EIA
Report Title |
ACE
Comments |
Pak
Shek Kok Development |
Endorsement
with conditions :
- The
condition of the marine mud and the impact on the
dredging and disposal of the mud should be kept within
established guidelines;
- All
mitigation measures in the report should be implemented.
|
Tsuen
Wan Bay Further Reclamation , Area 35, Tsuen Wan - Engineering,
Planning and Environmental Investigation |
Endorsement
with condition :
|
Kai
Tak Airport North Apron Decommissioning |
Endorsement
with conditions :
- The
project proponent should submit to the EIA Subcommittee
a report on the results of the pilot test on the effectiveness
of the "Soil Vapour Extraction" and "Air
Sparging" methods before starting the decontamination
work using the afore-said methods; and
-
The project proponent should submit to the EIA Subcommittee
a report on final soil quality of the contaminated
areas upon the completion of the remediation process
before starting the proposed housing development.
|
Yuen
Long Bypass Floodway - Feasibility Study |
Endorsement
without conditions |
Planning
and Engineering Feasibility Study for Development at Anderson
Road |
Endorsement
with condition :
-
The
proponent will implement the recommendation contained
in the report to plant 13.4 ha of woodland on soft
cut slopes using native species. A proposal including
details of the species mix, future long-term maintenance,
and timetable for implementation will be prepared
to the satisfaction of the Director of Agriculture
and Fisheries
|
EIA
for Dredging an Area of Kellett Bank for Reprovisioning
of Six Government Mooring Buoys |
Endorsement
without conditions |
Footbridge
and Improvements to Ap Lei Chau Bridge Road and Ap Lei
Chau Drive * |
No
comment from ACE during public inspection period. |
Planning
and Engineering Feasibility Study for Development near
Choi Wan Road and Jordan Valley |
Endorsement
with condition :
-
A
review on the Landfill Gas hazard assessment including
an additional investigation, particularly on the
fault lines, and rigorous monitoring programme should
be undertaken by the project proponent; and the
EIA Subcommittee should be consulted on the proposed
mitigation measures if problems were identified
during the investigation
|
1,800
MW Gas-fired Power Station in Lamma Extension |
Endorsement
with condition :
|
Infrastructure
Works for the Proposed Development at Telegraph Bay |
Endorsement
without conditions |
Tang
Lung Chau Dangerous Goods Anchorage - EIA |
Endorsement
without conditions |
Main
Drainage Channels and Poldered Village Protection Scheme
for San Tin, NWNT |
Endorsement
with condition :
|
Planning
and Development Study of Potential Housing Site in Area
54, Tuen Mun |
Endorsement
without conditions |
EIA
for Salisbury Road Underpass and Associated Road Improvement
Works including Middle Road Circulation System |
Endorsement
without conditions |
Essential
Public Infrastructure with Works Associated with West
Rail Stations in Yuen Long, Tin Shui Wai and Tuen Mun
Centre |
Endorsement
without conditions |
Feasibility
Study on Alternative Alignment for the Western Coast Road,
Tseung Kwan O* |
No
comment from ACE during public inspection period. |
Tseung
Kwan O Development, Contract F, Grade Separated Interchange
T1/P1/P2 * |
No
comment from ACE during public inspection period. |
Route
9 between Tsing Yi and Cheung Sha Wan |
Endorsement
without conditions. |
Sai
Sha Road Widening between Kam Yin Road and Proposed Road
T7 Junction |
Endorsement
without conditions. |
Widening
and Reconstruction of Tai Po Road (Sha Tin Section) *
|
No
comment from ACE during public inspection period |
Sha
Tin Sewage Treatment Works Stage III Extension |
Endorsement
without conditions |
Route
16 Investigation Assignment - Alternative Alignment Study
|
Endorsement
without conditions |
132kV
Overhead Po Lam Line and Underground Cable from the Existing
Po Lam Substation to the existing Tui Min Hoi Substation
- Circuit No. 2 * |
No
comment from ACE during public inspection period |
Hebe
Haven Yach Club Development - Phase 2 * |
No
comment from ACE during public inspection period |
Essential
Public Infrastructure Works - Yuen Long, Tin Shui Wai,
Tuen Mun Centre and the Eastern Access Road |
Endorsement
without conditions |
KCRC
- Tai Wai to Ma On Shan Extension |
Endorsement
with conditions
- The
noise impact would not be worse than the predictions
made in the report;
- The
proponent and its contractors would submit to the
Subcommittee detailed proposals on ways to further
minimize the construction noise impact as far as practicable
before commencing works at sections with possible
noise exceedances; and
-
The proponent to devise an enhanced environmental
monitoring and audit programme on the sites predicted
to be affected by possible construction noise exceedances.
