Drainage Services Department
Consultants Management Division
42/F,
Wanchai,
Agreement No. CE 80/2001(DS) Drainage Improvement in
Tsuen Wan and Kwai Chung –
Tsuen Wan Drainage Tunnel
Environmental Impact
Assessment (Revised Final)
June 2005
Mott Connell Limited
40/F, Hopewell Centre
183 Queen’s Road East
Wan
Chai,
This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Mott Connell Ltd being obtained. Mott Connell Ltd accepts no responsibility or liability for the consequence of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Mott Connell Ltd for all loss or damage resulting therefrom. Mott Connell Ltd accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.
Chapters
1.2 Project History
1.3 Environmental Impact Assessment Ordinance
1.5 Inter-Relationship with Other EIA Studies
2.2.3 Evaluation Results of the Tunnel Options
2.3.2 Construction of tunnel and underground structures
2.3.3 Construction of surface structures
2.3.4 Intake I-1 (Figures 2.14 to 2.15 refers)
2.3.5 Intake I-2 (Figures 2.16 to 2.18 refers)
2.3.6 Intake I-3 (Figures 2.19 to 2.22 refers)
2.3.7 Outfall O-1 (Figures 2.23 to 2.25 refers)
2.5 Mechanism of Intake Design
2.5.1 Intake I-1 (Figures 2.14 to 2.15 refers)
2.5.2 Intakes I-2 and I-3 (Figures 2.16 to 2.22 refers)
3. AIR QUALITY IMPACT ASSESSMENT 3-1
3.2 Legislation, Standards, Guidelines and Criteria
3.4 Baseline Conditions/ Sensitive Receivers
3.8 Environmental Monitoring and Audit
3.9 Conclusions and Recommendations
4. NOISE IMPACT ASSESSMENT 4-1
4.2 Legislation, Standards, Guidelines and Criteria
4.4 Baseline Conditions/ Sensitive Receivers
4.5.2 Operation
4.8 Environmental Monitoring and Audit
5. WATER QUALITY IMPACT ASSESSMENT 5-1
5.2 Legislation, Standards, Guidelines and Criteria
5.4 Baseline Conditions/ Sensitive Receivers
5.4.2 Water Quality Modelling
5.4.4 Bathing Beach Water Quality
5.5.4 Water Recreational Areas
5.5.6 Future Planned Water Sensitive Receivers
5.7.2 Emergency Responses to
Spillages
5.10 Environmental Monitoring and Audit
6. WASTE IMPACT ASSESSMENT 6-1
6.2 Legislation, Standards, Guidelines and Criteria
6.4.2 Operation
6.5 Management/ Mitigation of Impacts
6.6 Environmental Monitoring and Audit
6.7 Conclusions and Recommendations
7. ECOLOGICAL IMPACT ASSESSMENT 7-1
7.2 Relevant
Legislation and Guidelines
7.4 Results of Baseline Field Surveys
7.9 Environmental Monitoring and Audit
8 CULTURAL HERITAGE IMPACT ASSESSMENT 8-1
8.2 Relevant Legislation & Guidelines
8.3.2 Identification of Baseline Cultural Heritage Conditions
8.3.4 Historical Buildings and Structures Survey
8.4 Baseline Conditions and Sensitive Receivers
8.4.1 Archaeological Resources
8.4.2 Historical Buildings and Structures
8.5 Impact Assessment
8.8 Environmental Monitoring and Audit
9.2 Technical Requirement for Hazard to Life Assessment
10. FISHERIES
IMPACT ASSESSMENT 10-1
10.2 Fisheries Impact Assessment Methodology
10.3 Baseline Conditions & Sensitive Receivers
10.4 Identification of Fisheries Impacts
10.5 Assessment of environmental Impacts
10.6 Mitigation of Adverse Environmental Impacts
10.7 Residual Fisheries Impacts
