List of environmental impact assessments released

Press Release

List of environmental impact assessments released

The Environmental Protection Department today (April 11) released a list of completed and on-going statutory environmental impact assessment (EIA) and non-statutory environmental studies for major development projects between January 1, 2011 and March 31, 2011:-

Completed statutory EIA and non-statutory environmental studies:
-----------------------------------------------------------------------------------------------

A.   Statutory EIA:
     
1.   Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works  (Water Supplies Department)
 
2.   Shatin to Central Link Protection Works at Causeway Bay Typhoon Shelter (MTR Corporation Limited)
 
3.   Regulation of Shenzhen River Stage IV (Drainage Services Department)
 
4.   Liantang/Heung Yuen Wai Boundary Control Point and Associated Works (Civil Engineering and Development Department)
                            
The reports and executive summaries of the above-mentioned approved statutory EIA are now available at the following locations:-

*  EIA Ordinance Register Office, EPD, 27th floor, Southorn Centre, 130 Hennessy Road, Wan Chai;
*  EIA Ordinance website -
www.epd.gov.hk/eia

B.    Non-statutory Environmental Studies:

Ongoing statutory EIA and non-statutory environmental studies:
-------------------------------------------------------------------------------------------

A.   Statutory EIA:
     
1.   Kai Tak Development – Roads D3A & D4A (EIA Study Brief no. ESB-222/2011) (Civil Engineering and Development Department)
 
2.   Hung Shui Kiu New Development Area (EIA Study Brief no. ESB-221/2011) (Civil Engineering and Development Department)
 
3.   In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works - Design and Construction (EIA Study Brief no. ESB-220/2011) (Water Supplies Department)
 
4.   Tuen Mun Western Bypass (EIA Study Brief no. ESB-219/2011) (Highways Department)
 
5.   Modification of Hing Wah Street between Lai Chi Kok Road and Cheung Sha Wan Road for Two-Way Traffic (EIA Study Brief no. ESB-218/2010) (Highways Department)
 

6.   Harvest Biodiesel Plant Development (EIA Study Brief no. ESB-217/2010) (Harvest Investment Holdings Limited)
 
7.   Drainage Improvement in Northern New Territories – Package C (Remaining Works) (EIA Study Brief no. ESB-216/2010) (Drainage Services Department)
 
8.   Decommissioning, Reprovisioning, Construction and Operation of Affected Oil Depots at Southwest Tsing Yi (EIA Study Brief no. ESB-214/2010) (Civil Engineering and Development Department)
 

9.   Outlying Islands Sewerage Stage 2 – Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities (Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities) (EIA Study Brief no. ESB-212/2009) (Drainage Services Department)
 
10.  Outlying Islands Sewerage Stage 2 – Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities (Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities) (EIA Study Brief no. ESB-211/2009) (Drainage Services Department)
 
11.  Proposed Low-rise and Low-density Residential Development at Various Lots and their Adjoining Government Land in D.D. 104, East of Kam Pok Road, Mai Po, Yuen Long. New Territories (EIA Study Brief no. ESB-210/2009) (Glory Queen Limited)
 
12.  Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works (EIA Study Brief no. ESB-209/2009) (Drainage Services Department)
 
13.  Proposed Residential Development within "Recreation" ("REC") Zone at Various Lots in DD 104, Yuen Long, N.T. (EIA Study Brief no. ESB-207/2009) (Capital Chance Limited)
 
14.  Pilot Project for Public - Private Partnership Conservation Scheme, Sha Lo Tung Valley, Tai Po (EIA Study Brief no. ESB-206/2009) (Sha Lo Tung Development Company Limited)
 
15.  Central Police Station Compound Conservation and Revitalisation (EIA Study Brief no. ESB-205/2009) (The Hong Kong Jockey Club Charities Trust)
 
16.  Proposed Residential Development within "Residential (Group D)" Zone at Various Lots in DD 104, Yuen Long, N.T. (EIA Study Brief no. ESB-204/2009) (Capital Chance Limited)
 
