West Kowloon Reclamation

Contract No. WK30

Remaining Roadwork Stage 4 – Link Roads G & L

Environmental Impact Assessment

 

CONTENT

 

                                                                                                                                    Page No.

 

1.         INTRODUCTION                                                                                                  1- 1

1.1          Background of the Project                                                                          1- 1

1.2          The Approach                                                                                           1- 2

1.3          Objectives of the EIA                                                                                1- 3

1.4          EIA Study Area                                                                                        1- 3

1.5          Arrangement of the EIA Report                                                                 1- 4

 

2.         DESCRIPTION OF THE PROJECT                                                                      2 - 1

2.1          Planning Overview                                                                                   2 - 1

            2.2          Link Road G & L                                                                                     2 - 1

            2.3          Technical Requirements                                                                            2 - 1

2.4          Site Location and Site History                                                                    2 - 2

2.5          Nature, scope and Benefits of the Project                                                  2 - 2

2.6          Scale of the Project                                                                                  2 - 2

2.7          Project Timetable and Phasing of the Project                                              2 - 2

2.8          Means by which the Project will be Implemented                                        2 - 2

2.9          Scope and Duration of Construction Activities                                            2 - 2

2.10        Background and History of the Project                                                       2 - 3

2.11        Description of Scenarios without the Project                                               2 - 3

 

3.         AIR QUALITY                                                                                                     3 - 1

            3.1          Introduction                                                                                              3 - 1

            3.2          Legislation and Standards                                                                          3 - 1

                          3.2.1     Environmental Impact Assessment Ordinance                                3 - 1

            3.3          Baseline Conditions                                                                                   3 - 2

            3.4          Air Sensitive Receivers                                                                             3 - 2

            3.5          Construction Phase                                                                                   3 - 3

                          3.5.1     Potential Sources of Impact                                                           3 - 3

                          3.5.2     Construction Dust Assessment Methodology                                  3 - 3

                          3.5.3     Evaluation of Impact                                                                     3 - 4

                          3.5.4     Recommended Mitigation Measures                                               3 - 5

                          3.5.5     Residual Impacts                                                                          3 - 6

                          3.5.6     EM&A Requirement                                                                     3 - 6

                          3.5.7     Conclusions                                                                                  3 - 7

            3.6          Operational Phase                                                                                    3 - 7

                          3.6.1     Potential Source of Impact                                                            3 - 7

                          3.6.2     Assessment Methodology                                                              3 - 7

                          3.6.3     Evaluation of Impacts                                                                   3 – 8

                          3.6.4     Environmental Implications                                                            3 - 8

                          3.6.5     Residual Impacts                                                                          3 - 8

                          3.6.6     EM&A Requirement                                                                     3 - 8

                          3.6.7     Conclusions                                                                                  3 - 9


                                                                                                                                    Page No.

 

4.         NOISE IMPACT                                                                                                   4 - 1

4.1          Introduction                                                                                              4 - 1

4.2          Governmental Legislation and Standards                                                    4 - 1

4.2.1     Construction Noise                                                                        4 - 1

4.2.2     Percussive Piling                                                                           4 - 1           

4.2.3     General Construction Works                                                          4 - 2

4.2.4     Operational Phase                                                                         4 - 3

4.2.5     Baseline Condition                                                                        4 - 4

4.2.6     Noise Sensitive Receivers                                                             4 - 5

4.3          Construction Phase                                                                                   4 - 6

4.3.1     Assessment Methodology                                                             4 - 6

4.3.2     Evaluation of Impacts                                                                   4 - 7

4.3.3     Mitigation Measures                                                                     4 - 8

4.4          Operational Phase                                                                                   4 - 10

4.4.1     Road Traffic Noise                                                                     4 - 10

4.4.2     Noise Sensitive Receivers                                                            4 - 10

4.4.3     Assessment Methodology                                                            4 - 11

4.4.4     Evaluation of Impacts                                                                  4 - 12

4.4.5     Environmental Implications                                                          4 -13

4.5          Conclusion                                                                                              4 - 13

4.5.1     Construction Phase                                                                     4 - 13

4.5.2     Operational Phase                                                                       4 - 13

 

5.         WASTE MANAGEMENT                                                                                     5 - 1

            5.1          Introduction                                                                                              5 - 1

