1. INTRODUCTION
1.1 Description of the Project
1.2 Enhancement Measures to Control Emergency Discharge
1.3 Concurrent Projects
1.4 Objectives of Environment Impact Assessment
1.5 Purpose of this EIA Report
1.6 Structure of this EIA Report
2. REVIEW OF CHEMICALS FOR CEPT AND POTENTIAL DISINFECTION OPTIONS
2.1 Introduction
2.2 Review of Chemicals for CEPT
2.3 Review of Potential Disinfection Options and Their Implications for San Wai STW
2.4 Conclusions
3. AIR QUALITY IMPACT
3.1 Introduction
3.2 Environmental Legislation, Policies, Plans, Standards and Criteria
3.3 Description of the Environment
3.4 Air Sensitive Receivers
3.5 Enhancement Measures to Control Emergency Discharge
3.6 Assessment Methodology
3.7 Identification of Environmental Impacts
3.8 Prediction and Evaluation of Environmental Impacts
3.9 Mitigation of Adverse Environmental Impacts
3.10 Evaluation of Residual Impacts
3.11 Environmental Monitoring and Audit
3.12 Conclusions
4. NOISE IMPACT
4.1 Introduction
4.2 Environmental Legislation, Policies, Plans, Standards and Criteria
4.3 Description of the Environment
4.4 Noise Sensitive Receivers
4.5 Enhancement Measures to Control Emergency Discharge
4.6 Assessment Methodology
4.7 Identification of Environmental Impacts
4.8 Prediction and Evaluation of Environmental Impacts
4.9 Mitigation of Adverse Environmental Impacts
4.10 Evaluation of Residual Impacts
4.11 Environmental Monitoring and Audit
4.12 Conclusions
5. WATER QUALITY IMPACT
5.1 Introduction
5.2 Environmental Legislation, Policies, Plans, Standards and Criteria
5.3 Description of the Environment
5.4 Water Sensitive Receivers
5.5 Assessment Methodology
5.6 Operational Phase Impact Assessment
5.7 Identification of Environmental Impacts
5.8 Prediction and Evaluation of Environmental Impacts and Mitigation Measures
5.9 Evaluation of Residual Impacts
5.10 Conclusions
6. WASTE MANAGEMENT IMPLICATIONS
6.1 Introduction
6.2 Environmental Legislation, Policies, Plans, Standards and Criteria
6.3 Assessment Methodology
6.4 Construction Waste Assessment
6.5 Operational Waste Assessment
6.6 Mitigation of Adverse Impacts
6.7 Evaluation of Residual Impacts
6.8 Conclusions
7. LAND CONTAMINATION IMPACT
7.1 Introduction
7.2 Environmental Legislation, Policies, Plans, Standards and Criteria
7.3 Assessment Methodology
7.4 Baseline Conditions
7.5 Site History
7.6 Site Inspection
7.7 Prediction and Evaluation of Environmental Impacts
7.8 Contamination Assessment Plan
7.9 Conclusions
8. ECOLOGICAL IMPACT
8.1 Introduction
8.2 Legislation, Policies, Plans, Standards and Criteria
8.3 Recognised Sites of Conservation Importance
8.4 Assessment Methodology
8.5 Baseline Conditions
8.6 Evaluation of Habitats and Species
8.7 Impact Identification and Assessment
8.8 Mitigation Measures
8.9 Cumulative Impacts
8.10 Residual Impacts
8.11 Additional Enhancement Measure
8.12 Conclusion
8.13 References
9. FISHERIES IMPACT
9.1 Introduction
9.2 Legislation, Policies, Plans, Standards and Criteria
9.3 Methodology
9.4 Baseline Conditions
9.5 Fisheries Importance and Sensitive Receivers
9.6 Impact Identification and Assessment
9.7 Mitigation Measures
9.8 Fisheries Monitoring and Audit
9.9 Conclusion
9.10 References
10. CULTURAL HERITAGE ASSESSMENT
10.1 Introduction
10.2 Legislation, Standards, Guidelines and Criteria
10.3 Assessment Methodology
10.4 Desktop Study
10.5 Historic Buildings at San Sang Tsuen
10.6 The Tseung Kong Wai Site
10.7 The Tseung Kong Wai So Kwun Tsai Site
10.8 Survey at Hau Tsz Shan, San Uk Tsuen and San Wai
10.9 Assessment and Mitigation Measures
10.10 Conclusion
10.11 References
11. LANDSCAPE AND VISUAL IMPACT
11.1 Legislation and Standards
11.2 Assessment Methodology
11.3 Review of Planning Development Control Framework
11.4 Assessment Results for Ha Tsuen Pumping Station
11.5 Assessment Results for San Wai Sewage Treatment Works
11.6 Funding, implementation, management and maintenance
11.7 Summary of Landscape Impacts
11.8 Conclusions
12. ENVIRONMENTAL MONITORING AND AUDIT
13. SUMMARY OF ENVIRONMENTAL OUTCOME
13.1 Air Quality Impact
13.2 Noise Impact
13.3 Water Quality Impact
13.4 Waste Management Implications
13.5 Land Contamination Impact
13.6 Ecological Impact
13.7 Fisheries Impact
13.8 Cultural and Heritage Impact
13.9 Landscape and Visual Impact
13.10 Summary of Options Review
APPENDICES
Appendix 2A Review of Recent Studies and Trials on Chemicals for CEPT and Potential Disinfection Options
Appendix 3A Details of Construction Phase Air Quality Assessment
Appendix 3B Details of Operational Phase Air Quality Assessment
Appendix 4A Details of Construction Phase Noise Assessment
Appendix 4B Details of Operational Phase Noise Assessment
Appendix 5A Pollution Loading Inventory
Appendix 6A Construction and Demolition Materials Management Plan
Appendix 8 Details of Ecological Data
Appendix 12A Implementation Schedule of Recommended Mitigation Measures
Figures