Department)
- North Hong
Kong Island Line - EIA (Mass Transit Railway Corporation)
- Drainage
Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel- EIA (Drainage Services Department)
- Western Harbour
Submarine Pipeline and Associated Stations - EIA (The Hong Kong
China Gas Company Limited)
- Aberdeen,
Ap Lei Chau and Pok Fu Lam Sewerage and Sewage Disposal Stage
II - EIA (Drainage Services Department)
- Proposed
Submarine Gas Pipelines from Cheng Tou Jiao Liquefied Natural
Gas Receiving Terminal, Shenzhen to Tai Po Gas Production Plant,
Hong Kong - EIA (The Hong Kong and China Gas Company Limited)
- Tsuen Wan
Road Upgrading - EIA (Territory Development Department)
II. Non-statutory
Studies
- Dualling
of Clear Water Bay Road between Tai Po Tsai and Hang Hau Road
(Highways Department)
- Stage II
Study on Review of Metroplan and the Related Kowloon Density Study
Review (Planning Department)
- Development
of an Integrated Arts, Cultural and Entertainment District of
at the West Kowloon Reclamation, Hong Kong (Housing, Planning
and Lands Bureau)
- Focus Study
on the Early Development of the Proposed Tourism Node Incorporating
a Cruise Terminal within the South East Kowloon Area (Territory
Development Department)
- Planning
and Engineering Feasibility Study for North of Pamela Youde Hospital,
Chai Wan (Civil Engineering Department)
- Feasibility
Study for Development at Cha Kwo Ling Kaolin Mine Site (Civil
Engineering Department)
- Urban Design
Study for the Planning and Development of South East Kowloon (Planning
Department)
- Sunnyville
Estate Development at Nam Sang Wai, Yuen Long - EA (Private Developer)
- Yuen Long,
Kam Tin Sewerage and Sewage Disposal Stage I, Package 1A-1T and
1B-1T Kam Tin Trunk Sewerage Phase I and II - EA (Drainage Services
Department)
- Yuen Long,
Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Package Stage
I - EA (Drainage Services Department)
- Extension
of Existing Landfills and Identification of Potential New Waste
Disposal Sites (Environmental Protection Department)
- Strategic
Environmental Assessment for Territory- wide Implementation Study
for Water-cooled Air conditioning Systems in Hong Kong (Electrical
and Mechanical Services Department)
- Strategic
Environmental Assessment for Hong Kong 2030: Planning Vision and
Strategy (Planning Department)
- Study on
the Long-term Arrangements to Accommodate Inert Construction and
Demolition Materials and Dredged Mud - Strategic Environmental
Assessment (Civil Engineering Department)
- Preliminary
Feasibility Study on Provision of Cycle Track and Related Development
Facilities between Tuen Mun and Tsuen Wan - EA (Territory Development
Department)
- Investigation
and Preliminary Design for Reconstruction and Improvement of Tuen
Mun Road - EA (Highways Department)
Information
related to the EIAO is also available at the EIAO website at http://www.epd.gov.hk/epd/eia.
End/Wednesday,
April 30, 2003 |