Kowloon Canton Railway Corporation
KSL GSA 5100 Environmental Impact Assessment & Associated Services
Environmental Impact Assessment Report
Main Report
Ove
Arup & Partners Hong Kong Ltd
Level 5, Festival Walk, 80 Tat Chee
Avenue, Kowloon Tong, Kowloon, Hong Kong
Tel
+852 2528 3031 Fax +852 2268 3950
|
|||||||||||
KSL GSA 5100 Environmental
Impact Assessment & Associated Services |
|||||||||||
Environmental Impact Assessment
Report –
Volume 1 |
|||||||||||
|
|||||||||||
G:\env\project\23573\reports\EIA Reports\9th draft eia\23573-9.doc |
|||||||||||
Final |
6/1/05 |
Environmental
Impact Assessment Report |
|||||||||
|
|||||||||||
Various |
|||||||||||
|
|||||||||||
|
|
|
|||||||||
|
|||||||||||
|
|||||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|||||||||||
|
|||||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|||||||||||
|
|||||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
ü |
|
|||||||||
|
|
|
|||||||||
|
|||||||||||
|
CONTENTS
1. INTRODUCTION
2. STUDY SCOPE
3. SELECTION OF THE PREFERRED ALIGNMENT
4. CONSTRUCTION METHODOLOGIES FOR THE SELECTED
ROUTE ALIGNMENT
5. CONSTRUCTION DUST IMPACT ASSESSMENT
6. AIRBORNE NOISE IMPACT ASSESSMENT
7. GROUNDBORNE NOISE IMPACT ASSESSMENT
8. WATER QUALITY IMPACT ASSESSMENT
9.
WASTE MANAGEMENT IMPLICATIONS
10.
LAND CONTAMINATION ASSESSMENT
11. LANDSCAPE AND VISUAL IMPACT ASSESSMENT
12. CULTURAL HERITAGE IMPACT ASSESSMENT
14. ENVIRONMENTAL MONITORING AND AUDITING
REQUIREMENTS
15. SUMMARY OF ENVIRONMENTAL OUTCOMES
16. CONCLUSIONS
17. REFERENCES
LIST OF FIGURES
General Alignment |
|
Location of Concurrent Projects (1 of 2) |
|
Location of Concurrent Projects (2 of 2) |
|
|
|
Route Alignments Considered |
|
|
|
KSL Route Corridor Canton Road Scheme (1 of 3) |
|
KSL Route Corridor Canton Road Scheme (2 of 3) |
|
KSL Route Corridor Canton Road Scheme (3 of 3) |
|
|
|
KSL Route Corridor Kowloon Park Drive Scheme (1 of
3) |
|
KSL Route Corridor Kowloon Park Drive Scheme (2 of
3) |
|
KSL Route Corridor Kowloon Park Drive Scheme (3 of
3) |
|
|
|
KSL Route Corridor Kowloon Point Scheme (1 of 3) |
|
KSL Route Corridor Kowloon Point Scheme (2 of 3) |
|
KSL Route Corridor Kowloon Point Scheme (3 of 3) |
|
|
|
KSL Route Corridor Harbour City Scheme (1 of 3) |
|
KSL Route Corridor Harbour City Scheme (2 of 3) |
|
KSL Route Corridor Harbour City Scheme (3 of 3) |
|
|
|
Construction Methodology and Construction Area Plan
(1 of 3) |
|
Construction Methodology and Construction Area Plan
(2 of 3) |
|
Construction Methodology and Construction Area Plan
(3 of 3) |
|
|
|
Station Layout – WKN Plans (1 of 2) |
|
Station Layout – WKN Station Longitudinal Section (2
of 2) |
|
|
|
Interface Tunnel Section Near Nam Cheong |
|
|
|
Yau Mei Tai Ventilation Building |
|
|
|
Canton Road Plant Building |
|
|
|
Not Used |
|
|
|
Reprovisioned Subway for New World Subway No. 1 |
|
|
|
Peking Road Emergency Egress Point Plan and Section |
|
|
|
Locations of Footbridge 14 and Box Culverts JR, PS,
DS & WR |
|
|
|
Locations of Footbridges A & A1 |
|
|
|
Key of Air Sensitive Receivers |
|
|
|
Locations of Air Sensitive Receivers (1 of 3) |
|
Locations of Air Sensitive Receivers (2 of 3) |
|
Locations of Air Sensitive Receivers (3 of 3) |
|
|
|
Locations of Worksites, Stockpiles and Barging
Facility |
|
|
|
Recommended Watering Frequency |
|
|
|
Contours of Cumulative 1-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground (Mitigation