10.8 Environmental Monitoring & Audit
11. ENVIRONMENTAL MONITORING AND AUDIT (EM&A) REQUIREMENTS 11-1
11.1 Air Quality Impact Assessment
11.3 Water Quality Impact Assessment
11.5 Ecological Impact Assessment
11.6 Cultural Heritage Impact Assessment
11.8 Fisheries Impact Assessment
12 CONCLUSIONS AND RECOMMENDATIONS 12-1
12.1 Air Quality Impact Assessment
12.3 Water Quality Impact Assessment
12.5 Ecological Impact Assessment
12.6 Cultural Heritage Impact Assessment
12.8 Fisheries Impact Assessment
12.9 Environmental Outcomes
12.9.1 Population and Environmental Sensitive Areas Protected
12.9.2 Environmental Friendly Designs and Problems Avoided
12.9.3 Environmental Benefits of the Project
13 IMPLEMENTATION SCHEDULE 13-1
Tables
Table 2.1 Data Summary of Tunnel Options
Table 2.2 Evaluation Criteria and their Weightings
Table 2.3 Summary of Evaluation
Table 2.4 Interception of Flow at Intake I-1
Table 2.5 Interception of Flow at Intake I-2
Table 2.6 Interception of Flow at Intake I-3
Table 3.1 Hong Kong Air Quality Objectives
Table 3.2 Emission Factors for Construction Activities
Table 3.3 Air Quality at Kwai Chung and Tsuen Wan Monitoring Stations (5-year annual averages)
Table 3.4 Representative Air Sensitive Receivers (ASRs)
Table
4.1 Acceptable Noise Levels (ANL,
Leq, 5 min dB(A))
Table 4.2 Groundborne Noise Criteria (ANL, (ANL, Leq, 5 min dB(A))
Table 4.3 Noise Sensitive Receivers
Table 4.4 Plant Inventory (for Tunnel Construction) (No Mitigation Measures)
Table 4.5 Cumulative Noise Impacts (No mitigation Measures) - (Leq,30min dB(A))
Table 4.6 Cumulative Noise Impacts (Mitigation Measures – Quiet Plant)
Table 4.7 Cumulative Noise Impacts (Mitigation Measures – Noise Barrier)
Table 5.1 Different Groups of Inland Water Specified in the TM
Table 5.2 Standards for Effluents Discharged into Group A Inland Waters
Table 5.3 Standards for Effluents Discharged into Group D Inland Waters
Table 5.4 Marine Water Quality Objectives Relevant to the Western Buffer Water Control Zone
Table 5.5 Potential Activities which could generate Water Quality Issues during Construction
Table 5.6 Water Quality at Intake Structures
Table 5.7 Baseline Marine Water Quality Data 2003
Table 5.8 Baseline River Water Quality Data 2003
Table 5.9 Summary of Construction Activities and Potential Impacts
Table 5.10 No. of Days Rainfall Exceeds 30mm/hr 1999 – 2001
Table 5.11 Streamflow Maintained to the Downstream Rivers/ Channels
Table 5.12 Range of Streamflow under Normal Conditions
Table 5.13 Estimated Average Pollution Loads
Table 5.14 Estimated Pollution Concentration
Table 5.15 Estimated E. coli Concentration
Table 5.16 Annual Geometric Mean E. coli Level at Approach Beach 1995-2004
Table 5.17 Spill Control and Response Plan
Table 6.1 Volumes of Waste Generated from Construction of Surface Structures/Site Formation
Table 7.1 Habitat Types recorded within the Study Area
Table 7.2 Overall Habitat Loss due to the Drainage Improvement Works
Table 7.3 Habitats to be Affected during Construction of Intake I-2
Table 7.4 Habitats to be Affected during Construction of Intake I-3