|
Light
Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone
and Grade Separation of the LRT with Pui To Road and Tsing
Lun Road in Tuen Mun |
Endorsement
without conditions |
Tin
Shui Wai Phase 4 Rail Extension |
Endorsement
without conditions |
New
World First Bus Permanent Depot at Chai Wan* |
No
comment from ACE during public inspection period |
Route
10 - North Lantau to Yuen Long Highway Investigation and
Preliminary Design (Southern Section) |
Endorsement
with conditions :
- Construction
of the Southern section of Route 10 would not commence
until the EIA report of the Northern section was completed
and endorsed.
-
When the EIA report for the Northern section is submitted
under the EIA Ordinance, the cumulative environmental
impact of both the Southern and Northern sections
of Route 10 and all relevant findings and recommendations
in both EIA studies could be subject to review.
-
The findings of the design review study of the toll
plaza would be submitted to the Subcommittee once
finalized.
|
KCRC
- East Rail Extension - Hung Hom to Tsim Sha Tsui |
Endorsement
with conditions :
- Set
up a continuous noise monitoring mechanism at locations
to be decided in consultation with the Director of
Environmental Protection (DEP);
-
Make available to the public the results of the continuous
noise monitoring mechanism through the proponent's
website;
-
Activate remedial measures in the event that the noise
levels exceed the worst case scenario predicted in
the EIA report;
-
Carry out a monitoring programme on the result of
transplanting works; and
-
Provide a total of 1,500 trees upon completion of
the project.
|
Tuen
Mun Sewerage - Eastern Coastal Sewerage Extension |
Endorsement
with condition :
|
Shenzhen
River Regulation Project Stage III |
Endorsement
with conditions :
- A
2-year monitoring exercise would be conducted for
the operation stage of the project on its impact on
the sedimentation rate and particle size at the mouth
of Shenzhen River;
- A
study on the 'Dismantle of Lo Wu Railway Bridge' would
be conducted within at least 6 months before commencement
of the project, which should include detailed rules
on information recording and dismantle procedures,
dismantle programme, guidelines for preserving the
dismantled materials, location of re-erection, restoration
programme and detailed rules for restoration. The
Bridge should only be demolished after the dismantle
proposal is approved by the Hong Kong Antiquities
and Monuments Office and other relevant authorities;
- Benthic
monitoring would be conducted at the river mouth during
construction and operational phases of the project
until such time that the Ramsar monitoring is formally
started to take over the benthic monitoring; and
- The
scale of soil filling in Nam Hang Middle Valley as
indicated in the EIA report would be reduced by at
least 100,000m3.
|
Northshore
Lantau Development Feasibility Study |
Endorsement
with conditions :
-
Design and construct the relevant section of Chok
Ko Wan Link Road between Route 10 toll plaza and Pai
Tau Kwu on embankment and with the existing coastline
preserved, subject to the water quality issue being
resolved to the satisfaction of DEP and ACE being
further consulted on the final design; and
- Design
and build the proposed walking trails at least 50
metres away from Mong Tung Hang Stream
|
Construction
of an International Theme Park in Penny's Bay of North
Lantau and its Essential Associated Infrastructures |
Endorsement
with conditions :
-
Not commence any works on the site of the Cheoy Lee
Shipyard until a separate EIA for its decommissioning
is completed and an environmental permit issued by
DEP;
-
Carry out trail tests of firework displays at Penny's
Bay site prior to the opening of the International
Theme Park and provide the results of the trials tests
and associated air quality data to ACE for consultation;
-
After opening of the International Theme Park, monitor
air pollutants arising from the firework displays
and on the basis of such findings, work out appropriate
remedial measures, if needed, to the satisfaction
of DEP;
- Monitor
the occurrence of TBT, PAHs and PCB in the waters
of Penny's Bay before and during the initial phase
of dredging operations;
- Carry
out a three-year monitoring programme of the post-transplanting
by experienced botanist and a ten-year maintenance
programme of the woodland compensatory planting;
- Undertake
a three-year monitoring programme of the effectiveness
of the sloping seawall as an ecological mitigation
measure. If recolonization of the corals occurs at
a slow rate, the proponent should continue the monitoring
for another three years. If re-colonization does not
occur, the proponent should consider further mitigation
measures in conjunction with the Agriculture, Fisheries
and Conservation Department (AFCD);
- Deploy
at least 4,350m3 of artificial reefs at
site(s) to be decided by AFCD and work out effective
management arrangement in conjunction with AFCD; and
- Implement
appropriate measures to protect the pair of White-bellied
Sea Eagles; in the event of their abandoning the existing
nest, take all reasonable and practical measures to
protect the new nesting site. To carry out monitoring
of the White-bellied Sea Eagles throughout the construction
phase and during the first two years of the operational
phase of the International Theme Park.
