|
|
|
Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel) |
|
|
- Project Profile for application for permission to apply directly for Environmental Permit
- PP-441/2011 - Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel)
- Study Brief Issued or DEP's decision on permission to apply directly for permit
- DIR-212/2011 - Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel)
- EIA Report
- Current Environmental Permit Held
- EP-418/2011/A - Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel)
- EP-418/2011 - Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel)
|
|
|