TABLE OF CONTENTS
Background
Scope
of Report
Project
Organisation
Environmental
Status in the Reporting Month
Summary
of EM&A Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results
and Observations
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results
and Observations
5. ENVIRONMENTAL
SITE INSPECTION
Site
Inspections
Review
of Environmental Monitoring Procedures
Advice
on Waste Management Status
Status
Environmental Licences and Permits
Implementation
Status of Environmental Mitigation Measures
Summary
of Exceedances of Environmental Quality Performance
Limit
Summary
of Environmental Complaints, Notifications of Summons and Successful
Prosecutions
Key
Issues for Coming Month
Environmental
Monitoring and Audit Schedule for the Coming Months
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table
2.1 Air
Quality Monitoring Equipment
Table
2.2 Air
Quality Monitoring Parameters, Frequency and Duration
Table
2.3 Locations
of Air Quality Monitoring Stations
Table
2.4 Summary
of Impact 1-hour TSP Monitoring Results
Table
2.5 Summary
of Impact 24-hour TSP Monitoring Results
Table
3.1 Noise
Monitoring Equipment
Table
3.2 Noise
Monitoring Parameters, Frequency and Duration
Table
3.3 Locations
of Noise Monitoring Stations
Table
3.4 Summary
of Impact Noise Monitoring Results during 07:00 – 19:00 on
Table
5.1 Summary
of Waste Disposal in The Month
List of Figures
Figure 1.1 Project
Organisation for Environmental Management
Figure 1.2 Layout
of Work Site
Figure 1.2a Layout
of Work Site A
Figure 1.2b Layout
of Work Site B
Figure 1.2c Layout
of Work Site C
Figure 1.2d Layout
of Work Site D
Figure 1.2e Layout
of Work Site E
Figure 2.1 Locations
of Air Quality Monitoring Stations
Figure 3.1 Locations
of Construction Noise Monitoring Stations
Figure 5.1 Complaint Flow
Diagram
Appendices
Appendix A Key
Contacts of Environmental Personnel
Appendix B Construction
Programme
Appendix C Environmental
Action and Limit Levels
Appendix
D Environmental
Monitoring and Audit Schedules
Appendix E Calibration
Details
Appendix F Air
Quality Monitoring Results and Graphical Presentation
Appendix G Noise
Monitoring Results and Graphical Presentation
Appendix H Summary
of Weekly Environmental Site Inspection Observations
Appendix I Status
of Environmental Permits/Licences
Appendix J Implementation
Schedule of Mitigation Measures
Appendix K Event
and Action Plans