|
EXECUTIVE SUMMARY |
Section Contents Pages.
1. INTRODUCTION
1-1
2. SUMMARY OF THE EIA (DE) STUDY
2-1
3. SUMMARY OF ENVIRONMENTAL ASSESSMENTS
3-1
List of Figure
Figure
1.2a |
Elements for the
yuen long and kam tin sewerage and sewage disposal stage i |
Figure
1.2b |
Study Area of
designated and potentially designated elements of the project |