Monthly EM&A Report

(May 2023)

 

 

 

 

 

 

 

 

 

Contract No.              :           DPW 01/2020

                       

Contract Name          :           Environmental Team for Drainage

Improvement Works at Ngong Ping

(Contract No. DC/2019/06)

                       

Report No.                 :           0118/20/ED/0595A

                       

EP No.                         :           EP-456/2013/B

 

 

 

 

 

 

 

 

 

 

 

 

Prepared by               :           Michelle Shum

                       

Reviewed by              :           Rex Chow

                       

                       

                                                                        _____________________________

Certified by                :           Calvin M.P. Leung

                                                                        Environmental Team Leader


 

Document Control

Document Information

Project Title

Drainage Improvement Works at Ngong Ping

Document Title

Monthly EM&A Report (May 2023)

Fugro Project No.

0118/20

Fugro Document No.

0118/20/ED/0595

Issue Number

1

Client Information

Client

Drainage Services Department

Client Address

45/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong

Client Contact

Mr. Dave Choi                                                                                                           

Document Status

01

Rev. 0

Michelle Shum

Rex Chow

Calvin M.P. Leung

12 June 2023

02

Rev. A

Michelle Shum

Rex Chow

Calvin M.P. Leung

14 June 2023

Issue

Document Status

Prepared by

Reviewed by

Certified by

Date

 

 

 

 


Contents

Document Control ii

Document Information  ii

Client Information  ii

Document Status  ii

Contents  1

Appendices  3

Figures  3

Executive Summary  1

1.     Introduction   2

1.1      Background  2

1.2      Project Organization and Management Structure  2

1.3      Construction Programme and Activities  2

1.4      Works Undertaken During the Month  3

1.5      Waste Management Status  3

2.     Environmental Status  4

3.     Summary of em&a requirements  5

3.1      Monitoring Parameters  5

3.2      Environmental Quality Performance Limits (Action and Limit Levels) 5

3.3      Event and Action Plans  5

3.4      Environmental Mitigation Measures as Recommended in the EIA Report 5

3.5      Environmental Requirements in Contract Documents  5

3.6      Site Inspection  6

3.7      Ecology  6

3.8      Landscape and Visual Impact 7

3.9      Cultural Heritage  7

3.10    Waste Management 8

4.     implementation status  9

5.     MONITORING RESULTS  9

5.1      Monitoring Methodology  9

5.2      Laboratory and Equipment Used and Calibration  10

5.3      Parameters, Monitoring Date, Time, Frequency and Duration  11

5.4      Monitoring Locations  12

5.5      Results and Observations  13

5.6      Comparisons of Monthly EM&A Data with the EIA Predictions  14

6.     Non-compliance, Complaints, Notification of Summons and Prosecution   15

6.1      Non-compliance (Exceedances) 15

6.2      Complaints Received  15

6.3      Notification of Summons and Successful Prosecution  15

7.     FUTURE KEY ISSUES  16

7.1      Construction Works for Next Three Month  16

7.2      Monitoring Schedules for Next Three Month  16

8.     Comments, recommendations and Conclusions  17

 


Appendices

Appendix A Project Organization and Management Structure

Appendix B1 Construction Programme

Appendix B2 Works undertaken Illustrations

Appendix B3 Proactive Environmental Protection or Control Measures for Next Three Month

Appendix B4 Waste Flow Table

Appendix C1 EP-456/2013/B Conditions

Appendix C2 Mitigation Measures Implementation (Construction Phase)

Appendix C3 Summary of Site Inspection

Appendix D Monitoring Parameters Action and Limit Levels

Appendix E Event and Action Plans

Appendix F1 Equipment Calibration Certificates (Noise Monitoring)

Appendix F2 Equipment Calibration Certificates (Water Quality Monitoring)

Appendix G Environmental Monitoring Schedules

Appendix H1 Noise Monitoring Data and Graphical Presentations

Appendix H2 Water Quality Monitoring Data and Graphical Presentations

Appendix I Statistics on Exceedances, Complaints, Notifications of Summons and Prosecutions Appendix J Weather Condition                                                                                          

Appendix I2 Investigation Report on Limit Level of Non-compliance                                                

Appendix J Weather Condition                                                                                                               

 

 

Figures

Figure 1 Project Location

Figure 2a Noise Monitoring Locations (Part 1)

Figure 2b Noise Monitoring Locations (Part 2)

Figure 2c Water Quality Monitoring Locations

[This is the bookmark for the end of the front matter.


Executive Summary

i.                   This is the 29th monthly EM&A Report which summaries the results and findings of the EM&A programme required for the Project from 1 May to 31 May 2023.

 

Breaches of Action and Limit Levels

Noise

ii.                   No Action or Limit Level Exceedance of monitoring was recorded in the reporting period.

 

Water Quality

iii.                   2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 25 May 2023 and 2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 27 May 2023. The exceedance cases on both 25 and 27 May was considered as project non-related. Exceedance summary and investigation report are shown in Section 6.1.2 and Appendix I2 respectively.

 

Complaint log

iv.                   No Complaint was recorded in the reporting period.

 

Notifications of Summons and Successful Prosecutions

v.                   No notifications of Summon and Successful Prosecution was recorded in the reporting period.

 

Reporting Change

vi.                   There was no reporting change required in the reporting period.

 

Future Key Issues

vii.                   During the next three month reporting period, the principal work activities within the site included:


Portion A

-      Receiving Pit excavation

-      TBM operation

 

Portion B

-      Excavation of box culvert

-      Launching pit excavation

-      TBM operation

 

viii.                   The ET will continue to implement the environmental monitoring & audit programme in accordance with the EM&A Manual and Environmental Permit requirements. The recommended environmental mitigation measures shall be implemented on site and regular inspections as required will be carried out to ensure that the environmental conditions are acceptable.


1.                    Introduction

1.1                     Background

1.1.1               To enhance the capacity of the trunk drainage system and reduce the flood risk in Ngong Ping, long term drainage improvement works are proposed to be implemented under ¡§PWP Item No. 4163CD ¡V Drainage Improvement Works at Ngong Ping¡¨ (hereafter referred to as ¡§the Project¡¨).

1.1.2               The Project is a designated project under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap.499). An Environmental Impact Assessment (EIA) Report together with an Environmental Monitoring and Audit (EM&A) Manual (hereafter referred to as the ¡§approved EM&A Manual¡¨) (Register No. AEIAR-169/2013 was prepared for the Project and approved by Environmental Protection Department (EPD) on 21 April 2013. A Variation of an Environmental Permit (Application No. VEP-599/2021) EP-456/2013/B was issued on 26 August 2021 and it is the current permit for the Project. These documents are available through the EIAO Register.

1.1.3               Fugro Technical Services Limited (FTS) has been appointed as the Environmental Team (ET) by Drainage Services Department (DSD) to implement the EM&A programme in accordance with the EP No. EP-456/2013/B and the approved EM&A Manual.

1.1.4               The construction phase and EM&A programme of the Project commenced on 2 January 2021.

1.1.5               This is the 29th monthly EM&A Report which summaries the results and findings of the EM&A programme required for the Project from 1 May to 31 May 2023.

1.2                   Project Organization and Management Structure

1.2.1               The environmental Project Organization and Management Structure is shown in Appendix A. The key personnel contact names and numbers are summarized in Table 1.1.

Table 1.1              Contact Information of Key Personnel

Party

Position

Name

Telephone

Drainage Services Department,

HKSAR (DSD)

Engineer

Mr. Dave Choi

2594 7348

Acuity Sustainability Consulting Limited (ASC)

IEC

Mr. F.C. Tsang

2698 8060

Contractor (Ming Hing)

Environmental Officer

Mr. Jason Wong

9744 2390

Fugro Technical Services Limited (FTS)

ET Leader

Mr. Calvin Leung

3565 4441

 

1.3                   Construction Programme and Activities

1.3.1               The construction phase of the Project under the EP commenced on 2 January 2021.

1.3.2               The construction programme of the Project is shown in Appendix B1.

 

1.4                   Works Undertaken During the Month

1.4.1               During this reporting period, the principal work activities within the site included:

Portion A

-      Receiving Pit excavation

-      TBM operation

 

Portion B

-      Excavation of box culvert

-      Launching pit excavation

-      TBM operation

 

1.4.2               Illustrations of works undertaken during the reporting period are shown in Appendix B2.

1.5                   Waste Management Status

1.5.1               The amount of wastes generated within the Project during the reporting period is shown in Appendix B4.

 


2.                    Environmental Status

EP No. EP-456/2013/B Conditions

2.1.1               Status of EP No. EP-456/2013/B Conditions are summarized in Appendix C1.

Mitigation Measures Implementation

2.1.2               Implementation of environmental mitigation measures are summarized in Appendix C2.

Environmental Licences, Notification and Permits

2.1.3               A summary of the relevant permits, licences and/or notifications on environmental protection for this Contract is presented in Table 2.1.

Table 2.1              Environmental Licences, Notification and Permits Summary

Permit / Notification / License

Ref No

Valid From

Valid Till

Environmental Permit

EP-456/2013/B

26/08/2021

N/A

Wastewater Discharge License

EP/RS0000458474

23/9/2022

30/9/2027

Notification pursuant to

Air Pollution (Construction Dust) Regulation

462432

01/12/2020

N/A

Billing Account

7038098

26/08/2020

N/A

Chemical Waste Producer

5213-941-M2935-04

05/05/2021

N/A

 

Project Area, Environmental Sensitive Receivers and Locations of Monitoring and Control Stations

2.1.4               Project location, Environmental sensitive receivers and locations of the monitoring and control stations are shown in Figure 1, 2a-2c.


3.                    Summary of em&a requirements

3.1                   Monitoring Parameters

3.1.1               Detailed of monitoring parameters are shown in Section 5.3.

3.2                  Environmental Quality Performance Limits (Action and Limit Levels)

3.2.1               The monitoring parameters action and limit levels are shown in Appendix D.

3.3                  Event and Action Plans

3.3.1               The Event and Action Plans are shown in Appendix E.

3.4                  Environmental Mitigation Measures as Recommended in the EIA Report

3.4.1               Implementation of environmental mitigation measures are summarized in Appendix C2.

3.5                  Environmental Requirements in Contract Documents

3.5.1               In order to ensure the works are in compliance with the contractual requirements, all method statements of major works should be submitted by the Contractor to the Engineer and the ET for vetting so as to ensure whether sufficient environmental protection and pollution control measures have been incorporated. Detailed ET¡¦s vetting contract documents in reporting period are summarized in Table 3.1:

Table 3.1              ET¡¦s vetting Contract Documents Summary

ET¡¦s vetting Contract Documents

Status

NIL

 

 


3.6                  Site Inspection

3.6.1               Site inspections should be conducted regularly to ensure that appropriate environmental protection and pollution control mitigation measures are properly implemented for the construction works activities associated with the drainage improvement works at Ngong Ping.

3.6.2               A summary of the ET¡¦s site inspection in the reporting period is presented in Table 3.2.

Table 3.2              Site Inspection Date Summary

Inspection Date

Weekly Site Inspection

02/05/2023

09/05/2023

16/05/2023

23/05/2023

30/05/2023

Landscape and Visual

02/05/2023

16/05/2023

30/05/2023

Cultural Heritage

23/05/2023

Post-transplantation Works

--

Floral Protection Measures

16/05/2023

3.6.3               Detailed site inspections summary is presented in Appendix C3.

3.7                  Ecology

3.7.1               The EIA has recommended that an EM&A for ecology is undertaken during the construction and operational / post-construction phases of the project. Certain construction phase mitigation measures and EM&A, such as surveys and subsequent transplantation of floral species would need to be undertaken in the pre-construction phase, or baseline phase of the works.

3.7.2               The construction phase ecological audit is concerned with checking the effectiveness of the implementation of the ecology transplantation/translocation and protection measures, together with auditing the effectiveness of the overall ecological site mitigation.

3.7.3               Refer to the EM&A Manual Table 5.2, the EM&A requirement in construction phase are summarized as below:

~ Weekly audit of Enhancement planting and construction run-off.