Scenario) (1 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground
(Mitigation Scenario) (2 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground
(Mitigation Scenario) (3 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground
(Mitigation Scenario) (4 of 4) |
|
|
|
Contours of Cumulative 24-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground (1 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground (2 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground (3 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration
(μg/m3) for Worst Case Scenario at 1.5m above ground (4 of 4) |
|
|
|
Key NSR of Airborne Noise Assessment |
|
|
|
Locations of Noise Sensitive Receivers (1 of 3) |
|
Locations of Noise Sensitive Receivers (2 of 3) |
|
Locations of Noise Sensitive Receivers (3 of 3) |
|
|
|
Sketch of Typical Temporary Noise Barrier /
Enclosure |
|
|
|
Specific Mitigation Measures for Particular PMEs at
Worksites in front of Man King Building and Olympian City Phase 3 |
|
|
|
NSRs for Construction Groundborne Noise |
|
|
|
Rock Head Levels near HKCC |
|
|
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (1 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (2 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (3 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (4 of 4) |
|
Proposed Trackform Location |
|
|
|
Locations of Water Sensitive Receivers |
|
Locations of Groundwater Sampling |
|
|
|
Possible Locations of Groundwater Recharge Wells (1
of 2) |
|
Possible Locations of Groundwater Recharge Wells (2
of 2) |
|
|
|
Locations of Excavated Marine Deposits Tested for
Biological Screening |
|
|
|
Area of Marine Sediment Subject to Type II Disposal
(1 of 3) |
|
Area of Marine Sediment Subject to Type II Disposal
(2 of 3) |
|
Area of Marine Sediment Subject to Type II Disposal
(3 of 3) |
|
|
|
Location of Drillhole of Contamination |
|
|
|
Extract of Kowloon Planning Area No.1 – Tsim Sha
Tsui Outline Zoning Plan (No. S/K1/18) |
|
Extract of Kowloon Planning Area No.20 - South West
Kowloon Outline Zoning Plan (No. S/K20/15) |
|
Extract of Shatin Planning Area No.18 - Shatin
Outline Zoning Plan (No. S/ST/19) |
|
|
|
Residual Landscape Resource Impacts in Construction
Phase |
|
Residual Landscape Resource Impacts in Operation
Phase |
|
Residual Landscape Character Impacts in Construction
Phase (Sheet 1 of 2) |
|
Residual Landscape Character Impacts in Construction
Phase (Sheet 2 of 2) |
|
Residual Landscape Character Impacts in Operation
Phase |
|
Residual Visual Impacts in Construction Phase (Sheet
1 of 2) |
|
Residual Visual Impacts in Construction Phase (Sheet
2 of 2) |
|
Residual Visual Impacts in Operation Phase |
|
Landscape and Visual Mitigation Measures in
Construction and Operation Phase – Key Plan |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Photomontage View Point Location |
|
Photomontages - PM1 (Sheet 1 of 2) Canton Road
Emergency Egress Point |
|
Photomontages - PM1 (Sheet 2 of 2) Canton Road
Emergency Egress Point |
|
Photomontages – PM2 (Sheet 1 of 2) Canton Road Plant
Building |
|
Photomontages – PM2 (Sheet 2 of 2) Canton Road Plant
Building |
|
Photomontages – PM3 (Sheet 1 of 2) WKN Station from
Proposed Road D1 |
|
Photomontages – PM3 (Sheet 2 of 2) WKN Station from
Proposed Road D1 |
|
Photomontages – PM4 (Sheet 1 of 2) WKN Station from
Jordan Road |
|
Photomontages – PM4 (Sheet 2 of 2) WKN Station from