17.  Trunk Road T2 (EIA Study Brief no. ESB-203/2009) (Civil Engineering and Development Department)
 
18.  Development of Lok Ma Chau Loop (EIA Study Brief no. ESB-201/2008) (Civil Engineering and Development Department)
 
19.  Cross Bay Link, Tseung Kwan O (EIA Study Brief no. ESB-196/2008) (Civil Engineering and Development Department)
 
20.  Tseung Kwan O – Lam Tin Tunnel and Associated Works (EIA Study Brief no. ESB-195/2008) (Civil Engineering and Development Department)
 
21.  Container Terminal 10 Development at Southwest Tsing Yi (EIA Study Brief no. ESB-194/2008) (Civil Engineering and Development Department)
 
22.  Shatin to Central Link - Cross Harbour Section (Phase II - Hung Hom to Admiralty) (EIA Study Brief no. ESB-193/2008) (MTR Corporation Limited)
 
23.  Shatin to Central Link - Cross Harbour Section (Phase I - Mong Kok East to Hung Hom) (EIA Study Brief no. ESB-192/2008) (MTR Corporation Limited)
 
24.  Shatin to Central Link – Tai Wai to Hung Hom Section (EIA Study Brief no. ESB-191/2008) (MTR Corporation Limited)
 
25.  Hung Shui Kiu New Development Area (EIA Study Brief no. ESB-190/2008) (Civil Engineering and Development Department)
 
26.  Sediment Removal at Sha Tau Kok Fish Culture Zone, Boat Shelter and Approach Channel (EIA Study Brief no. ESB-186/2008) (Civil Engineering and Development Department)
 
27.  Development of the Integrated Waste Management Facilities Phase 1 (EIA Study Brief no. ESB-184/2008) (Environmental Protection Department)
 
28.  Comprehensive Development and Wetland Protection near Yau Mei San Tsuen (EIA Study Brief no. ESB-182/2008) (Asia King Development Limited)
 
29.  Construction of Cycle Track and the associated Supporting Facilities from Nai Chung to Sai Kung Town (EIA Study Brief no. ESB-180/2008) (Civil Engineering and Development Department)
 
30.  Construction of Cycle Tracks and the associated Supporting Facilities at Nam Sang Wai, Yuen Long (EIA Study Brief no. ESB-179/2008) (Civil Engineering and Development Department)
 
31.  North East New Territories New Development Areas (EIA Study Brief no. ESB-176/2007) (Civil Engineering and Development Department)
 
32.  Tuen Mun Western Bypass (EIA Study Brief no. ESB-174/2007) (Highways Department)
 
33.  Flyover at Junction of Che Kung Miu Road and Hung Mui Kuk Road (EIA Study Brief no. ESB-173/2007) (Civil Engineering and Development Department)
 
34.  Pyrolysis Plant at Yuen Long Industrial Estate (EIA Study Brief no. ESB-165/2007) (Global Power and Energy Company Limited)
 
35.  Central Kowloon Route (EIA Study Brief no. ESB-156/2006) (Highways Department)   
 
36.  Widening of Gascoigne Road Flyover (EIA Study Brief no. ESB-155/2006) (Highways Department)   
 
37.  West Kowloon Reclamation
     Road D1A(S) and Road D1 - Between Jordan Road and Road D12
     Road D12 - Between Canton Road and Lin Cheung Road  (EIA Study Brief no. ESB-148/2006) (Civil Engineering and Development Department)
 
38.  West Kowloon Reclamation
     Road D1A(N) - Between Yan Cheung Road and Jordan Road (EIA Study Brief no. ESB-147/2006) (Civil Engineering and Development Department)   
 
39.  Proposed Helipad on Rooftop of the Proposed North Lantau Hospital at Yu Tung Road, Tung Chung, Lantau (EIA Study Brief no. ESB-143/2006) (Secretary for Food and Health)
 
40.  Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas (EIA Study Brief no. ESB-128/2005) (China Resources Petrochems (Group) Co. Ltd.)
 