~ Monthly audit of the implementation of Floral Protection Plan.

~ Monthly audit of the transplanted species for the first 12 months after the transplantation.

~ Quarterly audit the transplanted species between months 12 to 24 after the transplantation.

3.7.4               A summary of the ET¡¦s site inspection in the reporting period is presented in Table 3.2 and the detailed site inspections is presented in Appendix C3.

3.7.5               To avoid uprooting and washing away of remaining transplanted floral species of conservation importance during adverse weather, preventive measure such as enhanced visual checking of the soil stability during advance notice of adverse weather conditions (i.e. Typhoon Signal Nos. 8 to 10 and Black, Red, and Yellow Rainstorm) is recommended.

3.7.6               Implementation of environmental mitigation measures are summarized in Appendix C2.

3.8                  Landscape and Visual Impact

3.8.1               The EIA has recommended that EM&A for landscape and visual resources is undertaken during the construction and operational phases of the project. The design, implementation and maintenance of landscape mitigation measures is a key aspect of this and should be checked to ensure that they are fully realised and that potential conflicts between the proposed landscape measures and any other project works and operational requirements are resolved at the earliest possible date and without compromise to the intention of the mitigation measures. In addition, the implementation of the mitigation measures recommended by the EIA will be monitored through the site audit programme.

3.8.2               Site inspections should be undertaken at least once every two weeks throughout the construction period and once every two months during the operational phase.

3.8.3               A summary of the ET¡¦s site inspection in the reporting period is presented in Table 3.2 and the detailed site inspections is presented in Appendix C3.

3.8.4               Implementation of environmental mitigation measures are summarized in Appendix C2.

3.9                  Cultural Heritage

3.9.1               The EIA has recommended that the EM&A for cultural heritage resources is undertaken during the construction phase of the project. Implementation of the mitigation measures recommended by the EIA will be monitored through the site audit programme.

3.9.2               All measures undertaken by the Contractor during the construction phase in the vicinity of the six heritage resources shall be audited by a qualified building surveyor, as a member of the Environmental Team (ET), on a monthly basis to ensure compliance with the intended aims of the recommended mitigation measures.

3.9.3               A summary of the ET¡¦s site inspection in the reporting period is presented in Table 3.2 and the detailed site inspections is presented in Appendix C3.

3.9.4               Crack monitoring devices was installed at NP-10 and NP-11.

3.9.5               Implementation of environmental mitigation measures are summarized in Appendix C2.

 

3.10               Waste Management

3.10.1            With the proper handling, storage and disposal of wastes arising from the construction works as recommended in the Environmental Mitigation Implementation Schedule in Appendix A of this EM&A Manual, the potential for adverse environmental impacts would be minimised. During site inspections, the Engineer and ET should pay special attention to the issues relating to the waste management and check whether the Contractor has implemented the recommended good site practices and other mitigation measures.

3.10.2            The amount of wastes generated within the Project during the reporting period is shown in Appendix B4.

3.10.3            A summary of the ET¡¦s site inspection in the reporting period is presented in Table 3.2 and the detailed site inspections is presented in Appendix C3.

3.10.4            Implementation of environmental mitigation measures are summarized in Appendix C2.


4.                    implementation status

4.1.1               The implementation status of environmental protection and pollution control/ mitigation measures as recommended in the EIA report/ EM&A Manual in the reporting period were updated and shown in Appendix C2.

 

5.                    MONITORING RESULTS

5.1                   Monitoring Methodology

Noise

5.1.1               The monitoring methodology and the QA/QC procedures are as follows:

¡P      The monitoring station will set at a point 1m from the exterior of the sensitive receivers building façade and set at a position 1.2m above the ground. 

¡P      The battery condition will check to ensure good functioning of the meter.

¡P      Parameters such as frequency weighting, the time weighting and the measurement time will set as follows:

¡±     frequency weighting : A

¡±     time weighting : Fast

¡±     measurement time : continue 5 minutes interval

¡P      Prior to and after noise measurement, the meter will be calibrated using the calibrator for 94.0 dB at 1000 Hz. If the difference in the calibration level before and after measurement is more than 1.0 dB, the measurement will be considered invalid and repeat of noise measurement is required after re-calibration or repair of the equipment.

¡P      The wind speed at the monitoring station will check with the portable wind meter. Noise monitoring shall be cancelled in the presence of fog, rain, and wind with a steady speed exceeding 5 m/s, or wind with gusts exceeding 10 m/s.

¡P      Noise measurement shall be paused during periods of high intrusive noise if possible and observation shall be recorded when intrusive noise is not avoided.

¡P      The supplementary information for data auditing and statistical results (e.g. L10 and L90), shall be obtained for reference.

 

Maintenance / Calibration

¡P      The microphone head of the sound level meter and calibrator should be cleaned with a soft cloth at quarterly intervals.

¡P      The sound level meter and calibrator should be calibrated annually by a HOKLAS laboratory or the manufacturer.

 

5.1.2               The weather conditions during the reporting period are shown in Appendix J.


Water Quality

5.1.3               In accordance with the recommendations of the EIA, construction phase water quality EM&A is required. Water quality parameters comprising: (i) suspended solids (SS); (ii) turbidity in Nephelometric Turbidity Units (NTU); (iii) dissolved oxygen (DO) in mg/L; and (iv) pH, shall be measured by the Environmental Team (ET) at locations which are within the potential influence of construction works at least three times per week to ensure that any deteriorating water quality could be readily detected and timely action be taken to rectify the situation. The first parameter, SS, shall be determined in the laboratory, with the other parameters measured in-situ using direct reading instrumentation.

5.1.4               In association with the water quality parameter measurements, relevant data shall also be measured, including the monitoring location/position, time, water depth, water temperature, salinity, DO saturation, weather conditions if appropriate, and any special phenomena and work underway at the construction site.

5.1.5               Only one sampling depth will be required for the streams, which shall be collected at mid depth. Replicates (2 samples) in-situ from each independent sampling event are required for all parameters to ensure a robust statistically interpretable data set. 

5.1.6               In addition, duplicated water samples for suspended solid analysis shall be collected at all the above stations and delivered to the HOKLAS accredited laboratory for analysis. Results for suspended solids shall be received back from the laboratory within 24hour of the receipt of the samples.

5.1.7               The Impact Monitoring shall be taken at the designated monitoring stations when construction works in the relevant Works Sections, designated working area (WA) and stockpiling area (SA) is ongoing. The monitoring shall be conducted at least 3 times a week and the interval between two sets of monitoring shall not be less than 36 hours. The parameters to be monitored, the monitoring procedures and equipment shall be the same as the Baseline Monitoring. The Impact Monitoring at a particular Works Section shall not be ceased with the ER, IEC and EPD agreement.

5.1.8               The weather conditions during the reporting period are shown in Appendix J.

5.2                  Laboratory and Equipment Used and Calibration

Noise

5.2.1               Table 5.1a summarizes the noise monitoring equipment model used for this project.

Table 5.1a            Noise Monitoring Equipment

Manufacturer/ Brand

Model

Equipment

Quantity

Casella

CEL-63X Series

Sound Level Meter

3

CEL-120/1

Sound Calibrator

3

5.2.2               Relevant calibration certificates are provided in Appendix F1.

Water Quality

5.2.3               Analysis of suspended solids was carried out in HOKLAS environmental testing laboratory (Registration No.: HOKLAS 015) to this parameter.

5.2.4               Table 5.1b summarizes the water quality monitoring equipment model used for this project.

Table 5.1b            Water Quality Monitoring Equipment

Manufacturer/ Brand

Model

Equipment

Quantity

In-Situ

YSI EXO-3

Multi-parameter Water Quality Meter

1

5.2.5               Relevant calibration certificates are provided in Appendix F2.

 

5.3                  Parameters, Monitoring Date, Time, Frequency and Duration

Noise

5.3.1               Table 5.2 presents the noise monitoring parameters, frequencies and period.

Table 5.2              Monitoring Parameters and Frequencies of Noise Monitoring

Parameter

Frequency and Period

LAeq (30 min) in normal weekdays and

 (L10 and L90 will be recorded for reference)

0700-1900 on normal weekdays at a frequency of once a week

5.3.2               The schedule of noise monitoring in reporting period is provided in Appendix G.

Water Quality

5.3.3               In accordance with the recommendations of the EIA, water quality parameters comprising: (i) suspended solids (SS); (ii) turbidity in Nephelometric Turbidity Units (NTU); (iii) dissolved oxygen (DO) in mg/L; and (iv) pH, shall be measured by the Environmental Team (ET).

5.3.4               In association with the water quality parameter measurements, relevant data shall also be measured, including the monitoring location/position, time, water depth, water temperature, salinity, DO saturation, weather conditions if appropriate, and any special phenomena and work underway at the construction site.

5.3.5               The Impact Monitoring shall be taken at the designated monitoring stations when construction works in the relevant Works Sections, designated working area (WA) and stockpiling area (SA) is ongoing. The monitoring shall be conducted at least 3 times a week and the interval between two sets of monitoring shall not be less than 36 hours. The parameters to be monitored, the monitoring procedures and equipment shall be the same as the Baseline Monitoring. The Impact Monitoring at a particular Works Section shall not be ceased with the ER, IEC and EPD agreement.

5.3.6               The schedule of water quality monitoring in reporting period is provided in Appendix G.


5.4                  Monitoring Locations

Noise

5.4.1               The noise monitoring locations are summarised in Table 5.3 and shown in Figure 2a-2b.

Table 5.3 Noise Monitoring Locations and Type of Measurement

NSRs*

Monitoring Location

Type of Measurement#

NSR1

Columbarium of Po Lin Monastery

Free-field

NSR5

Village House No. 49A

Free-field

NSR8

Village House No. 34

Façade

* NSRs: Noise Sensitive Receivers
#For Free-field measurement, +3dB(A) should be added to the measured results.

 

Water Quality

5.4.2               The water quality monitoring locations are shown in Table 5.4 and Figure 2c.  

Table 5.4 Water Quality Monitoring Locations

Station

Type

Easting

Northing

Relevant Works Section*

Remark

WS1-R1

Upstream reference

808664

813130

WS1/SA1

R2 in EIA

WS1-I1

Downstream impact

808535

813094

WS1/SA1

 

WS1-R2

Upstream reference

808524

813134

WS1

W2 in EIA

WS1-I2

Downstream impact

808528

813101

WS1

 

WS4-R3

Upstream reference

808214

813003

WS4/SA2

 

WS4-I3

Downstream impact

808196

813042

WS4/SA2

 

WS5-R4

Upstream reference

808096

813076

WS5/SA3

 

WS5-I4

Downstream impact

808055

813115

WS5/SA3

 

WS6-R5

Upstream reference

807983

813158

WS6/WA3

 

WS6-I5

Downstream impact

807919

813155

WS6/WA3

 

WS6-C1

Intermediate Control

807813

813214

WS6/SA4

W8 in EIA

WS6-R6

Upstream reference

807727

813249

WS6/WA4

 

WS6-I6

Downstream impact

807762

813285

WS6/WA4

W9 in EIA

* Please refer to Figures 2.9a-2.9g of the EIA Report for the relevant Works Section (WS), and/or designated works area (WA) and stockpiling area (SA).

 


5.5                  Results and Observations

Noise

5.5.1               The monitoring data are summarized in Table 5.5. Detailed monitoring data and graphical presentations are shown in Appendix H1.

Table 5.5 Summary of Noise Monitoring Results

NSR

Monitoring Results

(Range)(2)(3)

Action Level

Limit Level(1)

NSR1

Columbarium of Po Lin Monastery

61.4

-

65.3

dB(A)

When one documented complaint is received.

70 dB(A)

NSR5

Village House No. 49A

49.4

-

65.4

dB(A)

75 dB(A)

NSR8

Village House No. 34

52.2

-

57.1

dB(A)

75 dB(A)

Note:

(1)   75 dB(A) for residential premises and 70 dB(A) for educational institutions, kindergartens, nurseries and all others where voice communication.