Jordan Road |
|
Photomontages – PM5 (Sheet 1 of 2) Yau Ma Tei Vent
Building |
|
Photomontages – PM5 (Sheet 2 of 2) Yau Ma Tei Vent
Building |
|
Photomontages – PM5A and PM5B Yau Ma Tei Vent
Building |
|
Photomontages – PM6 (Sheet 1 of 2) Nam Cheong Park |
|
Photomontages – PM6 (Sheet 2 of 2) Nam Cheong Park |
|
|
|
Archaeological Background (1 of 2) |
|
Archaeological Background (2 of 2) |
|
|
|
Heritage Resources along Alignment (1 of 7) |
|
Heritage Resources (2 of 7) |
|
Heritage Resources (3 of 7) |
|
Heritage Resources (4 of 7) |
|
Heritage Resources (5 of 7) |
|
Heritage Resources (6 of 7) |
|
Heritage Resources (7 of 7) |
|
|
|
|
|
LIST OF APPENDICES |
|
Construction Plant Inventory |
|
Construction Programme |
|
|
|
Calculation of Dust Emission Factors |
|
Locations of Air Sensitive Receivers, Worksites
and Dust Emission Rates |
|
Dust Assessment Results (Unmitigated
Scenario for Construction of KSL) |
|
Dust Assessment Results (Mitigated
Scenario for Construction of KSL) |
|
Dust Assessment Results (Cumulative Dust
Concentrations for Both KSL and FMPHQ) |
|
|
|
Sound Power Levels of PMEs |
|
Locations of Notional Sources and Distance to
NSRs |
|
Results of Construction Noise Assessment (Unmitigated
Scenario) |
|
Summary of Mitigation Measures (good practice)
and Associated Noise Reduction |
|
Sound Power Levels of Quiet Plant |
|
Results of Construction Noise Assessment (Mitigated
Scenario) |
|
Assessment Results for Further Specific Noise
Mitigation Measures |
|
Calculations of Noise from Concurrent Projects |
|
Calculations of Noise During Restricted Hours |
|
Calculation of Maximum Allowable Sound Power
Levels |
|
|
|
Construction Groundborne Vibration Sources |
|
Sample Calculations for Construction
Groundborne Noise |
|
Details of Operational Groundborne Noise
Assessment |
|
|
|
Sewage Discharge Location |
|
|
|
Fill and Surplus Materials Forms |
|
Traffic Routes from Worksites to Barging
Facility |
|
|
|
Contamination Assessment Plan (Figure 1, 2, 3a, 3b, 4, 5, 6, 7, 8,
9, 10) |
|
Contamination Assessment Report and
Remediation Action Plan (Figures) |
|
|
|
Baseline Review |
|
Detailed Tree Survey |
|
|
|
Built Heritage Survey Catalogue |
|
Preliminary Built Heritage Condition Survey
Catalogue |
|
|
|
Environmental Mitigation Implementation
Schedule (Figure A14-1, A14-2, A14-3a, A14-3b, A14-4) |
|
|
|
Calculation of Reduction in Nitrogen Dioxide |
|
|
|
Environmental Implications of the Changes in
Gazettal Plans |
|
|
|
|
|
|
|
ABBREVIATION
ABWF |
Architectural
and builders works & finishes |
ADWF |
Average dry weather flow |
AEL |
Airport Express Line |
AMO
|
Antiquities
and Monuments Office |
ANL |
Acceptable
Noise Level |
APCO |
Air
Pollution Control Ordinance |
AQO
|
Air
Quality Objectives |
Arup |
Ove
Arup and Partners Hong Kong Ltd |
ASR |
Air
Sensitive Receiver |
BMP |
Best
Management Practice |
BNL |
Basic
Noise Level |
BOD5 |
5-day
Biochemical Oxygen Demand |
BTEX |
Benzene,
Toluen, Ethylbenzene and Xylene |
C&D |
Construction
and Demolition |
CAR |
Canton
Road Station |
CAP |
Contamination
Assessment Plan |
CDG |
Completely
Decomposed Granite |
CEDD |
Civil
Engineering and Development Department |
CLP |
China
Light Power |
CNP |
Construction
Noise Permit |
CRPB |
Canton Road Plant Building |
CWTC |
Chemical
Waste Treatment Centre |
D-wall |
Diaphragm
wall |
DO |
Dissolved
Oxygen |
EAP |
