TABLE OF CONTENTS
Environmental
Status in the Reporting Month
Monitoring Parameters, Frequency and Duration
Monitoring Parameters, Frequency and Duration
5. ENVIRONMENTAL
SITE INSPECTION
Review of
Environmental Monitoring Procedures
Advice on Waste
Management Status
Status
Environmental Licences and Permits
Implementation
Status of Environmental Mitigation Measures
Summary of
Exceedances of Environmental Quality Performance Limit
Summary of
Environmental Complaints, Notifications of Summons and Successful Prosecutions
Environmental
Monitoring and Audit Schedule for the Coming Months
7. CONCLUSIONS
AND RECOMMENDATIONS
List of Tables
Table 2.1 Air Quality
Monitoring Equipment
Table 2.2 Air
Quality Monitoring Parameters, Frequency and Duration
Table 2.3 Locations
of Air Quality Monitoring Stations
Table 2.4 Summary
of Impact 1-hour TSP Monitoring Results
Table 2.5 Summary
of Impact 24-hour TSP Monitoring Results
Table 3.1 Noise
Monitoring Equipment
Table 3.2 Noise
Monitoring Parameters, Frequency and Duration
Table 3.3 Locations
of Noise Monitoring Stations
Table 3.4 Summary
of Impact Noise Monitoring Results during 07:00 – 19:00 on Normal Weekdays
Table 5.1 Summary
of Waste Disposal in The Month
List of Figures
Figure 1.1 Project
Organisation for Environmental Management
Figure 1.2 Layout
of Work Site
Figure 1.2a Layout
of Work Site A
Figure 1.2b Layout
of Work Site B
Figure 1.2c Layout
of Work Site C
Figure 1.2d Layout
of Work Site D
Figure 1.2e Layout
of Work Site E
Figure 2.1 Locations
of Air Quality Monitoring Stations
Figure 3.1 Locations
of Construction Noise Monitoring Stations
Figure 5.1 Complaint
Flow Diagram
Appendices
Appendix A Key
Contacts of Environmental Personnel
Appendix B Construction
Programme
Appendix C Environmental
Action and Limit Levels
Appendix
D Environmental
Monitoring and Audit Schedules
Appendix E Calibration
Details
Appendix F Air
Quality Monitoring Results and Graphical Presentation
Appendix G Noise
Monitoring Results and Graphical Presentation
Appendix H Summary
of Weekly Environmental Site Inspection Observations
Appendix I Status
of Environmental Permits/Licences
Appendix J Implementation
Schedule of Mitigation Measures
Appendix K Event
and Action Plans