(2)   Leq(30min) in dB(A), 0700-1900 hrs in normal weekdays.

(3)   Free-field correction applied at NSR1 & NSR5.

 

              Water Quality

5.5.2               The monitoring data are summarized in Table 5.6. Detailed monitoring data and graphical presentations are shown in Appendix H2.

Table 5.6 Summary of Water Quality Monitoring Results

Parameter(s)

 

 

Station(s)

DO in mg/L

Turbidity in NTU

pH

Suspended Solids in mg/L

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

WS1-R1

7.82

-

7.82

(

7.82

)

6.60

-

6.60

(

6.60

)

7.00

-

7.00

(

7.00

)

8.50

-

8.50

(

8.50

)

WS1-I1

7.39

-

8.86

(

8.12

)

1.00

-

6.90

(

3.13

)

6.80

-

7.00

(

6.90

)

1.00

-

13.50

(

4.36

)

WS1-R2

7.22

-

8.67

(

7.89

)

0.75

-

9.70

(

3.38

)

6.70

-

7.00

(

6.86

)

1.00

-

15.00

(

6.04

)

WS1-I2

7.51

-

7.51

(

7.51

)

6.40

-

6.40

(

6.40

)

7.10

-

7.10

(

7.10

)

5.00

-

5.00

(

5.00

)

WS4-R3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WS4-I3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WS5-R4

6.76

-

7.71

(

7.14

)

1.80

-

20.50

(

9.80

)

7.00

-

7.10

(

7.07

)

1.00

-

24.00

(

6.64

)

WS5-I4

6.75

-

7.25

(

6.88

)

5.90

-

22.60

(

15.03

)

7.00

-

7.20

(

7.13

)

2.00

-

145.00

(

56.63

)

WS6-R5

6.40

-

6.40

(

6.40

)

10.30

-

10.30

(

10.30

)

7.00

-

7.00

(

7.00

)

21.50

-

21.50

(

21.50

)

WS6-I5

6.32

-

7.44

(

6.75

)

1.30

-

12.30

(

6.58

)

6.90

-

7.10

(

6.98

)

2.00

-

135.00

(

38.60

)

WS6-C1

4.00

-

7.30

(

6.21

)

0.10

-

37.30

(

4.33

)

6.10

-

7.60

(

6.82

)

1.00

-

16.50

(

2.65

)

WS6-R6

6.50

-

7.90

(

7.08

)

1.00

-

19.90

(

5.13

)

6.90

-

7.20

(

7.01

)

1.00

-

42.50

(

8.64

)

WS6-I6

6.60

-

7.80

(

7.11

)

1.00

-

20.50

(

5.31

)

6.90

-

7.20

(

7.03

)

1.00

-

40.00

(

6.18

)

 

Remark:

1)     Monitoring location dried up and detailed refer to Appendix H2.

 

 


Other factor influencing the monitoring results

Noise

5.5.3               There were no other noticeable external factors generally affecting the monitoring results in this reporting period.

Water Quality

5.5.4               The monitoring results may influence by the vicinity of the monitoring station or changes in the ambient conditions (e.g. rainstorms in the wet season).

5.6                  Comparisons of Monthly EM&A Data with the EIA Predictions

Noise

5.6.1               The EM&A data was compared with the EIA predictions as summarized in Tables 5.7.

Table 5.7 Comparison of Noise Monitoring Data with EIA Predictions

NSR

Predicted Mitigated Construction Noise Levels (1)

Monitoring Results

(Range)

NSR1

Columbarium of Po Lin Monastery

55 - 70

dB(A)

61.4

-

65.3

dB(A)

NSR5

Village House No. 49A

48 - 86

dB(A)

49.4

-

65.4

dB(A)

NSR8

Village House No. 34

51 - 73

dB(A)

52.2

-

57.1

dB(A)

Note

(1)    Predicted Mitigated Construction Noise Levels refer to EIA Report Table 4.11.

5.6.2               The monitoring results in the reporting period in NSR1, NSR5 and NSR8 were within or below the ranges of the predicted mitigated construction noise levels in the EIA Report.

 

Water Quality

5.6.3               As no water quality prediction in EIA report, the ET will continue to implement the environmental monitoring & audit programme in accordance with the EM&A Manual and Environmental Permit requirements. The recommended environmental mitigation measures shall be implemented on site and regular inspections as required will be carried out to ensure that the environmental conditions are acceptable.

 

 


6.                    Non-compliance, Complaints, Notification of Summons and Prosecution

6.1                   Non-compliance (Exceedances)

Noise

6.1.1               No Action or Limit Level Exceedance of monitoring was recorded in the reporting period.

Water Quality

6.1.2               2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 25 May 2023 and 2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 27 May 2023. The possible reason for reaching the limited level included the heavy rainfall recorded before the sampling day and stagnant water. Hence, dirt and soil were flushed down the stream and trapped at the sampling point. Also, according to the Contractor, no construction works and water discharge which might cause pollution of the stream was conducted near WS5-I4 on the sampling days. For WS6-I5, only backfilling works with type B rock material and removal of ELS were carried out, no dusty material handling, dust-generating construction work nor water discharge which might cause pollution of the stream was conducted at WS6-I5 on the sampling days. Hence, this exceedance is concluded as project non-related. The investigation report are shown in Appendix I2.

6.2                  Complaints Received

6.2.1               No complaints, were received in the reporting period.

6.3                  Notification of Summons and Successful Prosecution

6.3.1               No notification of summons or successful prosecutions were received in the reporting period.

6.3.2               The Cumulative exceedances, complaint log, notification of summons and successful prosecutions are presented in Appendix I.

 


7.                    FUTURE KEY ISSUES

7.1                    Construction Works for Next Three Month

7.1.1               During the next three month reporting period, the principal work activities within the site included:

Portion A

-      Receiving Pit excavation

-      TBM operation

 

Portion B

-      Excavation of box culvert

-      Launching pit excavation

-      TBM operation

 

7.1.2               The anticipated impact of principal work activities within the site and the recommended mitigation measures are shown in Appendix B3.

7.2                  Monitoring Schedules for Next Three Month

7.2.1               The tentative schedules for environmental monitoring for next three month are provided in Appendix G.


8.                    Comments, recommendations and Conclusions

Effectiveness and Efficiency of Mitigation Measures

8.1.1               The regularly site inspections and environmental impact monitoring ensured that all the environmental mitigation measures recommended in EM&A Manual were effectively implemented. Despite the deficiencies found during site audits, the Contractor had taken appropriate actions to rectify deficiencies within a reasonable timeframe, and no exceedance related to the project was observed. Therefore, the effectiveness and efficiency of the mitigation measures were considered satisfactory for most of the time.

Improvement in the EM&A Programme

8.1.2               The EM&A programme was considered successfully and adequately conducted in the reporting period.

Conclusions

8.1.3               This is the 29th monthly EM&A Report which summaries the results and findings of the EM&A programme required for the Project from 1 May to 31 May 2023.

Noise

8.1.4               No Action or Limit Level Exceedance of monitoring was recorded in the reporting period.

Water Quality

8.1.5               2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 25 May 2023 and 2 Limit Level Exceedance of Total Suspended solid was recorded at WS5-I4 and WS6-I5 on 27 May 2023. The exceedance cases on both 25 and 27 May was considered as project non-related. Exceedance summary and investigation report are shown in Section 6.1.2 and Appendix I2 respectively.

Complaint, Notifications of Summons and Successful Prosecutions

8.1.6               No complaints were received in the reporting period.

8.1.7               No notification of summons or successful prosecutions were received in the reporting period.

8.1.8               There was no reporting change required in the reporting period.

8.1.9               Potential environmental impacts due to the construction activities will be monitored or reviewed. The ET will continue to implement the environmental monitoring & audit programme in accordance with the EM&A Manual and Environmental Permit requirements. The recommended environmental mitigation measures shall be implemented on site and regular inspections as required will be carried out to ensure that the environmental conditions are acceptable.

 



Figure 1 Project Location

 


Figure 2a Noise Monitoring Locations (Part 1)



Figure 2b Noise Monitoring Locations (Part 2)


 

 


NSRs*

Monitoring Location

Type of Measurement#

NSR1

Columbarium of Po Lin Monastery

Free-field

NSR5

Village House No. 49A

Free-field

NSR8

Village House No. 34

Façade

* NSRs: Noise Sensitive Receivers
# For Free-field measurement, +3dB(A) should be added to the measured results.

 


Figure 2c Water Quality Monitoring Locations


 


Station

Type

WS1-R1

Upstream reference

WS1-I1

Downstream impact

WS1-R2

Upstream reference

WS1-I2

Downstream impact

WS4-R3

Upstream reference

WS4-I3

Downstream impact

WS5-R4

Upstream reference

WS5-I4

Downstream impact

WS6-R5

Upstream reference

WS6-I5

Downstream impact

WS6-C1

Intermediate Control

WS6-R6

Upstream reference

WS6-I6

Downstream impact

 

 


Appendix A Project Organization and Management Structure

 

 

 

 


Note: Detailed key personnel contact names and telephone numbers refer to Table 1.1.  


Appendix B1 Construction Programme


Appendix B2 Works Undertaken Illustrations

Portion A

Portion B

- TBM operation (L305A)

- Excavation Works (Bay 9)

Portion C

 

 

- Excavation Works (Intake No.1)

 


 

Appendix B3 Proactive Environmental Protection or Control Measures for Next Three Month

 

Activity

Impact

Excavation of Trench or Pit

Pipe Lining

Installation of Drainage Pipe

Box culvert

TBM

Control Measures

Air Pollution Nuisance

− Use of regular watering to reduce dust emissions

− Open stockpiles shall be avoided or covered.

Noise Nuisance

 

− Use of quieter plant (QPME)

− Use suitable acoustic enclosure.

− Installation of a fixed noise barrier.

Water Nuisance

 

 

− Intercept the surface runoff by sand bag or etc.

− Treat the wastewater before discharge.

Waste Nuisance

 

 

− The site and surroundings shall be kept tidy and litter free.

− General refuse arising on-site should be stored in enclosed bins separately from C&D and chemical wastes

− Recycle as many C&D materials as possible on-site

Ecology

 

− avoid damage and disturbance to the remaining and surrounding natural habitat

− construction activities should be restricted to the proposed works boundary

 

Moreover, the ET will continue to implement the environmental monitoring & audit programme in accordance with the EM&A Manual and Environmental Permit requirements. The recommended environmental mitigation measures shall be implemented on site and regular inspections as required will be carried out to ensure that the environmental conditions are acceptable.


Appendix B4 Waste Flow Table

 


Appendix C1 EP-456/2013/B Conditions

 

Summary Table for Status of Compliance / Required Submission

EP Conditions

Submission(s)

Submission Date

Approval Status

2.6

Landscape Plan (Rev. G)

02/03/2021

Approved on

23/03/2021

2.7

Landscape as-built drawing(s)

At least one month before the Project commences operation

*

2.8

Updated Baseline Vegetation Survey Report (Rev. E)

19/02/2021

*

Floral Protection Plan (Rev. J)

04/04/2021

*

Floral Transplantation Plan (Rev. E)

11/12/2020

*

2.10

Aquatic Fauna Translocation Plan (Rev. H)

24/12/2020

*

2.11

Aquatic Fauna Translocation

Survey Report (Rev. B)

02/03/2021

*

4.3

Noise Baseline Monitoring Report (Rev. A)

30/10/2020

*

Water Quality Baseline Monitoring Report (Rev. D)

29/01/2021

*

4.4

Monthly EM&A Report (April 2023)

09/05/2023

*

Remarks: * Approval not required in EP-456/2013/B


Appendix C2 Mitigation Measures Implementation (Construction Phase)

Environmental Protection Measures (Construction Phase) (1)

Status

A) Air Quality

--

Watering once per hour for 12 hours a day at exposed soil in all active works areas and paved haul roads to reduce dust emissions by 91.7%. The amount of water to be applied would be 0.25L/m2 for the respective watering frequency.