41.  Lantau Logistics Park Development (EIA Study Brief no. ESB-121/2004) (Civil Engineering and Development Department)
 
42.  Extension of Kwai Chung Crematorium (EIA Study Brief no. ESB-108/2003) (Architectural Services Department)
 
43.  PWP Item No. 471CL (Part) - Lau Fau Shan Development, Remaining Engineering Works, Phase 1 - Hang Hau Tsuen Channel and Associated Works (EIA Study Brief no. ESB-090/2001) (Civil Engineering and Development Department)
 
44.  Aberdeen, Ap Lei Chau and Pok Fu Lam Sewerage - Stage 2 (EIA Study Brief no. ESB-080/2001) (Drainage Services Department)
 
45.  San Tin Western Main Drainage Channel (EIA Study Brief no. ESB-079/2001) (Drainage Services Department)
 
46.  Flyover and Adjoining Footbridge between Yuen Long On Ning Road and Kau Yuk Road (EIA Study Brief no. ESB-075/2001) (Highways Department)
 
47.  Western Harbour Submarine Gas Pipeline and Associated Stations (EIA Study Brief no. ESB-073/2001) (The Hong Kong China Gas Company Limited)
 
48.  Sai Kung Sewage Treatment Works, Phase II Upgrading (EIA Study Brief no. ESB-067/2001) (Drainage Services Department)
 
49.  Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau (EIA Study Brief no. ESB-051/2000) (Civil Engineering and Development Department)
 
50.  Widening of T6 Bridge, Sha Tin (EIA Study Brief no. ESB-020/1998) (Highways Department)
 
51.  Remaining Development in Tung Chung and Tai Ho - Comprehensive Feasibility Study (EIA Study Brief no. SB-035/BC) (Civil Engineering and Development Department)
 
52.  Widening of Tate's Cairn Highway between Shek Mun Interchange and T6 Interchange - Environmental Impact Assessment (EIA Study Brief no. SB-034/BC) (Highways Department)
 
53.  Tseung Kwan O Development Contract No. TK 44/97: Dualling of Hang Hau Road - Environmental Impact Assessment (EIA Study Brief no. SB-032/BC) (Civil Engineering and Development Department)
 
54.  Proposed Shuen Wan Landfill Golf Course (EIA Study Brief no. SB-011/BC) (Home Affairs Bureau)
 
55.  Lau Fau Shan Development - Package 4 (EIA Study Brief no. SB-010/BC) (Civil Engineering and Development Department)

Information related to the EIA Ordinance is also available at the EIA Ordinance website at
www.epd.gov.hk/eia

B.   Non-statutory Environmental Studies:
     
1.   Investigation and Preliminary Design for Reconstruction and Improvement of Tuen Mun Road (Highways Department)
 
2.   Sunnyville Estate Development at Nam Sang Wai, Yuen Long (Private Developer)
 
3.   Development of an Integrated Arts, Cultural and Entertainment District at the West Kowloon Reclamation, Hong Kong (Development Bureau)
 
4.   Restoration of the East Lamma Channel Marine Borrow Area (Civil Engineering and Development Department)
 
5.   Drainage Improvement in East Kowloon (Drainage Services Department)
 
6.   Engineering Strategy on Total Water Management for Hong Kong - Feasibility Study (Water Supplies Department)
 
7.   Further Study on Dualling of Hiram's Highway between Clear Water Bay Road and Marina Cove and Improvement to Local Access to Ho Chung (Highways Department)
 
8.   North District and Tolo Harbour Sewerage, Sewage Treatment and Disposal - Regional Sewerage Works, Part 1 - Sewerage Upgrade (Drainage Services Department)

Ends/Monday, April 11, 2011

 

 

Back to topTable of Content