            5.2          Environmental Legislation and Standards                                                    5 - 1

                          5.2.1     Legislation                                                                                    5 - 1

                          5.2.2     Guidelines                                                                                     5 - 1

            5.3          Assessment Methodology                                                                          5 - 2

                          5.3.1     General                                                                                        5 - 2

            5.4          Construction Waste Impact                                                                       5 - 2

                          5.4.1     Potential Sources of Impact                                                           5 - 2

                          5.4.2     Site Clearance Waste                                                                    5 - 2

                          5.4.3     Excavated Materials                                                                     5 - 2

                          5.4.4     Construction and Demolition Waste                                                5 - 3

                          5.4.5     Chemical Waste                                                                           5 - 3

                          5.4.6     General Refuse                                                                             5 - 3

            5.5          Evaluation of Impacts                                                                               5 - 3

                          5.5.1     Site Clearance Waste                                                                    5 - 4

                          5.5.2     Excavation Material                                                                      5 - 4

                          5.5.3     Construction and Demolition Waste                                                5 - 4

                          5.5.4     Chemical Waste                                                                           5 - 5

                          5.5.5     General Refuse                                                                             5 - 5

            5.6          Mitigation Measures                                                                                 5 - 5

                          5.6.1     Introduction                                                                                  5 - 5

                          5.6.2     Waste Management Hierarchy                                                      5 - 6

                          5.6.3     Storage, Collection and Transport of Waste                                    5 - 6

                          5.6.4     Excavated/Imported Filling Material                                               5 - 6

                          5.6.5     Construction & Demolition Waste                                                  5 - 7

                          5.6.6     Chemical Waste                                                                           5 - 8

                          5.6.7     General Refuse                                                                             5 - 8

            5.7          Environmental Monitoring and Audit Requirements                                     5 - 9

            5.8          Conclusions                                                                                              5 - 9


                                                                                                                                    Page No.

 

6.         ENVIRONMENTAL MONITORING & AUDIT                                                   6 - 1

            6.1          Construction Phase                                                                                   6 - 1

                          6.1.1     Air                                                                                               6 - 1

                          6.1.2     Noise                                                                                           6 - 1

                          6.1.3     Waste Management                                                                      6 - 2

            6.2          Operational Noise                                                                                     6 - 3

                          6.2.1     Noise                                                                                           6 - 3

                          6.2.2     Noise Parameters                                                                         6 - 3

                          6.2.3     Monitoring Equipment                                                                   6 - 3

                          6.2.4     Monitoring Locations                                                                     6 - 3

                          6.2.5    Comparison of Measured and Modelled Results                              6 - 4

                         

7.         CONCLUSIONS AND RECOMMENDATIONS                                                   7 - 1

            7.1          Air                                                                                                           7 - 1

            7.2          Noise                                                                                                       7 - 1

            7.3          Wastes                                                                                                    7 - 2

            7.4          Recommendations                                                                                    7 - 2

            7.5          Summary of Environmental Outcome                                                         7 - 2

 

8.         IMPLEMENTATION SCHEDULE                                                                        8 - 1

 

 

LIST OF TABLES

 

3.1       Hong Kong Air Quality Objectives (mm-3)

3.2       Background Air Quality

3.3       Representative Air Sensitive Receivers

3.4       Emission Factors for Various Construction Activities

3.5       Predicted Hourly and Daily TSP Levels (mm-3)

3.6       Mitigated Hourly and Daily TSP Levels (mm-3)

3.7       Predicted Air Quality Impacts (mm-3)

 

4.1       Permitted Hours of Operation for Percussive Piling

4.2       EIAO-TM Daytime Construction Noise Standards (Leq30 min dB(A))

4.3       Acceptable Noise Levels (ANL, Leq30 min dB(A))

4.4       EIAO-TM Road Traffic Noise Planning Criteria

4.5       Location of Noise Sensitive Receivers - Construction Phase

4.6       Cumulative Noise Impacts (No Mitigation Measures for Link Roads G & L) - (Leq30 min dB(A))

4.7       Sound Power Levels for Specific Silenced PME

4.8       Cumulative Noise Impacts - With use of quiet plant for Link Roads G & L  (Mitigation 1) - (Leq30 min dB(A))

4.9       Location of Noise Sensitive Receivers - Operational Phase


 

LIST OF TABLES (CONT’D)

 

6.1       Air Monitoring Locations

6.2       Noise Monitoring Station

6.3       Operational Noise Monitoring Stations

 

 

LIST OF FIGURES

 

1.1               Study Area

2.1               Construction Programme

3.1(a)&(b)   Locations of Air Sensitive Receivers

3.2(a)          Hourly NO2 Concentration Isopleths at Ground Level                                       

3.2(b)          Daily RSP Concentration Isopleths at Ground Level

4.1(a)&(b)   Locations of Noise Sensitive Receivers

4.2(a)          Master Layout Plan of Site 10

4.2(b)          Typical Floor Plan – Site 10

4.2(c)          Diagrammatic Section Plan for Site 10

4.2(d)          Master Layout Plan of KMB CDA Site

4.2(e)          Diagrammatic Section Plan for KMB CDA Site

4.2(f)           Typical Floor Plan – Block 1 of KMB CDA Site

4.2(g)          Typical Floor Plan – Blocks 2 & 3 of KMB CDA Site

4.2(h)          Typical Floor Plan – Block 4 of KMB CDA Site

4.3(a)          Direct Noise Mitigation Measures (Route 16)

4.3(b)          Direct Noise Mitigation Measures (Route 9)

4.3(c)          Direct Noise Mitigation Measures (West Kowloon Highway)

 

ANNEXES

 

A                Traffic Forecast

B                 Emission Factors for NO2 & RSP

C                 Samples of Air Modelling Input & Output Files (FDM & CALINE4)

D                Plant Inventory

E                 Calculation of Construction Noise

F                 Road Traffic Noise Modelling Results

G                 Samples of Road Traffic Noise Modelling Input

H                Correspondence from Transport Department

I                  Correspondence from Planning Department

J                  Comments and Response for Draft EIA Report

K                Environmental Outcome Profile