^

Dust suppression measures stipulated in the Air Pollution Control (Construction Dust) Regulation and good site practices:

--

¡½   Use of regular watering to reduce dust emissions from exposed site surfaces and unpaved roads, particularly during dry weather;

^

¡½   Use of frequent watering for particularly dusty construction areas and areas close to ASRs;

^

¡½   Side enclosure and covering of any aggregate or dusty material storage piles to reduce emissions. Where this is not practicable owing to frequent usage, watering shall be applied to aggregate fines;

^

¡½   Open stockpiles shall be avoided or covered. Prevent placing dusty material storage piles near ASRs;

^

¡½   Tarpaulin covering of all dusty vehicle loads transported to, from and between site locations;

^

¡½   Establishment and use of vehicle wheel and body washing facilities at the exit points of the site;

^

¡½   Imposition of speed controls for vehicles on unpaved site roads, 8 km per hour is the recommended limit;

^

¡½   Routing of vehicles and position of construction plant should be at the maximum possible distance from ASRs;

^

¡½   Every stock of more than 20 bags of cement or dry pulverised fuel ash (PFA) should be covered entirely by impervious sheeting or placed in an area sheltered on the top and the 3 sides;

^

¡½   Cement or dry PFA delivered in bulk should be stored in a closed silo fitted with an audible high level alarm which is interlocked with the material filling line and no overfilling is allowed; and

¡½   Loading, unloading, transfer, handling or storage of bulk cement or dry PFA should be carried out in a totally enclosed system or facility, and any vent or exhaust should be fitted with an effective fabric filter or equivalent air pollution control system.

N/A

N/A

B) Noise

--

The use of quieter plant (QPME) is specified for the list of equipment:

--

¡½   Tracked excavator fitted with hydraulic rock breaker; ¡½   Concrete lorry mixer; ¡½   Tracked mobile crane (132kW, 55t);

^

¡½   Dump Truck; ¡½   Tracked excavator (14t); ¡½   Generator, Super Silenced, 70 dB(A) at 7m; ¡½   Poker vibratory;

¡½   Hand Held Electric Circular Saw, 150mm Blade with SWL of 103dB(A) or less;

¡½   Electric Chain-Saw, Hand-held; and ¡½   Water Pump, Submersible (Electric).

For the Columbarium (NSR1), the vertical gaps along of edge of the solid boundary wall facing the works area WA4 should be covered with acoustic fabric or small barrier for noise screening.

^

The use of temporary noise barrier / enclosure are specified for the list of equipment:

--

¡½   Bar Bender and Cutter (Electric) - Noise Enclosure

^

¡½   Tracked excavator fitted with hydraulic rock breaker - Temporary Noise barrier;

¡½   Tracked excavator (14t) - Temporary Noise barrier

¡½   Generator, Super Silenced, 70 dB(A) at 7m - Noise Enclosure; and

¡½   Hand Held Electric Circular Saw, 150mm Blade - Noise Enclosure.

Installation of a fixed noise barrier of 3m in height between the NSR5 and the open cut trench (Activities 4 and 4+ at Works Section 5)

N/A

(Works is ended in that section)

Implementation of further good site practices:

--

¡½   Only well-maintained plant should be operated on- site and PME should be serviced regularly during the construction programme;

^

¡½   Silencers or mufflers on construction equipment should be utilised and properly maintained throughout the construction programme;

^

¡½   Any mobile PME should be sited as far from NSRs as possible;

^

¡½   Machines and PME that may be in intermittent use should be shut down between work periods or should be throttled down to a minimum;

^

¡½   PME known to emit noise strongly in one direction should be orientated to direct away from the nearby NSRs;

^

¡½   Material stockpiles and other structures should be effectively utilised, wherever practicable, in screening noise from on-site construction activities;

^

¡½   Use of acoustic enclosure, in accordance with EPD's A Practical Guide for the Reduction of Noise from Construction Works; and

^

¡½   Re-scheduling of works should be considered to ameliorate the residual impact.

^

C) Water Quality

--

In accordance with the Practice Note for Professional Persons on Construction Site Drainage, Environmental Protection Department, 1994 (ProPECC PN 1/94), construction phase mitigation measures shall include the following:

^

¡½   At the establishment of Site Office (SO), works area (WA1 and WA2) and stockpiling areas (SA1, SA2, SA3 and SA4; (see Figures 2.9a-2.9g), perimeter cut-off drains to direct off-site water around the site should be constructed with internal drainage works and erosion and sedimentation control facilities implemented. Channels (both temporary and permanent drainage pipes and culverts), earth bunds or sand bag barriers should be provided to divert the stormwater to silt removal facilities. The design of the temporary on-site drainage system will be undertaken by the Contractor prior to the commencement of construction;

^

¡½   Dikes or embankments for flood protection should be implemented around the boundaries of earthwork areas. Temporary ditches should be provided to facilitate the runoff discharge into an appropriate watercourse, through a site/sediment trap. Sediment/silt traps should be incorporated in the permanent drainage channels to enhance deposition rates;

^

¡½   While ProPECC PN 1/94 requires construction works should be programmed to minimise surface excavation works during rainy seasons (April to September). By the nature of the pipe laying works, it is considered not practicable to avoid excavation works in the wet season as this would substantially affect the overall construction programme. However, for works at areas that directly interface with the existing watercourses, excavation works shall avoid the rainy season as far as possible. These include Intake A interfacing the stream, Intake B interfacing the U channel, Outfall A interfacing the gabion channel, Intake C/RP3 interfacing the gabion channel and Outfall B/RP4 interfacing Ngong Ping Stream (see Figures 2.9a-2.9g). For the works in the above listed areas, an impermeable cofferdam or similar barrier to the level above the stream bank shall be erected to completely enclose these areas before any works are undertaken. This will ensure that any contaminated runoff from the works areas will not get into the ambient watercourses. These barriers shall not be removed until the interfacing works and the relevant upstream connected drains have been completed. All exposed earth areas should be completed and vegetated as soon as possible after the earthworks have been completed, or alternatively, within 14 days of the cessation of earthworks where practicable;

^

¡½   Exposed slope surfaces should be covered by tarpaulin or other means during the rainy season;

^

¡½   The design of efficient silt removal facilities should be based on the guidelines in Appendix A1 of ProPECC PN 1/94, which states that the retention time for silt/sand traps should be 5 minutes under maximum flow conditions. The sizes may vary depending upon the flow rate, but for a flow rate of 0.1m3/s, a sedimentation basin of 30m3 would be required and for a flow rate of 0.5m3/s the basin would be 150m3. The detailed design of the sand/silt traps should be undertaken by the contractor prior to the commencement of construction;

^

¡½   The overall slope of works sites should be kept to a minimum to reduce the erosive potential of surface water flows, and all trafficked areas and access roads should be protected by coarse stone ballast. An additional advantage accruing from the use of crushed stone is the positive traction gained during the prolonged periods of inclement weather and the reduction of surface sheet flows;

^

¡½   All drainage facilities and erosion and sediment control structures should be regularly inspected and maintained to ensure their proper and efficient operation at all times particularly following rainstorms. Deposited silts and grits should be removed regularly and disposed of proper waste receiving facilities. As the area is within the water gathering grounds, on-site disposal of silts/grits shall not be allowed;

^

¡½   Measures should be taken to minimise the ingress of site drainage into excavations. If the excavation of trenches in wet season is inevitable, they should be dug and backfilled in short sections wherever practicable. The water pumped out from trenches or foundation excavations should be discharged into storm drains via silt removal facilities;

^

¡½   Manholes (including newly constructed ones) should always be adequately covered and temporarily sealed so as to prevent silt, construction materials or debris being washed into the drainage system and storm runoff being directed into foul sewers;

^

¡½   Precautions to be taken at any time of the year when rainstorms are likely, actions to be taken when a rainstorm is imminent or forecasted and during or after rainstorms, are summarised in Appendix A2 of ProPECC PN 1/94. Particular attention should be paid to the control of silty surface runoff during storm events, especially for areas located near steep slopes;

^

¡½   All vehicles and plant should be cleaned before leaving a construction site to ensure no earth, mud, debris and the like is deposited by them on roads. An adequately designed and sited wheel washing facilities should be provided at the exit of every construction site where practicable. Wash-water should have sand and silt settled out and removed at least on a weekly basis to ensure the continued efficiency of the process. The section of access road leading to, and exiting from, the wheel- washing bay to public roads should be paved with sufficient backfall toward the wheel-washing bay to prevent vehicle tracking of soil and silty water to public roads and drains;

^

¡½   Oil interceptors should be provided in the drainage system downstream of any oil/fuel pollution sources. Oil interceptors should be emptied and cleaned regularly to prevent the release of oil and grease into the storm water drainage system after accidental spillage. A bypass should be provided for oil interceptors to prevent flushing during heavy rain;

N/O

¡½   Stockpiled material shall be covered by tarpaulin and /or watered as appropriate to prevent windblown dust and surface run off. Measures should be taken to prevent the washing away of construction materials, soil, silt or debris into any drainage system;

^

¡½   Major stockpiled areas shall be sited outside of the country parks area (Works Section 6) and away from stream courses as far as practicable. For the stockpiling area SA4 within the country park area, stockpiling of earthed material shall be minimised and excavated soil from Works Section 6 shall be delivered to the Site Office as soon as possible. Similarly, overnight stockpiling of earthed material along the exposed trench shall be minimised as far as possible and the excavated soil shall be transferred to the designated stockpiling area as soon as possible;

^

¡½   The Contractor shall comply with WSD's General Conditions for Working within Water Gathering Grounds as applicable;

^

¡½   The construction solid waste, debris and rubbish on-site should be collected, handled and disposed of properly to avoid causing any water quality impacts. The requirements for solid waste management are detailed in Section 9 of this EIA report; and

^

¡½   All fuel tanks and chemical and bentonite storage areas should be provided with locks and sited on sealed areas, within bunds of a capacity equal to 110% of the storage capacity of the largest tank to prevent spilled fuel oils from reaching the nearby WSRs.

^

There is a need to apply to the EPD for a discharge licence for discharge of effluent from the construction site under the WPCO. The discharge quality must meet the requirements specified in the discharge licence. All the runoff and wastewater generated from the works areas should be treated so that it satisfies all the standards listed in the TM-DSS. It should particularly noted that the TM-DSS specifically prohibits the discharge of the following substances into the inland waters:

N/A

¡½   polychlorinated biphenyls (PCB);  ¡½   polyaromatic hydrocarbon (PAH);  ¡½   fumigant, pesticide or toxicant ;

¡½   radioactive substances ;  ¡½   chlorinated hydrocarbons;  ¡½   flammable or toxic solvents ;

¡½   petroleum oil or tar;  ¡½   calcium carbide;  ¡½   wastes liable to form scum, deposits or discoloration;

¡½   sludge or solid refuse of any kind; and  ¡½   detergents in Group A inland waters only.

The beneficial uses of the treated effluent for other on- site activities such as dust suppression, wheel washing and general cleaning etc, can minimise water consumption and reduce the effluent discharge volume and shall be encouraged. If monitoring of the treated effluent quality from the works areas is required during the construction phase of the Project, the monitoring should be carried out in accordance with the WPCO license.

^

In addition to compliance with the discharge licence requirement, to prevent bank side erosion, the discharge of site effluents shall be either at existing storm drains or artificial channels. No effluent or treated surface runoff shall be allowed to discharge at natural stream course.

N/A

The use of bentonite slurries shall be minimised as far as possible. In addition to the requirement of a peripheral bunds and drainage system for the WA4 and SO, where the bentonite slurries will be used, to prevent any accidental release of bentonite slurry from getting into the surrounding environment, the following specific control measures shall be followed to reduce the risk and impacts of accidental spillage:

--

¡½   All bentonite slurry should be stored in a container that resistant to corrosion, maintained in good conditions and securely closed;

^

¡½   The container should be labelled in English and Chinese and note that the container is for storage of bentonite slurry only;

^

¡½   The storage container should be placed on an area of impermeable flooring and bunded with capacity to accommodate 110% of the volume of the container size or 20% by volume stored in the area and enclosed with at least 3 sides; and

^

¡½   Sufficiently covered to prevent rainfall entering the container or bunded area (water collected within the bund must be tested and disposed of as chemical waste, if necessary).

