Tai Po Sewage Treatment Works – Stage V
Final Environmental Impact Assessment Report (Volume 1)
TABLE OF CONTENT
1.1 Background to the Study
1.2 Objective and Approach of the EIA Study
1.3 Scope of the EIA report
1.4 Report Structure
2.1 Introduction
2.2 Project Location and Site History
2.3 Project Design
2.4 Basis of Project Design
2.5 Treated Effluent and Dry Solid Standards
2.6 Scope of Works
2.7 Works Programme
2.8 Other Related Projects
3.1 Introduction
3.2 Environmental Legislation, Policies, Plans, Standards and Criteria
3.3 Description of the Environment
3.4 Identification of Environmental Impacts
3.5 Assessment Methodology
3.6 Prediction and Evaluation of Impacts
3.7 Mitigation of Adverse Environmental Impacts
3.8 Evaluation of Residual Impacts
3.9 Environmental Monitoring and Audit
3.10 Conclusions
4.1 Introduction
4.2 Environmental Legislation, Policies, Plans, Standards and Criteria
4.3 Description of the Environment
4.4 Water Sensitive Receivers
4.5 Assessment Methodology
4.6 Identification of Environmental Impacts
4.7 Prediction and Evaluation of Impacts
4.8 Mitigation of Adverse Environmental Impacts
4.9 Evaluation of Residual Impact
4.10 Environmental Monitoring and Audit
4.11 Conclusions
5 WASTE MANAGEMENT IMPLICATIONS
5.1 Introduction
5.2 Environmental Legislation, Policies, Plans, Standards and Criteria
5.3 Assessment Methodology and Criteria
5.4 Identification of Evaluation of Environmental Impacts
5.5 Mitigation Measures
5.6 Evaluation of Residual Impacts
5.7 Environmental Audit Requirements
5.8 Conclusions
6.1 Introduction
6.2 Environmental Legislation, Policies, Plans, Standards and Criteria
6.3 Description of the Environment
6.4 Qualitative Landfill Gas Assessment
6.5 Site Categorisation
6.6 Recommended Precautionary Measures
6.7 Conclusions
7.1 Introduction
7.2 Environmental Legislation, Policies, Plans, Standards and Criteria
7.3 Description of the Environment
7.4 Assessment Methodology
7.5 Identification of Environmental Impacts
7.6 Prediction and Evaluation of Environmental Impacts
7.7 Mitigation of Adverse Environmental Impacts
7.8 Evaluation of Residual Impacts
7.9 Construction Activities during Restricted Hours
7.10 Environmental Monitoring and Audit
7.11 Conclusions
8 ENVIRONMENTAL MONITORING AND AUDIT (EM&A) REQUIREMENTS
8.1 Introduction
8.2 Air Quality Impact
8.3 Water Quality Impact
8.4 Waste Management Implications
8.5 Landfill gas hazard
8.6 Noise Impact
9 CONCLUSIONS AND ENVIRONMENTAL OUTCOMES
9.1 Introduction
9.2 Air Quality Impact
8.3 Water Quality Impact
8.4 Waste Management Implications
8.5 Landfill Gas Hazard
8.6 Noise Impact
10 IMPLEMENTATION SCHEDULE OF THE PROPOSED MITIGATION MEASURES