• Tunneling and Pipe Installation
    Tunneling and Pipe Installation

Tunneling and pipe installation for underground utilities involve the use of various mechanical equipment. Quality Powered Mechanical Equipment (QPME) such as excavator, generator and mobile crane which emitted relatively less noise compared with non- QPME are widely available in the territory. Moreover, the employment of some quieter construction methods such as top-down construction method or pipe jacking can also reduce the construction noise generation.

Sound pressure level at 7 meters from equipment

 

Noise reduction for some mitigation measures for reference.

Noise reduction

 

Tunnel Boring Machine

With a large rotating metal cutter head, tunnel boring machine can pass through different type of soil, rock or soil-rock mixture. Tunnel boring machine is a multi-functional construction equipment which can excavate, remove excavated materials and install the precast segment immediately to make a permanent tunnel wall.  Unlike cut and cover method, construction work using a tunnel boring machine takes place mainly underground, which significantly reduce noise, dust and disruption to nearby NSRs.

 

 

Courtesy of MTR Corporation Limited