^

In order to reduce the possibility of frac-out, detailed ground investigation shall be undertaken to evaluate the likelihood of frac-out and if necessary advanced ground treatment applied before the commencement of the pipe jacking works. A member of the Contractor's site staff shall, also, be dedicated to closely monitor the ground surface above the pipe jacking head for any frac-outs release. The pipe jacking works and application of bentonite shall immediately stop if frac- outs are observed. Any frac-out shall be immediately cleaned or bunded to prevent spreading of the bentonite slurry. The Contractor shall immediately notify the Engineer and propose rectification measures to prevent further frac-out to the satisfaction of the Engineer before pipe jacking works resume. An emergency clean up kit shall be readily available at Works Section 2 and 6 where pipe jacking will be undertaken.

^

The handling and disposal of bentonite slurries should be undertaken in accordance within ProPECC PN 1/94. Surplus bentonite slurries used in construction works shall be reconditioned and reused wherever practicable. Residual bentonite slurry shall be disposed of from the site as soon as possible as stipulated in Clause 8.56 of the General Specification for Civil Engineering Works. The Contractor should explore alternative disposal outlets for the residual bentonite slurry (dewatered bentonite slurry to be disposed to a public filling area and liquid bentonite slurry if mixed with inert fill material to be disposed to a public filling area) and disposal at landfill should be the last resort.

^

The contractor must register as a chemical waste producer if chemical wastes would be produced from the construction activities. The Waste Disposal Ordinance (Cap 354) and its subsidiary regulations in particular the Waste Disposal (Chemical Waste) (General) Regulation should be observed and complied with for control of chemical wastes.

^

Any maintenance facilities should be located outside Works Section 6 in the Lantau North Country Park. Such facilities should be located on hard standings within a bunded area, and sumps and oil interceptors should be provided. Maintenance of vehicles and equipment involving activities with potential for leakage and spillage should only be undertaken within the areas appropriately equipped to control these discharges. All maintenance activities which may generate chemical waste shall be undertaken in the Site Office area, as far as possible.

^

Disposal of chemical wastes should be carried out in compliance with the Waste Disposal Ordinance. The Waste Disposal Ordinance (Cap 354) and its subsidiary regulations in particular the Waste Disposal (Chemical Waste) (General) Regulation should be observed and complied with for control of chemical wastes. The Code of Practice on the Packaging, Labelling and Storage of Chemical Wastes published under the Waste Disposal Ordinance details the requirements to deal with chemical wastes. General requirements are given as follows:

--

¡½   Suitable containers should be used to hold the chemical wastes to avoid leakage or spillage during storage, handling and transport;

^

¡½   Chemical waste containers should be suitably labelled, to notify and warn the personnel who are handling the wastes, to avoid accidents; and

^

¡½   Storage area should be selected at a safe location on site and adequate space should be allocated to the storage area.

^

In order to minimise the risk of accidental spillage, the use and storage of oils/chemicals/waste should be limited to absolute minimum volume and are to be removed from sites at the earliest opportunity. However, all chemical waste, fuels and oils shall be stored at the Site Office (SO), to minimise impact to the Lantau North Country Park and water gathering grounds.

^

In order to protect against an accidental spillage of fuel or oil, the Contractor will be required to prepare a spill response plan to the satisfaction of AFCD, EPD, FSD, HyD, Police, TD and WSD to define procedures for the control, containment and clean-up of any spillage that could occur on the construction site.

^

At all times, the Contractor shall comply with WSD's General Conditions for Working within Water Gathering Grounds as applicable.

^

The sewage of the site office will be connected the existing sewer networks and be treated at the Ngong Ping STW. Portable chemical toilets and sewage holding tanks are recommended for the handling of the construction sewage generated by the workforce at other works area. The use of temporary toilets within the water gathering ground, however, is also subject to the approval of Water Services Department. A licensed contractor should be employed to provide appropriate and adequate portable toilets and be responsible for appropriate disposal and maintenance

^

The Outfall A and Intake C and associated works areas are within the gabion channel, the construction and operation of which was previously governed by the Environmental Permit EP-192/2004. While the EP was surrendered in May 2007, the currently proposed works at these locations shall, also, comply with the specific conditions of the EP (see Section 2.7 of this Report) as far as possible and in particular avoid works in the rainy period between April and September so as to minimise potential water quality pollution to the lowest possible.

^

D) Ecology

--

Good construction practice measures which should be implemented and should include:

--

¡½   avoid damage and disturbance to the remaining and surrounding natural habitat;

^

¡½   placement of equipment in designated areas within the existing disturbed land;

^

¡½   spoil heaps should be covered at all times;

^

¡½   construction activities should be restricted to the proposed works boundary; and

^

¡½   disturbed areas to be reinstated immediately after completion of the works.

^

Landscape compensatory planting is recommended as mitigation for the loss of landscape and habitat. Recommended Planting Species included:

--

Tree

--

Cinnamomum burmannii,
Elaeocarpus sylvestris
Ficus microcarpa
Pongamia pinnata
Schefflera heptaphylla
Sapium discolor

N/A

Minimisation mitigation measures required to protect water quality and the three aquatic faunal species of conservation would comprise controlling surface run­off:

--

¡½   All works on the banks of the natural stream should be undertaken within the dry season, where practical;

N/A

¡½   Perimeter cut-off drains to direct off-site water around the site should be constructed with internal drainage works and erosion and sedimentation control facilities implemented;

N/A

¡½   Channels (both temporary and permanent drainage pipes and culverts), earth bunds or sand bag barriers should be provided to divert the stormwater to silt removal facilities;

^

¡½   Oil interceptors should be provided in the drainage system downstream of any oil/fuel pollution sources;

N/A

¡½   Stockpiled material shall be covered by tarpaulin and /or watered as appropriate to prevent windblown dust and surface run off;

^

¡½   Overnight stockpiling of earthed material along the exposed trench shall be minimised as far as possible and excavated soil shall be transferred to the designated stockpiling area as soon as possible;

^

¡½   All bentonite slurry shall be suitably stored in accordance with Section 5.8.8 of this EIA Report to minimise the chance of spillage;

^

¡½   All fuel tanks and storage areas should be provided with locks and sited on sealed areas, within bunds of a capacity equal to 110% of the storage capacity of the largest tank to prevent spilled fuel oils; and

^

¡½   Pipe jacking areas shall be closely monitored for frac-outs release of bentonite and frac-out area immediately cleaned if they occur.

^

The particular measures to protect the ecology of the Lantau North Country Park are summarised below:

--

¡½   Major stockpiled areas shall be sited outside of the country parks area (Works Section 6) and away from stream courses as far as practicable;

^

¡½   All backfilling material and cement required for this Works Section 6 shall be delivered daily and only the quantity required;

^

¡½   No storage of chemicals and waste in Works Section 6; and

^

¡½   No construction plant maintenance facilities in Works Section 6.

^

Treated site drainage shall be discharged via the existing drainage system or diverted to the artificial channel to prevent stream bank erosion and directly affect the stream ecology. No site drainage shall be allowed to be discharged at the natural stream bank.

^

E) Landscape and Visual

--

To maximize protection of existing resources including watercourses existing trees, ground vegetation and the associated understory habitats a "No-intrusion Zone" will be designated to various areas within and along the site boundary with rigid and durable fencing for each individual no-intrusion zone. Regular checks will be carried out to ensure that the work site boundaries are not exceeded, hoarding is properly maintained and that no damage is being caused to these protected areas.

^

A temporary screen hoarding shall be erected around the north side of the Site Office (SO) area to screen activities from local receivers. It shall be designed and to be compatible with the existing rural context, with visually unobtrusive design and colours where appropriate.

^

No night time work shall be programmed avoiding light pollution to visual receivers.

^

F) Cultural Heritage

--

Four built heritage resources have been identified as being located in close proximity to the proposed works areas, namely, NP-19, NP-20, NP-21 and NP-26, as detailed in Appendix G1 and shown in Figures 8.12, 8.13 and 8.15 of the EIA Report. The structures may be damaged by contact with machinery and equipment. The recommended mitigation measures for each resource are as follows:

--

¡½   A buffer zone of a minimum of 5 metres in size (or if due to site/engineering constraints, as large as possible buffer zone should be provided) should be marked out for NP-19, NP-20, NP-21 and NP-26 by temporary fencing and placed around the structures 2 weeks prior to the construction works commencing.

^

Three built heritage resources have been identified as being in close proximity to an excavation area (NP-10, NP-11 and NP-19), a condition survey must be carried out by a qualified building surveyor or engineer one month in advance of works commencing near the buildings that may be affected by ground borne vibration. The Condition Survey Report should contain descriptions of the structure, identification of fragile elements, an appraisal of the condition and working methods for any proposed monitoring (including frequency of monitoring) and precautionary measures that are recommended. The Contractor must implement the approved monitoring and precautionary measures.

^

¡½   Vibration monitoring should be undertaken for the duration of the construction works based upon the recommendations of the approved Condition Survey Report, which will also define the frequency of monitoring required. The maximum acceptable level of vibration will be set at 15 mm/s. Based upon the findings of the condition survey, this limit may be revised for sensitive structures. The location of monitoring points should be situated on the structure closest to the construction works, unless the maximum level is set lower than the standard 15 mm/s, in which case monitoring points should be located on each affected structure. Installation of monitoring points must not damage the historic building fabric. The location of monitoring points (and access to the property for purposes of measurement) must be agreed with the property owner prior to installation.

^

G) Waste Management

--

The requirements as stipulated in the ETWB TC(W) No.19/2005 Environmental Management on Construction Sites and the other relevant guidelines should be included in the Particular Specification for the Contractor as appropriate.

The future Contractor should be requested to submit a Waste Management Plan (WMP), which becomes part of the Environmental Management Plan (EMP), prior to the commencement of construction work, in accordance with the ETWB TC(W) No.19/2005 so as to provide an overall framework of waste management and reduction. The WMP should include:

^

¡½   Waste management policy;  ¡½   Record of generated waste;  ¡½   Waste reduction target;  ¡½   Waste reduction programme;

¡½   Role and responsibility of waste management team;  ¡½   Benefit of waste management;  ¡½   Analysis of waste materials;

¡½   Reuse, recycling and disposal plans;  ¡½   Transportation process of waste products; and  ¡½   Monitoring and action plan.

A trip-ticket system should be established in accordance with DevB TC(W) No. 6/2010 and Waste Disposal (Charges for Disposal of Construction Waste) Regulation to monitor the disposal of public fill and solid wastes at public filling facilities and landfills, and to control fly-tipping. A trip-ticket system would be included as one of the contractual requirements for the Contractor to strictly implement. The Engineer would also regularly audit the effectiveness of the system.

A recording system for the amount of waste generated, recycled and disposed (locations) should be established. The future Contractor should also provide proper training to workers regarding the appropriate concepts of site cleanliness and waste management procedures, e.g. waste reduction, reuse and recycling all the time.

The CEDD should be timely notified of the estimated volumes of excavated materials to be generated and the Public Fill Committee should be notified and agreement sort on the disposal of surplus inert C&D materials. Wherever practicable, C&D materials should be segregated from other wastes to avoid contamination and to ensure acceptability at public filling areas or reclamation sites.