|
Tai
O Sheltered Boat Anchorage |
Endorsement
without condition. |
Widening
of Tolo Highway/Fanling Highway between Island House |
Endorsement
with condition :
|
Sheung
Shui to Lok Ma Chau Spur Line |
ACE comments :
-
Certain parts of the EIA report particularly that
relating to ecological baseline information need to
be strengthened and updated; for example, there has
been no field survey on reptiles, amphibians, and
mammals and little information on the Black-faced
Spoonbill which is found in the Lok Ma Chau area.
The availability of such additional information may
have bearing on the selection of design and alignment,
and may even necessitate revision of the mitigation
measures proposed which should be target and species
specific.
- The
proponent acknowledged in their final submission to
ACE that the proposed central alignment had greater
ecological impact on Long Valley than any of the other
considered options. There is much concern that such
alignment would bring serious ecological impacts and
significant habitat fragmentation to Long Valley.
Some members feel that cutting into the centre of
Long Valley is not acceptable. They are not fully
convinced that the project proponent has exhausted
all possible alignment options and that the constraints
( e.g. the problem with the Shek Wu Sewage Treatment
Works) mentioned in the alternative alignments explored
are indeed insurmountable. To minimise the impact
on Long Valley, they would prefer an alignment either
running close to River Beas or to the north of the
River.
- Some
members are concerned about the lack of information
on benchmark functional value, both for the meanders
and for the existing Lok Ma Chau fishponds which are
proposed for compensation. In the case of the meanders,
the mitigation proposed to be carried out by Territory
Development Department has not yet been implemented;
there is therefore no way to measure the benchmark
value there. Given the lack of information on the
benchmark ecological value, some members therefore
prefer ecological compensation on a " like-for-like"
basis on terms of area.
- Some
members are not satisfied that the proponent has produced
sufficient evidence to demonstrate that the proposed
mitigation measures will work and can attain with
certainty the stated ecological functionality, noting
in particular information available overseas that
the failure rate of re-created wetland has been as
high as 50% to 73%. In view of this high failure rate
overseas and the lack of comparable experience in
Hong Kong, the proposed mitigation measures, which
allow for an error margin of only 20% are considered
insufficient. The project proponent has also failed
to provide adequate contingency or fallback plans
in the event of failure.
|
Cyberport
Development & associated Engineering Infrastructure |
Endorsement
without conditions. |
West
Kowloon Reclamation Contract No. WK 30- Remaining Roadworks
Stage 4, Links Road G & L* |
No
comment from ACE during public inspection period. |
Modification
to MTRC Tsim Sha Tsui Station |
Endorsement
without conditions. |
Improvement
to Castle Peaks Road between Ka Loon Tsuen and Siu Lam*
|
No
comment from ACE during public inspection period. |
Central
Reclamation Phase III |
Endorsement
with condition :
|
Lei
Yue Mun Road Underpass Modification at Junction with Yau
Tong Road and Associated Improvement Works - Feasibility
Study* |
No
comment from ACE during public inspection period. |
Central
- Wan Chai Bypass and Island Eastern Corridor Link |
Endorsement
with condition :
|
Wan
Chai Development Phase II |
Endorsement
with conditions :
- Trial
tests on the use of geosynthetic containers
and related handling mechanism should be undertaken
under the scrutiny of EPD and a report should
be made to the Council before implementation;
and
- The
EM&A programme of the project should be uploaded
on the Internet for public information.
|
Comprehensive
Feasibility Study for the Revised Scheme of South East
Kowloon Development |
Endorsement
without conditions but suggested relocation of the planned
schools away from trunk roads as far as possible. |
Proposed
Headquarters and Bus Maintenance Depot in Chai Wan |
Endorsement
with condition :
|
Tseung
Kwan O Roads D1,D8 And D10* |
No
comment from ACE during public inspection period. |
Demolition
of Kwai Chung Incineration Plant |
Endorsement
without conditions. |
Replacement
of Cremators at Fu Shan Crematorium, Shatin* |
No
comment from ACE during public inspection period. |
*
The EIA report for the project was not selected for its
presentation to the council |