TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.       INTRODUCTION

Background

Scope of Report

Project Organisation

Environmental Status in the Reporting Month

Summary of EM&A Requirements

2.       AIR QUALITY

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

3.       NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

4.       WATER QUALITY

5.       ENVIRONMENTAL SITE INSPECTION

Site Inspections

Review of Environmental Monitoring Procedures

Advice on Waste Management Status

Status Environmental Licences and Permits

Implementation Status of Environmental Mitigation Measures

Summary of Exceedances of Environmental Quality Performance Limit

Summary of Environmental Complaints, Notifications of Summons and Successful Prosecutions

6.       FUTURE KEY ISSUES

Key Issues for Coming Month

Environmental Monitoring and Audit Schedule for the Coming Months

7.       CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

List of Tables

 

Table 2.1           Air Quality Monitoring Equipment

Table 2.2           Air Quality Monitoring Parameters, Frequency and Duration

Table 2.3           Locations of Air Quality Monitoring Stations

Table 2.4           Summary of Impact 1-hour TSP Monitoring Results

Table 2.5           Summary of Impact 24-hour TSP Monitoring Results

Table 3.1           Noise Monitoring Equipment

Table 3.2           Noise Monitoring Parameters, Frequency and Duration

Table 3.3           Locations of Noise Monitoring Stations

Table 3.4           Summary of Impact Noise Monitoring Results during 07:00 – 19:00 on Normal Weekdays

Table 5.1           Summary of Waste Disposal in The Month

 

List of Figures

 

Figure 1.1         Project Organisation for Environmental Management

Figure 1.2          Layout of Work Site

Figure 1.2a        Layout of Work Site A

Figure 1.2b        Layout of Work Site B

Figure 1.2c        Layout of Work Site C

Figure 1.2d        Layout of Work Site D

Figure 1.2e        Layout of Work Site E

Figure 2.1  Locations of Air Quality Monitoring Stations

Figure 3.1  Locations of Construction Noise Monitoring Stations

Figure 4.1  Locations of Water Quality Monitoring Stations

Figure 5.1  Complaint Flow Diagram

 

Appendices

 

Appendix A       Key Contacts of Environmental Personnel

Appendix B       Construction Programme

Appendix C       Environmental Action and Limit Levels

Appendix D       Environmental Monitoring and Audit Schedules

Appendix E       Calibration Details

Appendix F        Air Quality Monitoring Results and Graphical Presentation

Appendix G       Noise Monitoring Results and Graphical Presentation

Appendix H       Summary of Weekly Environmental Site Inspection Observations

Appendix I Status of Environmental Permits/Licences

Appendix J        Implementation Schedule of Mitigation Measures

Appendix K       Event and Action Plans

Appendix L        Cumulative Statistics on Complaints, Notification of Summons and Successful Prosecutions and Complaint Log