^

 

 

 

^

 

 

 

^

Recommendations for good site practices:

--

¡½   The site and surroundings shall be kept tidy and litter free;

^

¡½   No waste shall be burnt on-site;

^

¡½   Make provisions in contract documents to allow and promote the use of recycled aggregates where appropriate;

^

¡½   The Contractor will be prohibited to dispose of C&D materials within the proposed site and at any sensitive locations including Lantau North Country Park, the Lantau South Country Park, the Ngong Ping Site of Special Scientific Interest, the Lantau Peak Special Area and Site of Special Scientific Interest and the Conservation Area, etc. The Contractor should propose the final disposal sites in the EMP and WMP for approval before implementation;

^

¡½   Stockpiled material shall be covered by tarpaulin and /or watered as appropriate to prevent windblown dust and surface run off;

^

¡½   Major stockpiled areas shall be sited outside of the country parks area (Works Section 6) and away from stream courses as far as practicable. For the stockpiling area SA4 within the country park area, stockpiling of earthed material shall be minimised and excavated soil from Works Section 6 shall be delivered to the Site Office as soon as possible. Similarly, overnight stockpiling of earthed material along the exposed trench shall be minimised as far as possible and the excavated soil shall be transferred to the designated stockpiling area as soon as possible;

^

¡½   Excavated material in trucks shall be covered by tarpaulins to reduce the potential for spillage and dust generation;

^

¡½   Wheel washing facilities shall be used by all trucks leaving the site to prevent transfer of mud onto public roads;

^

¡½   Standard formwork or pre-fabrication should be used as far as practicable so as to minimise the C&D materials arising. The use of more durable formwork or plastic facing for construction works should also be considered. The use of wooden hoardings should be avoided and metal hoarding should be used to facilitate recycling. Purchasing of construction materials should be carefully planned in order to avoid over-ordering and wastage;

^

¡½   The Contractor should recycle as many C&D materials as possible on-site. The public fill and C&D waste should be segregated and stored in separate containers or skips to facilitate the reuse or recycling of materials and proper disposal. Where practicable, the concrete and masonry should be crushed and used as fill materials. Steel reinforcement bar should be collected for use by scrap steel mills. Different areas of the sites should be considered for segregation and storage activities; and

¡½    Subject to agreement with Water Service Department, adequate numbers of portable toilets should be provided for on-site workers. Portable toilets should be maintained in reasonable states, which will not deter the workers from utilising them. Night soil should be regularly collected by licensed collectors.

^

^

Recommendations for waste reduction measures:

--

¡½   General refuse arising on-site should be stored in enclosed bins or compaction units separately from C&D and chemical wastes. General refuse shall be removed from Works Section 6 within the country park on the regular basis. Sufficient dustbins shall be provided for storage of waste as required under the Public Cleansing and Prevention of Nuisances By-laws. In addition, general refuse shall be cleared regularly and shall be disposed of to the nearest licensed landfill or refuse transfer station. Burning of refuse on construction sites is prohibited;

^

¡½   All waste containers shall be in a secure area on hardstanding;

^

¡½   Aluminium cans are usually collected and recovered from the waste stream by individual collectors if they are segregated and easily accessible. Separately labelled bins for their deposition should be provided as far as practicable;

^

¡½   Office wastes can be reduced by recycling of paper if such volume is sufficiently large to warrant collection. Participation in a local collection scheme by the Contractor should be advocated. Waste separation facilities for paper, aluminium cans, plastic bottles, etc should be provided on- site; and

^

¡½   Training shall be provided to workers about the concepts of site cleanliness and appropriate waste management procedure, including waste reduction, reuse and recycling.

^

Chemical waste producers should register with the EPD. Chemical waste should be handled in accordance with the Code of Practice on the Packaging, Handling and Storage of Chemical Wastes as follows:

--

¡½   Suitable for the substance to be held, resistant to corrosion, maintained in good conditions and securely closed;

^

¡½   Having a capacity of <450L unless the specifications have been approved by the EPD;

N/A

¡½   Displaying a label in English and Chinese according to the instructions prescribed in Schedule 2 of the Regulations;

^

¡½   Clearly labelled and used solely for the storage of chemical wastes;

^

¡½   Enclosed with at least 3 sides;

^

¡½   Impermeable floor and bund with capacity to accommodate 110% of the volume of the largest container or 20% by volume of the chemical waste stored in the area, whichever is greatest;

^

¡½   Adequate ventilation;

^

¡½   Sufficiently covered to prevent rainfall from entering (water collected within the bund must be tested and disposed of as chemical waste, if necessary);

^

¡½   Incompatible materials are adequately separated;

^

¡½   All chemical waste, fuels and oils shall be stored at the Site Office area, to minimise impacts to the Country Park and water gathering grounds;

^

¡½   All maintenance activities which may generate chemical waste shall be undertaken in Site Office area, as far as possible;

^

¡½   The Contractor shall comply with WSD's General Conditions for Working within Water Gathering Grounds as applicable; and

^

¡½   Waste oils, chemicals or solvents shall not be disposed of to drain.

^

 

Remark:

^

Compliance of mitigation measure in the reporting period.

#

Recommendations were made in the reporting period but has not yet been improved/rectified by the Contractor.

X

Non-compliance of mitigation measure in the reporting period.

N/A

Not Applicable in the reporting period.

N/O

Not observed in the reporting period.

(1)

Detailed EIA report and EM&A Manual reference refer to the Appendix A of approved EM&A Manual.

 


Appendix C3 Summary of Site Inspection

Inspection

Date

Observations/ Reminders/ Recommendations

Follow Up Action

Completion

Date

Follow Up action(s)

of

last reporting month

NIL.

N.A

N.A

Weekly Site Inspection

02/05/2023

Observation

 

 

1) The NRMM Label of the excavator should be replaced (L305).

1) New NRMM label have been replaced at L305

02/05/2023

09/05/2023

Reminder

 

 

1) Broken  sandbag should be replaced (Bay 4).

--

--

16/05/2023

Observation

 

 

1) Stagnant water in the drip tray should be cleared (L301).

1) Stragnant water have been removed.

23/05/2023

2) Stagnant water should be removed (L304).

2) Stagnant water have been removed.

23/05/2023

Reminder

 

 

1) Broken sandbag should be replaced (L304).

--

--

23/05/2023

Reminder

 

 

1) Broken samdbag should be replaced (L303).

--

--

2) Sand should cleared nearby the river.

--

--

3) General refuse should be cleared (Outfall2)

--

--

30/05/2023

Observation

 

 

1) Water spray should be provided at the main haul road as dust control measures (Bay 9).

1) The observation will be followed up by the Contractor

--

Landscape and Visual

02/05/2023

--

--

--

16/05/2023

--

--

--

30/05/2023

--

--

--

Cultural Heritage

23/05/2023

--

 

 

Quarterly Post-transplantation Works

--

--

Monthly Floral Protection Measures

16/05/2023

Reminder

 

 

1) From previous audit were not followed; posts to be replaced or repaired were not fixed

--

--

2) Replace the posts that are no loger found as indicated

--

--

3) Repair the posts that have fallen down as indicated.

--

--

 


 


Cultural Heritage       

 

Monthly Floral Protection Measures


 


Appendix D Monitoring Parameters Action and Limit Levels

Noise

Action and Limit Levels for Impact Monitoring

Time Period

Monitoring

Location No.

Action Level

Limit Level*

Leq),dB(A)

(0700-1900 hrs in normal weekdays)(1)

NSR1

Columbarium of Po Lin Monastery

When one documented complaint is received.

70 dB(A)

NSR5

Village House No. 49A

When one documented complaint is received.

75 dB(A)

NSR8

Village House No. 34

When one documented complaint is received.

75 dB(A)

Note:

*75 dB(A) for residential premises and 70 dB(A) for educational institutions, kindergartens, nurseries and all others where voice communication

(1) Any general construction work carried out during restricted hours is controlled by Construction Noise Permit (CNP) under the NCO.

 

Water Quality

 

Action and Limit Levels for Impact Monitoring

Parameter(s)

 

Station(s)

DO in mg/L

Turbidity in NTU

pH

Suspended Solids in mg/L

AL

LL

AL

LL

AL

LL

AL

LL

WS1-R1

 

 

 

 

 

 

 

 

 

 

 

 

WS1-I1

7.36

7.32

15.8(5)

17.3(6)

< 

6.5(3)

or

> 

6.9(4)

<6.5 or >8.5

14(5)

14(6)

WS1-R2

 

 

 

 

 

 

 

 

 

 

 

 

WS1-I2

7.19

7.11

16.4(5)

18.4(6)

< 

6.5(3)

or

> 

6.9(4)

<6.5 or >8.5

10(5)

14(6)

WS4-R3

 

 

 

 

 

 

 

 

 

 

 

 

WS4-I3

7.29

7.28

22.9(5)

31.2(6)

< 

6.9(3)

or

> 

7.2(4)

<6.5 or >8.5

13(5)

13(6)

WS5-R4

 

 

 

 

 

 

 

 

 

 

 

 

WS5-I4

6.75

6.64

24.7(5)

28.2(6)

< 

6.6(3)

or

> 

7.1(4)

<6.5 or >8.5

9(5)

9(6)

WS6-R5

 

 

 

 

 

 

 

 

 

 

 

 

WS6-I5

6.31

6.23

12.6(5)

13.2(6)

< 

6.6(3)

or

> 

7.0(4)

<6.5 or >8.5

10(5)

10(6)

WS6-C1

 

 

 

 

 

 

 

 

 

 

 

 

WS6-R6

 

 

 

 

 

 

 

 

 

 

 

 

WS6-I6

6.57

6.38

21.7(5)

23.7(6)

< 

6.9(3)

or

> 

7.1(4)

<6.5 or >8.5

12(5)

13(6)

Note:

AL: Action Level, LL: Limit Level

(3)    Or 80% of upstream control station.

(4)    Or 110% of upstream control station.

(5)    Or 120% of upstream control station of the same day.

(6)    Or 130% of upstream control station of the same day.

 


Appendix E Event and Action Plans

Event and Action Plan for Construction Noise Monitoring

EVENT

ACTION

ET(1)

IEC(1)

Engineer

Contractor

Action Level

1. Notify the IEC and Contractor.

2. Carry out investigation.

3. Report the results of investigation to the IEC and Contractor.

4. Discuss with the Contractor and formulate remedial measures.

5. Increase monitoring frequency to check mitigation effectiveness.

1. Review the analysed results submitted by the ET.

2. Review the proposed remedial measures by the Contractor and advise the Engineer accordingly.

3. Supervise the implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify the Contractor.

3. Require the Contractor to propose remedial measures for the analysed noise problem.

4. Ensure remedial measures are properly implemented.

1. Submit noise mitigation proposals to the IEC.

2. Implement noise mitigation proposals.

Limit Level

1. Notify the IEC, Engineer, EPD and Contractor.

2. Identify sources.

3. Repeat measurements to confirm findings.

4. Increase monitoring frequency.

5. Carry out analysis of the Contractor's working procedures to determine possible mitigation to be implemented.

6. Inform the IEC, Engineer and EPD the causes and action taken for the exceedances.

7. Assess the effectiveness of the Contractor's remedial action and keep the IEC, EPD and Engineer informed of the results.

8. If exceedance stops, cease additional monitoring.

1. Discuss amongst the Engineer, ET and Contractor on the potential remedial action.

2. Review the Contractor's remedial action whenever necessary to assure their effectiveness and advise the Engineer accordingly.

3. Supervise the implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify the Contractor.

3. Require the Contractor to propose remedial measures for the analysed noise problem.

4. Ensure remedial measures are properly implemented.

5. If exceedance continues, consider what portion of work is responsible and instruct the Contractor to stop that portion of works until the exceedance is abated.

1. Take immediate action to avoid further exceedance.

2. Submit proposals for remedial action to the IEC within 3 working days of notification.

3. Implement the agreed proposals.

4. Resubmit proposals if problems still not under control.

5. Stop the relevant portion of works as determined by the Engineer until the exceedance is abated.

Note:      (1) ET - Environmental Team, IEC - Independent Environmental Checker;

(2) According to EM&A Manual Table 3.4.