Emergency assembly point |
ECS |
Environmental
Control System |
EEP |
Emergency
Egress Point |
EIA |
Environmental
Impact Assessment |
EIAO |
Environmental
Impact Assessment Ordinance |
EM |
Environmental Manager |
EMP |
Environmental
Management Plan |
EMIS |
Environmental Mitigation Implementation Schedule |
EM&A |
Environmental
Monitoring and Audit |
EMU |
Electric
Multiple Units |
E&M |
Electrical
and mechanical |
EP |
Environmental
Permit |
EPD |
Environmental
Protection Department |
ER |
Engineer’s
Representative |
ERE |
East
Rail Extension |
ET |
Environmental
Team |
ETS |
East
Tsim Sha Tsui |
ETWBTC |
Environment,
Transport and Works Bureau Technical Circular |
FDM |
Fugitive
Dust Model |
FMPHQ |
Former
Marine Police Headquarters |
FSD |
Fire
Services Department |
FTA |
Federal
Transit Administration |
GEO |
Geotechnical
Engineering Office |
GI |
Ground
Investigation |
HyD |
Highways
Department |
HAC |
Harbour
City |
HKCC |
Hong
Kong Cultural Centre |
HKPSG |
Hong
Kong Planning Standards and Guidelines |
HKSAR |
Hong
Kong Special Administration Region |
HKSM |
Hong
Kong Space Museum |
HOKLAS |
|
ICOMOS |
International
Charter for the Conservation and Restoration of Monuments and Sites |
IEC |
Independent Environmental Checker |
ITR |
Indirect
Technical Remedies |
KCRC |
Kowloon
Canton Railway Corporation |
KPDCP |
Kowloon Park Drive Children’s Playground |
KSL |
Kowloon
Southern Link |
LCSD |
Leisure
and Cultural Services Department |
Mbgl |
Metre
Below Ground Level |
MTRC |
Mass Transit Railway Corporation |
MDG |
Moderately
Decomposed Granite |
1¤ °a° ”À[a3 NAC |
Nam
Cheong |
NCO |
Noise
Control Ordinance |
NSRs |
Noise
Sensitive Receivers |
OFSB |
Old
Fire Station Buildings |
OZP |
Outline
Zoning Plan |
PAH |
Polyaromatic
Hydrocarbon |
PCW |
Prescribed
Construction Work |
PFA |
Pulverised
Fuel Ash |
PlanD |
Planning
Department |
PME |
Powered
Mechanical Equipment |
ProPECC |
Practice
Note for Professional Persons |
RAP |
Remediation
Action Plan |
RBSL |
Risk-based
Screening Level |
RDS-2 |
Second
Railway Development Study |
SDG |
Slightly
Decomposed Granite |
SPME |
Specified
Powered Mechanical Equipment |
SS |
Suspended
Solid |
STC |
Sound
Transmission Class |
SWL |
Sound
Power Level |
TBM |
|
TCLP |
Toxicity
Characteristic Leaching Procedure |
TIN |
|
TL |
|
TMs |
|
TM-GW |
Technical
Memorandum on Noise from Construction Work other than Percussive Piling |
TM-DA |
Technical
Memorandum on Noise from Construction Work in Designated Areas |
TM-EIA |
Technical
Memorandum on Environmental Impact Assessment Process |
TM-Places |
Technical
Memorandum on Noise from Places other than Domestic Premises, Public Places
or Construction Sites |
TM-PP |
Technical
Memorandum on Noise from Percussive Piling |
TM-Water |
Technical Memorandum on
Standards for Effluents Discharged into Drainage and Sewerage Systems, Inland
and Coastal Waters |
TPH |
Total
Petroleum Hydrocarbon |
TSP |
Total
Suspended Particulates |
TST |
Tsim
Sha Tsui |
USEPA |
|
VHWCZ |
|
VSR |
Visually
Sensitive Receivers |
WBTC |
Works
Branch Technical Circular |
WDO |
Waste
Disposal Ordinance |
WKCD |
West
Kowloon Cultural District |
WKN |
West
Kowloon Station |
WMP |
Waste
Management Plan |
WPCO |
Water
Pollution Control Ordinance |
WQO |
Water
Quality Objective |
WR |
West
Rail |
WSD |
Water
Services Department |
WSR |
Water
Sensitive Receiver |
YMT |
Yau
Ma Tei |
ZVI |
Zone
of Visual Influence |