Project
Title |
Permit
Holder |
|
Reprovisioning
of Diamond Hill Crematorium |
|
Architectural
Services Department |
|
Agreement
No. CE 67/2001 (GB), Landslide Mitigation Works against
Natural Terrain Hazards in Tung Wan and Shatin Heights -
Design and Construction, Tung Wan Landslide Mitigatin
Works |
|
Civil Engineering
and Development Department |
|
Central
Reclamation Phase III |
|
|
Construction
of Lung Kwu Chau Jetty |
|
|
(1) |
Decommissioning
of Cheoy Lee Shipyard at Penny's Bay |
(2) |
Construction and
operation of a thermal desorption plant at To Kau
Wan |
|
|
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
|
|
Demolition
of buildings and structures in the proposed Kennedy
Town Comprehensive Development Area Site
|
|
|
Demolition
of Kwai Chung Incineration Plant |
|
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak |
|
|
Expansion
and Extension of Fill Bank at Tuen Mun Area 38 |
|
|
Fill Bank at Tseung
Kwan O Area 137 |
|
|
Fill
Bank at Tuen Mun Area 38 |
|
|
Helipad at
Yung Shue Wan, Lamma Island |
|
|
Improvement Works to
Tung Ping Chau Public Pier |
|
|
Infrastructure
for Penny's Bay Development Contract 1 |
|
|
Infrastructure
for Penny's Bay Development, Contract 2
1. Water Recreation Centre at Penny's Bay (remaining
part)
2. Chok Ko Wan Link Road (remaining part)
3. Road P2 - Yam O to Penny's Bay |
|
|
|
Landslide
Mitigation Works at Pak Sha Wan and Tsing Shan Trail
above Area 19 - Design and Construction(Pak Sha Wan
Landslide Mitigation Works) |
|
|
Landslide Preventive Works at Po Shan, Mid-levels |
|
|
Main Drainage
Channels and Poldered Village Protection Schemes for San
Tin, NWNT Phase 3, Part 1 - Eastern Main Drainage Channel
for San Tin |
|
|
Penny Bay's
Reclamation |
|
|
Pok Wai
Drainage Channel |
|
|
Reconstruction
of Wong Shek Public Pier, Sai Kung North, Tai Po
|
|
|
Remaining
Engineering Infrastructure works for Pak Shek Kok Development
- Road D1 and Sewage Pumping Station No.1 |
|
|
Road D1
(Section from Road D4 to Road L654) |
|
|
Road D15
Linking Lok Shun Path and Tai Po Road |
|
|
Route 9
between Cheung Sha Wan and Sha Tin - Entrusted Portion
|
|
|
Sha Tin
New Town, Stage II Road T3 and associated Road Works
|
|
|
Tai O Sheltered
Boat Anchorage |
|
|
Trunk Road
T7 in Ma On Shan |
|
|
Tseung
Kwan O Development Contract F Grade Separated Interchange
|
|
|
Village Flood Protection
for Mai Po Lo Wai and Mai Po San Tsuen
|
|
|
Yuen Long
Bypass Floodway |
|
|
10
- Year Extended LPM Project, Phase 3, Package D
-Outlying Islands, Landslip Preventive Works on
Government Slopes and Related Studies - Investigation,
Design and Construction |
|
|
10-Year
Extended LPM Project, Phase 2, Package G - Outlying
Islands, Investigation, Design and Supervision of
Landslip Preventive Works on Government Slopes and
Related Studies |
|
|
10-Year
Extended LPM Project, Phase 2, Package G - Outlying
Islands Features in Sok Kwu Wan Lamma Island |
|
|
Wan Chai Development Phase II and Central-Wan Chai Bypass |
|
|
Drainage Improvement in Sai Kung |
|
Drainage Services
Department |
|
Drainage Improvements in Southern Lantau |
|
|
Expansion
of Shek Wu Hui Sewage Treatment Works |
|
|
Ngong Ping
Sewage Treatment Works and Sewerage |
|
|
Outlying
Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities |
|
|
Peng Chau
Sewage Treatment Works Upgrade |
|
|
Shenzhen River Regulation
Project Stage III |
|
|
Tai Po Sewage
Treatment Works Stage V |
|
|
Upgrading
of Siu Ho Wan Sewage Treatment Plant |
|
|
Upgrading of Ting Kok
Road Pumping Station No.5 |
|
|
Yuen Long
and Kam Tin Sewerage and Sewage Disposal Kam Tin Trunk
Sewerage Phase I and Au Tau Trunk Sewers |
|
|
Yuen Long, Kam Tin, Ngau
Tam Mei and Tin Shui Wai Drainage Improvement, Stage 1,
Phase 2B - Kam Tin Secondary Drainage Channels KT14 &
KT15 |
|
|
Low-level
Radioactive Waste Storage Facility |
|
Environmental
Protection Department |
|
Development of an EcoPark in Tuen Mun Area 38 |
|
|
Castle Peak Road Improvement
between Area 2 and Ka Loon Tsuen, Tsuen Wan, Construction
of Reclamation West of Tsing Lung Tau |
|
Highways Department |
|
Contract HY/99/18 Castle
Peak Road Improvement between Sham Tseng and Ka Loon
Tsuen, Tsuen Wan Construction of Reclamation and
Associated Seawall at Tsing Lung Tau |
|
|
Contract
HY/99/18 Castle Peak Road Improvement between Sham Tseng
and Ka Loon Tsuen, Tsuen Wan : Construction of
Reclamation and Associated Seawall at Sham Tseng West |
|
|
Contract HY/99/19 Castle
Peak Road Improvement between Ting Kau and Sham Tseng,
Construction of Reclamation and Associated Seawall at
Sham Tseng East |
|
|
Deep Bay
Link and Widening of Yuen Long Highway between Lam Tei
and Shap Pat Heung Interchange (Lam Tei to Tan Kwai Tseun
Section) (North Section) |
|
|
Deep Bay
Link and Widening of Yuen Long Highway between Lam Tei
and Shap Pat Heung Interchange (Lam Tei to Tan Kwai Tseun
Section) (South Section) |
|
|
Footbridge
and Improvements to Ap Lei Chau Bridge Road and Ap Lei
Chau Drive
|
|
|
Improvement
to Castle Peak Road between Ka Loon Tsuen and Siu Lam
|
|
|
Improvements to Island
Eastern Corridor Section between North Point Interchange
and Sai Wan Ho |
|
|
Improvements to San Tin
Interchange |
|
|
Improvement
to Tung Chung Road between Lung Tseng Tau and Cheung Sha
|
|
|
New Boundary
Bridge between Lok Ma Chau and Huanggang |
|
|
Operation
of Shenzhen Section of Shenzhen Bay Bridge |
|
|
Route 9
between Cheung Sha Wan and Sha Tin - Main Portion
|
|
|
Route
9 between Tsing Yi and Cheung Sha Wan |
|
|
Sai Sha Road Widening
between Kam Ying Road and Future Trunk Road T7 Junction
|
|
|
Shenzhen
Western Corridor and Part of Deep Bay Link |
|
|
Widening
of Fo Tan Road and Related Improvement Measures in Fo
Tan |
|
|
Widening of Tuen Mun Road at Tsing Tin Interchange |
|
|
Widening
of Yuen Long Highway between Lam Tei and Shap Pat Heung
Interchange |
|
|
The
Decommission of Underground Fuel Tanks at Tsuen Wan No.1
Pumping Station |
|
|
Wan Chai Development Phase II and Central-Wan Chai Bypass |
|
|
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun |
|
Water Supplies Department |
|
Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point" |
|
Secretary for Security of HKSAR |