Event and Action Plan for Water Quality Monitoring (Part 1)

EVENT

ACTION

ET(1)

IEC(1)

ER(1)

Contractor

Action Level being

exceeded by one sampling day

1. Repeat in-situ measurement to confirm findings;

2. Identify source(s) of impact;

3. Inform the IEC and the Contractor;

4. Check monitoring data, all plant, equipment and the Contractor's working methods;

5. Discuss mitigation measures with the IEC and the Contractor;

6. Repeat measurement on next day of exceedance.

1. Discuss with the ET and the Contractor on the mitigation measures;

2. Review proposals on mitigation measures submitted by the Contractor and advise the ER accordingly;

3. Access the effectiveness of the implemented mitigation measures

1. Discuss with the IEC on the proposed mitigation measures;

2. Make agreement on the mitigation measures to be implemented.

1. Inform the ER and confirm notification of the non- compliance in writing;

2. Rectify unacceptable practice;

3. Check all plant and equipment;

4. Consider changes of working methods;

5. Discuss with the ES and the IEC and propose mitigation measures to the IEC

Action Level being

exceeded by more than one consecutive sampling days

1. Repeat in-situ measurement to confirm findings;

2. Identify source(s) of impact;

3. Inform the IEC and the Contractor;

4. Check monitoring data, all plant, equipment and Contractor's working methods;

5. Discuss mitigation measures with the IEC and the Contractor;

6. Ensure mitigation measures are implemented;

7. Prepare to increase the monitoring frequency to daily;

1. Discuss with the ET and the Contractor on the mitigation measures;

2. Review proposals on mitigation measures submitted by the Contractor and advise the ER accordingly;

3. Access the effectiveness of the implemented mitigation measures

1. Discuss with IEC on the proposed mitigation measures;

2. Make agreement on the mitigation measures to be implemented;

3 Access the effectiveness of the implemented mitigation measures.

1. Inform the ER and confirm notification of the non- compliance in writing;

2. Rectify unacceptable practice;

3. Check all plant and equipment;

4. Consider changes of working methods;

5. Discuss with the ES and the IEC and propose mitigation measures to the IEC and ER within 3 working days;

6. Implement the agreed mitigation

 


Event and Action Plan for Water Quality Monitoring (Part 2)

EVENT

ACTION

ET(1)

IEC(1)

ER(1)

Contractor

Limit Level being

exceeded by one

consecutive sampling day

1. Repeat in-situ measurement to confirm findings;

2. Identify source(s) of impact;

3. Inform the IEC, the Contractor and the DEP;

4. Check monitoring data, all plant, equipment and the Contractor's working methods;

5. Discuss mitigation measures with the IEC, the ER and the Contractor;

6. Ensure mitigation measures are implemented;

7. Increase the monitoring frequency to daily until no exceedance of Limit Level.

1. Discuss with the ES and the Contractor on the mitigation measures;

2. Review proposals on mitigation measures submitted by the Contractor and advise the ER accordingly;

3. Access the effectiveness of the implemented mitigation measures.

1. Discuss with the IEC, the ES and the Contractor on the proposed mitigation measures;

2. Request the Contractor to critically review the working methods;

3. Make agreement on the mitigation measures to be implemented;

4. Access the effectiveness of the implemented mitigation measures.

1. Inform the Engineer and confirm notification of the non-compliance in writing;

2. Rectify unacceptable practice;

3. Check all plant and equipment;

4. Consider changes of working methods;

5. Discuss with the ES, the IEC and the ER and propose mitigation measures to the IEC and the ER within 3 working days;

6. Implement the agreed mitigation measures.

Limit Level

being

exceeded by

more than

one

consecutive

sampling

days

 

1. Repeat in-situ measurement to confirm findings;

2. Identify source(s) of impact;

3. Inform the IEC, the Contractor and DEP;

4. Check monitoring data, all plant, equipment and Contractor's working methods;

5. Discuss mitigation measures with the IEC, the ER and the Contractor;

6. Ensure mitigation measures are implemented;

7. Increase the monitoring frequency to daily until no exceedance of Limit Level for two consecutive days.

 

1. Discuss with ET and Contractor on the mitigation measures;

2. Review proposals on mitigation measures submitted by the Contractor

and advise the ER accordingly;

3. Access the effectiveness of the implemented mitigation measures.

 

1. Discuss with the IEC, the ES and the

Contractor on the proposed mitigation

measures;

2. Request Contractor to critically review the working methods;

3. Make agreement on the mitigation measures to be implemented;

4. Access the effectiveness of the implemented mitigation measures;

5. Consider and instruct, if necessary, the

Contractor to slow down or to stop all or part of the works until no exceedance of Limit Level.

1. Inform the ER and confirm notification of the non- compliance in writing;

2. Rectify unacceptable practice;

3. Check all plant and equipment;

4. Consider changes of working methods;

5. Discuss with the ES, the IEC and the ER and propose mitigation measures to the IEC and the ER within 3 working

days;

6. Implement the agreed mitigation measures;

7. As directed by the ER, slow down or stop all or part of the construction activities.

Note:      (1) ET - Environmental Team, IEC - Independent Environmental Checker;

(2) According to EM&A Manual Table 4.4.


Event / Action Plan for Ecological Monitoring

Action Level

ET(1)

IEC(1)

ER(1)

Contractor

Non-conformity  on one occasion

Identify Source

Inform the IEC and the ER

Discuss remedial actions with the IEC, the ER and the Contractor

Monitor remedial actions until rectification has been completed

Check report

Check the Contractor's working method

Discuss with the ET and the Contractor on possible remedial measures

Advise the ER on effectiveness of proposed remedial measures.

Check implementation of remedial measures.

Notify Contractor

Ensure remedial measures are properly implemented

Consider and instruct, if necessary, the Contractor to slow down or to stop all or part of the works in the case of a serious non-conformity until situation rectified.

Amend working methods

Rectify damage and undertake any necessary replacement

Repeated Non conformity

Identify Source

Inform the IC(E) and the ER

Increase monitoring frequency

Discuss remedial actions with the IC(E), the ER and the Contractor

Monitor remedial actions until rectification has been completed

If exceedance stops, cease additional monitoring

Check monitoring report

Check the Contractor's working method

Discuss with the ES and the Contractor on possible remedial measures

Advise the ER on effectiveness of proposed remedial measures

Supervise implementation of remedial measures

Notify the Contractor

Ensure remedial measures are properly implemented

Consider and instruct, if necessary, the Contractor to slow down or to stop all or part of the works in the case of a serious non-conformity until situation rectified.

Amend working methods

Rectify damage and undertake any necessary replacement

Note:      (1) ET - Environmental Team, IEC - Independent Environmental Checker;

(2) According to EM&A Manual Table 5.4.

 

Event / Action Plan for Construction/Operational Phase for Ecology Issues (Landscape and Visual)

Action Level

ET(1)

IEC(1)

ER(1)

Contractor

Non-conformity  on one occasion

1. Identify Source

2. Inform the IEC and the ER

3. Discuss remedial actions with the IEC, the ER and the Contractor

4. Monitor remedial actions until rectification has been completed

1. Check report

2. Check the Contractor's working method

3. Discuss with the ET and the Contractor on possible remedial measures

4. Advise the ER on effectiveness of proposed remedial measures.

5. Check implementation of remedial measures.

1. Notify Contractor

2. Ensure remedial measures are properly implemented

1. Amend working methods

2. Rectify damage and undertake any necessary replacement

Repeated Non-conformity

1. Identify Source

2. Inform the IEC and the ER

3. Increase monitoring frequency

4. Discuss remedial actions with the IEC, the ER and the Contractor

5. Monitor remedial actions until rectification has been completed

6. If exceedance stops, cease additional monitoring

1. Check monitoring report

2. Check the Contractor's working method

3. Discuss with the ET and the Contractor on possible remedial measures

4. Advise the ER on effectiveness of proposed remedial measures

5. Supervise implementation of remedial measures.

1. Notify the Contractor

2. Ensure remedial measures are properly implemented

1. Amend working methods

2. Rectify damage and undertake any necessary replacement

Note:      (1) ET - Environmental Team, IEC - Independent Environmental Checker;

(2) According to EM&A Manual Table 6.4.


Event / Action Plan for Construction Phase for Heritage Issue

Action Level

ET(1)

IEC(1)

ER(1)

Contractor

Non-conformity  on one occasion

1. Identify Source

2. Inform the IEC and the ER

3. Discuss remedial actions with the IEC, the ER and the Contractor

4. Monitor remedial actions until rectification has been completed

1. Check report

2. Check the Contractor's working method

3. Discuss with the ES and the Contractor on possible remedial measures

4. Advise the ER on effectiveness of proposed remedial measures.

5. Check implementation of remedial measures.

 

1.  Notify Contractor

2.     Ensure remedial measures are properly implemented

 

1.     Amend working methods

2.     Rectify damage and undertake any necessary replacement

Repeated Non-conformity

1. Identify Source

2. Inform the IEC and the ER

3. Increase monitoring frequency

4. Discuss remedial actions with the IEC, the ER and the Contractor

5. Monitor remedial actions until rectification has been completed

6. If exceedance stops, cease additional monitoring

1. Check monitoring report

2. Check the Contractor's working method

3. Discuss with the ES and the Contractor on possible remedial measures

4. Advise the ER on effectiveness of proposed remedial measures

5. Supervise implementation of remedial measures.

1.     Notify the Contractor

2.     Ensure remedial measures are properly implemented

1.     Amend working methods

2.     Rectify damage and undertake any necessary replacement

Note:      (1) ET - Environmental Team, IEC - Independent Environmental Checker;

(2) According to EM&A Manual Table 7.


Appendix F1 Equipment Calibration Certificates (Noise Monitoring)

Noise Monitoring Equipment Record

Monitoring Date

Model

Equipment

Serial No.

02 May 2023

CEL-63X Series

Sound Level Meter

1488306

CEL-120/1

Sound Calibrator

2525984

09 May 2023

CEL-63X Series

Sound Level Meter

1488314

CEL-120/1

Sound Calibrator

5230950

16 May 2023

CEL-63X Series

Sound Level Meter

1488314

CEL-120/1

Sound Calibrator

5230950

23 May 2023

CEL-63X Series

Sound Level Meter

1488306

CEL-120/1

Sound Calibrator

2383707

30 May 2023

CEL-63X Series

Sound Level Meter

1488306

CEL-120/1

Sound Calibrator

2383707

 

 


 

Appendix F2 Equipment Calibration Certificates (Water Quality Monitoring)



Appendix G Environmental Monitoring Schedule

Tentative Impact Monitoring Schedule (May 2023)

Sun

Mon

Tue

Wed

Thu

Fri

Sat

 

1

2

3

4

5

6

 

 

W & N

 

W

 

W

7

8

9

10

11

12

13

 

 

W & N

 

W

 

W

14

15

16

17

18

19

20

 

 

W & N

 

W

 

W

21

22

23

24

25

26

27

 

 

W & N

 

W

 

W

28

29

30

31

 

 

 

¡@

¡@

W & N

 

 

 

 

 

Tentative Impact Monitoring Schedule (June 2023)

Sun

Mon

Tue

Wed

Thu

Fri

Sat

 

 

 

 

1

2

3

 

 

 

 

W

 

W

4

5

6

7

8

9

10

 

 

W & N

 

W

 

W

11

12

13

14

15

16

17

 

 

W & N

 

W

 

W

18

19

20

21

22

23

24

 

 

W & N

 

W

 

W

25

26

27

28

29

30

 

 

 

W & N

 

W

 

 

 

Tentative Impact Monitoring Schedule (July 2023)

Sun

Mon

Tue

Wed

Thu

Fri

Sat

 

 

 

 

 

 

1

 

 

 

 

 

 

W

2

3

4

5

6

7

8

 

 

W & N

 

W

 

W

9

10

11

12

13

14

15

 

 

W & N

 

W

 

W

16

17

18

19

20

21

22

 

 

W & N

 

W

 

W

23/30

24/31

25

26

27

28

29

 

 

W & N

 

W

 

W

 

Tentative Impact Monitoring Schedule (August 2023)

Sun

Mon

Tue

Wed

Thu

Fri

Sat

 

 

1

2

3

4

5

 

 

W & N

 

W

 

W

6

7

8

9

10

11

12

 

 

W & N

 

W

 

W

13

14

15

16

17

18

19

 

 

W & N

 

W

 

W

20

21

22

23

24

25

26

 

 

W & N

 

W

 

W

27

28

29

30

31

 

 

 

