IMPORTANT NOTE:

This EM&A Monthly Report Template provides protocol statements to be included for air quality / noise level / water quality impact monitoring, landscape & visual, and environmental site inspections.  All RED TEXT (including body text and headers) would be Project Specific and respective PMs MUST revise accordingly.  Instructions to update particular items are shown as hidden BLUE TEXT, all PMs should read and input to respective sections in the Report accordingly.  The Front Page (Cover) of this Template shall use the latest version in M:\Data\Template\Submission Checking Record.doc.

 

 

 

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.       INTRODUCTION. Error! Bookmark not defined.

Background. Error! Bookmark not defined.

Scope of Report Error! Bookmark not defined.

Project Organisation. Error! Bookmark not defined.

Environmental Status in the Reporting Month. Error! Bookmark not defined.

Summary of EM&A Requirements. Error! Bookmark not defined.

2.       AIR QUALITY. Error! Bookmark not defined.

Monitoring Requirements. Error! Bookmark not defined.

Monitoring Equipment Error! Bookmark not defined.

Monitoring Parameters, Frequency and Duration. Error! Bookmark not defined.

Monitoring Locations. Error! Bookmark not defined.

Monitoring Methodology. Error! Bookmark not defined.

Results and Observations. Error! Bookmark not defined.

3.       NOISE MONITORING.. Error! Bookmark not defined.

Monitoring Requirements. Error! Bookmark not defined.

Monitoring Equipment Error! Bookmark not defined.

Monitoring Parameters, Frequency and Duration. Error! Bookmark not defined.

Monitoring Locations. Error! Bookmark not defined.

Monitoring Methodology. Error! Bookmark not defined.

Results and Observations. Error! Bookmark not defined.

4.       WATER QUALITY. Error! Bookmark not defined.

5.       ENVIRONMENTAL SITE INSPECTION. Error! Bookmark not defined.

Site Inspections. Error! Bookmark not defined.

Review of Environmental Monitoring Procedures. Error! Bookmark not defined.

Advice on Waste Management Status. Error! Bookmark not defined.

Status Environmental Licences and Permits. Error! Bookmark not defined.

Implementation Status of Environmental Mitigation Measures. Error! Bookmark not defined.

Summary of Exceedances of Environmental Quality Performance Limit Error! Bookmark not defined.

Summary of Environmental Complaints, Notifications of Summons and Successful Prosecutions. Error! Bookmark not defined.

6.       FUTURE KEY ISSUES. Error! Bookmark not defined.

Key Issues for Coming Month. Error! Bookmark not defined.

Environmental Monitoring and Audit Schedule for the Coming Months. Error! Bookmark not defined.

7.       CONCLUSIONS AND RECOMMENDATIONS. Error! Bookmark not defined.

Conclusions. Error! Bookmark not defined.

Recommendations. Error! Bookmark not defined.

 


 

List of Tables

 

Table 2.1           Air Quality Monitoring Equipment Error! Bookmark not defined.

Table 2.2           Air Quality Monitoring Parameters, Frequency and Duration. Error! Bookmark not defined.

Table 2.3           Locations of Air Quality Monitoring Stations. Error! Bookmark not defined.

Table 2.4           Summary of Impact 1-hour TSP Monitoring Results. Error! Bookmark not defined.

Table 2.5           Summary of Impact 24-hour TSP Monitoring Results. Error! Bookmark not defined.

Table 3.1           Noise Monitoring Equipment Error! Bookmark not defined.

Table 3.2           Noise Monitoring Parameters, Frequency and Duration. Error! Bookmark not defined.

Table 3.3           Locations of Noise Monitoring Stations. Error! Bookmark not defined.

Table 3.4           Summary of Impact Noise Monitoring Results during 07:00 – 19:00 on Normal Weekdays. Error! Bookmark not defined.

Table 5.1           Summary of Waste Disposal in The Month. Error! Bookmark not defined.

 

List of Figures

 

Figure 1.1          Project Organisation for Environmental Management

Figure 1.2          Layout of Work Site

Figure 1.2a        Layout of Work Site A

Figure 1.2b        Layout of Work Site B

Figure 1.2c        Layout of Work Site C

Figure 1.2d        Layout of Work Site D

Figure 1.2e        Layout of Work Site E

Figure 2.1          Locations of Air Quality Monitoring Stations

Figure 3.1          Locations of Construction Noise Monitoring Stations

Figure 4.1          Locations of Water Quality Monitoring Stations

Figure 5.1          Complaint Flow Diagram

 

Appendices

 

Appendix A       Key Contacts of Environmental Personnel

Appendix B       Construction Programme

Appendix C       Environmental Action and Limit Levels

Appendix D       Environmental Monitoring and Audit Schedules

Appendix E       Calibration Details

Appendix F        Air Quality Monitoring Results and Graphical Presentation

Appendix G       Noise Monitoring Results and Graphical Presentation

Appendix H       Summary of Weekly Environmental Site Inspection Observations

Appendix I         Status of Environmental Permits/Licences

Appendix J        Implementation Schedule of Mitigation Measures

Appendix K       Event and Action Plans

Appendix L        Cumulative Statistics on Complaints, Notification of Summons and Successful Prosecutions and Complaint Log