 

W & N

 

W

 

 

 

Remarks

1.     W: Impact Water Quality Monitoring.

2.     N: Impact Noise Monitoring.

3.     Actual monitoring may be subjected to change due to any safety concern or adverse weather condition, etc.


 

Appendix H1 Noise Monitoring Data and Graphical Presentations

Monitoring Location :

NSR1 Columbarium of Po Lin Monastery

Date

Weather

Wind Speed
(m/s)

Start Time

Noise Monitoring (in dB(A))

Leq(30 min)

L90(30 min)

L10(30 min)

02-05-2023

Fine

0.2

11:45

63.2

61.5

66.5

09-05-2023

Cloudy

0.5

11:06

61.4

60.5

62.5

16-05-2023

Fine

0.3

12:41

65.3

60.0

70.5

23-05-2023

Cloudy

0.3

11:48

63.9

63.5

65.0

30-05-2023

Fine

0.2

11:50

64.3

61.5

67.0

Monitoring Location :

NSR5 Village House No. 49A

Date

Weather

Wind Speed
(m/s)

Start Time

Noise Monitoring (in dB(A))

Leq(30 min)

L90(30 min)

L10(30 min)

02-05-2023

Fine

0.2

10:10

57.7

50.5

59.0

09-05-2023

Cloudy

0.4

9:47

49.4

48.5

50.0

16-05-2023

Fine

0.5

11:20

57.6

56.0

59.0

23-05-2023

Cloudy

0.3

10:05

64.6

62.0

66.5

30-05-2023

Fine

0.3

9:56

65.4

62.5

66.5

Monitoring Location :

NSR8 Village House No. 34

Date

Weather

Wind Speed
(m/s)

Start Time

Noise Monitoring (in dB(A))

Leq(30 min)

L90(30 min)

L10(30 min)

02-05-2023

Fine

0.3

9:13

53.1

49.5

55.0

09-05-2023

Cloudy

0.8

9:10

52.2

43.5

55.5

16-05-2023

Fine

0.4

10:22

54.0

48.0

56.0

23-05-2023

Cloudy

0.2

9:00

56.6

54.5

60.0

30-05-2023

Fine

0.3

9:00

57.1

55.0

60.5

 

 

Noise Monitoring (in dB(A))

 

Min
Leq
(30 min)

Max
Leq
(30 min)

NSR1

61.4

65.3

NSR5

49.2

65.4

NSR8

52.2

57.1

 

 

Remarks:

1) NSR1 & NSR5 noise results were calculated by +3 dB (A) correction for free-field measurement.

   

Note:

1)    Major activities being carried out on site during the reporting period refer to section 1.4.

2)    The other factors influencing the monitoring results refer to section 5.5.3.

3)    The QA/QC procedures and detection Limits refer to section 5.1 and 5.2.

 


Appendix H2 Water Quality Monitoring Data and Graphical Presentations


Monitoring Results Summary

Parameter(s)

 

 

Station(s)

DO in mg/L

Turbidity in NTU

pH

Suspended Solids in mg/L

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

Min

-

Max

(

Mean

)

WS1-R1

7.82

-

7.82

(

7.82

)

6.60

-

6.60

(

6.60

)

7.00

-

7.00

(

7.00

)

8.50

-

8.50

(

8.50

)

WS1-I1

7.39

-

8.86

(

8.12

)

1.00

-

6.90

(

3.13

)

6.80

-

7.00

(

6.90

)

1.00

-

13.50

(

4.36

)

WS1-R2

7.22

-

8.67

(

7.89

)

0.75

-

9.70

(

3.38

)

6.70

-

7.00

(

6.86

)

1.00

-

15.00

(

6.04

)

WS1-I2

7.51

-

7.51

(

7.51

)

6.40

-

6.40

(

6.40

)

7.10

-

7.10

(

7.10

)

5.00

-

5.00

(

5.00

)

WS4-R3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WS4-I3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WS5-R4

6.76

-

7.71

(

7.14

)

1.80

-

20.50

(

9.80

)

7.00

-

7.10

(

7.07

)

1.00

-

24.00

(

6.64

)

WS5-I4

6.75

-

7.25

(

6.88

)

5.90

-

22.60

(

15.03

)

7.00

-

7.20

(

7.13

)

2.00

-

145.00

(

56.63

)

WS6-R5

6.40

-

6.40

(

6.40

)

10.30

-

10.30

(

10.30

)

7.00

-

7.00

(

7.00

)

21.50

-

21.50

(

21.50

)

WS6-I5

6.32

-

7.44

(

6.75

)

1.30

-

12.30

(

6.58

)

6.90

-

7.10

(

6.98

)

2.00

-

135.00

(

38.60

)

WS6-C1

4.00

-

7.30

(

6.21

)

0.10

-

37.30

(

4.33

)

6.10

-

7.60

(

6.82

)

1.00

-

16.50

(

2.65

)

WS6-R6

6.50

-

7.90

(

7.08

)

1.00

-

19.90

(

5.13

)

6.90

-

7.20

(

7.01

)

1.00

-

42.50

(

8.64

)

WS6-I6

6.60

-

7.80

(

7.11

)

1.00

-

20.50

(

5.31

)

6.90

-

7.20

(

7.03

)

1.00

-

40.00

(

6.18

)

 

Laboratory Duplicate, Quality Assurance/Quality Control Summary extract form Lab test report

Total suspended solids dried at 103oC ¡V 105oC

Sampling Date

Detection Limit

Blank

Spike recovery (%)

Original result

Duplicate result

RPD%

02/05/2023

1mg/L

<1

101.60

8.68

7.72

11.71

04/05/2023

1mg/L

<1

97.77

1.02

1.07

4.78

06/05/2023

1mg/L

<1

102.10

3.30

3.40

2.99

09/05/2023

1mg/L

<1

101.75

0.90

1.08

18.18

11/05/2023

1mg/L

<1

104.20

0.52

0.56

7.41

13/05/2023

1mg/L

<1

98.80

1.16

1.20

3.39

16/05/2023

1mg/L

<1

98.65

2.95

2.70

8.85

18/05/2023

1mg/L

<1

97.43

0.58

0.69

17.76

20/05/2023

1mg/L

<1

101.62

1.62

1.53

5.77

23/05/2023

1mg/L

<1

95.80

17.10

16.50

3.57

1 mg/L

<1

98.80

13.50

11.90

12.60

25/05/2023

1mg/L

<1

98.55

1.02

1.00

1.98

27/05/2023

1mg/L

<1

99.62

0.42

0.49

15.38

30/05/2023

1mg/L

<1

97.90

46.63

44.12

5.53


 

Parameter Exceedance Summary

Monitoring Date

Monitoring Location

Exceedance Parameter

Monitoring Results

Action Level(AL)

Limit Level(LL)

Project-related?

--

--

--

--

--

--

--

 

Monitoring Location Dried up Summary

Date / Location

WS1-R1

WS1-I1

WS1-R2

WS1-I2

WS4-R3

WS4-I3

WS5-R4

WS5-I4

WS6-R5

WS6-I5

WS6-C1

WS6-R6

WS6-I6

2 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

 

 

4 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

Dried Up

Dried Up

6 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

Dried Up

Dried Up

9 May 2023

Dried Up

 

 

Dried Up

Dried Up

Dried Up

 

Dried Up

Dried Up

 

 

 

 

11 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

 

 

13 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

 

 

16 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

 

 

18 May 2023

Dried Up

 

 

Dried Up

Dried Up

Dried Up

 

 

Dried Up

 

 

 

 

20 May 2023

Dried Up

 

 

Dried Up

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

 

 

 

23 May 2023

 

 

 

 

Dried Up

Dried Up

 

 

 

 

 

 

 

25 May 2023

Dried Up

 

 

Dried Up

Dried Up

Dried Up

 

 

Dried Up

 

 

 

 

27 May 2023

Dried Up

 

 

Dried Up

Dried Up

Dried Up

 

 

Dried Up

 

 

 

 

30 May 2023

Dried Up

Dried Up

 

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

Dried Up

 

 

 

Note:

1)    Major activities being carried out on site during the reporting period refer to section 1.4.

2)    The other factors influencing the monitoring results refer to section 5.5.4.

3)    The QA/QC procedures and detection Limits refer to section 5.1 and 5.2.

 


Appendix I Statistics on Exceedances, Complaints, Notifications of Summons and Prosecutions

Statistics on Monitoring Exceedance (Reporting Month)

Reporting Period

No. of Exceedance

AL

LL

No. of Exceedance This Month

Noise

0

0

Water Quality

pH

0

0

DO

0

0

Turbidity

0

0

Suspended Solids

0

4

 

 

Statistics on Complaints, Notifications of Summons and Successful Prosecutions

Reporting Period

Complaints

Notifications of Summons

Successful Prosecutions

No. of Complaints , Notifications of Summons and Successful Prosecutions This Month

0

0

0

Cumulative Project-to-Date

0

0

0

 

Environmental Complaints Log

Complaint Log No.

Date of Complaint Received

Received From

Received By

Nature of Complaint

Investigation/Mitigation Action

Status

NIL

--

--

--

--

--

--

Remark:

(1)     No Complaints, Notifications of Summons or Successful Prosecutions was received in the reporting period.


 

Appendix I2 Investigation Report on Limit Level of Non-compliance


Appendix J Weather Condition

 

Date

Mean Pressure (hPa)

Air Temperature

Mean Dew Point (deg. C)

Mean Relative Humidity (%)

Mean Amount of Cloud (%)

Total Rainfall (mm)

Absolute Daily Max (deg. C)

Mean (deg. C)

Absolute Daily Min (deg. C)

May 2023

1

1014.2

26.1

24.1

23.0

19.9

78

87

0.3

2

1015.2

26.9

24.1

22.7

19.1

74

81

0.0

3

1013.4

29.1

25.4

23.6

22.5

84

79

0.1

4

1008.8

31.0

27

25.4

23.9

84

74

0.0

5

1005.8

30.2

27.5

25.5

23.7

80

66

0.0

6

1004.4

29.7

28.2

26.9

24.8

82

85

0.0

7

1006.0

30.3

26.6

23.4

24.0

86

88

35.5

8

1011.0

24.8

23.2

21.9

21.1

88

88

39.2

9

1013.2

26.5

23.8

22.3

19.7

78

82

0.1

10

1013.7

25.3

23.9

23.0

18.1

70

88

0.0

11

1014.7

25.8

23.9

22.2

19.2

76

88

0.5

12

1014.8

25.7

24.4

23.8

20.0

77

88

Trace

13

1013.8

25.3

23.5

22.3

20.8

85

89

9.5

14

1011.6

23.1

21.3

20.2

20.2

93

94

39.9

15

1010.4

27.1

24.3

21.9

21.4

84

83

0.1

16

1009.6

27.3

25.2

23.1

22.9

87

81

0.4

17

1007.9

28.9

26.9

23.7

24.9

89

88

32.7

18

1006.9

31.4

28.9

27.5

25.7

83

63

0.0

19

1007.7

31.3

29.1

27.4

25.6

82

67

0.0

20

1008.5

32.7

29.7

28.0

25.9

80

76

Trace

21

1009.0

32.2

29.7

28.0

25.6

79

78

1.5

22

1008.1

33.0

30

28.1

25.2

76

83

0.0

23

1009.1

29.2

26.9

24.4

24.7

88

93

8.3

24

1010.5

28.2

24.9

23.3

22.7

88

93

14.5

25

1012.0

26.9

26.1

24.9

24.0

89

88

Trace

26

1011.9

30.9

27.8

26.4

25.3

87

85

0.2

27

1010.4

32.3

28.8

26.7

25.1

81

60

0.0

28

1009.8

32.5

28.7

27.0

23.7

75

47

Trace

29

1008.0

32.3

28.9

26.3

23.5

73

18

0.0

30

1004.0

34.6

31.2

28.0

25.9

74

14

0.0

31

1002.1

34.7

31.4

29.6

26.8

77

37

Trace

Trace means rainfall less than 0.05 mm

Source: Hong Kong Observatory