Table 7.5 Impacts on the Species of Conservation Interest
Table 7.6 Overall Impact Evaluation for Stream/Channel
Table 7.7 Overall Impact Evaluation for Plantation and Village-Orchard
Table 7.9 Overall Habitat Loss due to the Drainage Improvement Works
Table 8.1 Grading of Historical Buildings
Table 8.2 Archaeological Fieldwork Requirements
Table 8.3 Potential Historical Buildings and Features Identified within the Study Area
Appendices
Appendix A Construction Programme
Appendix B Detailed Calculations of Construction Dust Emission Factors
Appendix C Sample of Output File of the FDM Model Run
Appendix D Detailed Noise Calculations
Appendix E Baseline Water Quality Monitoring Report
Appendix F Baseline Ecological Survey Report
Appendix G Archaeological Survey Report
Appendix H Built Heritage Impact Assessment Report
Figures
Figure 1.1 Tunnel Alignment and
Surrounding Area
Figure 1.2 Alternative Locations Considered for Intake I-2
Figure 1.3 Alternative Locations Considered for Intake I-3
Figure 2.1 Tunnel General Layout
Figure 2.2 Typical Tunnel Section
Figure 2.3 Tunnel Alignment (Sheet
1 of 10)
Figure 2.4 Tunnel Alignment (Sheet
2 of 10)
Figure 2.5 Tunnel Alignment (Sheet
3 of 10)
Figure 2.6 Tunnel Alignment (Sheet
4 of 10)
Figure 2.7 Tunnel Alignment (Sheet
5 of 10)
Figure 2.8 Tunnel Alignment (Sheet
6 of 10)
Figure 2.9 Tunnel Alignment (Sheet
7 of 10)
Figure 2.10 Tunnel Alignment (Sheet 8
of 10)
Figure 2.11 Tunnel Alignment (Sheet 9
of 10)
Figure 2.12 Tunnel Alignment (Sheet
10 of 10)
Figure 2.13 Tunnel Longitudinal
Profile
Figure 2.14 Intake I-1 - General
Layout
Figure 2.15 Intake I-1 - Sections and
Details
Figure 2.16 Intake I-2 - General
Layout
Figure 2.17 Intake I-2 - Revised
Intake Arrangement
Figure 2.18 Intake I-2 - Revised
Sections
Figure 2.19 Intake I-3 - General
Layout
Figure 2.20 Intake I-3 - Sections
(Sheet 1 of 3)
Figure 2.21 Intake I-3 - Sections
(Sheet 2 of 3)
Figure 2.22 Intake I-3 - Sections
(Sheet 3 of 3)
Figure 2.23 Outfall O-1 - General
Layout
Figure 2.24 Outfall O-1 - Sections
Figure 2.25 Outfall O-1 - Plan and
Sections
Figure 2.26 General Arrangement of
Tunnel Options 1-4
Figure 2.27 Construction Work Site at Boundary at
Intake I-1
Figure 2.28 Construction Work Site at Boundary at
Intake I-2
Figure 2.29 Construction Work Site at Boundary at
Intake I-3
Figure 2.30 Construction Work Site at Boundary at
Outfall O-1
Figure 2.31 PPFS Maintenance Access Arrangement
Figure 2.32 Alternative Maintenance Access to Outfall Structure
Figure 4.1 Locations of Noise
Sensitive Receivers around Intake I-1
Figure 4.2 Locations of Noise Sensitive
Receivers around Intake I-2
Figure 4.3 Locations of Noise
Sensitive Receivers around Intake I-3
Figure 4.4 Locations of Noise
Sensitive Receivers around Outfall O-1
Figure
4.5 Illustrations of the Proposed
Blasting at Intakes I-2 and I-3
Figure
4.6 Indicative Locations of the
Temporary Barrier for Construction Around Intake I-2
Figure 5.1 Locations of Water
Quality Sensitive Receivers and EPD Water Quality Monitoring Station
Figure 5.2 Cascade at Outfall O-1
Figure
5.3 Sequencing of Works at Intake
I-1
Figure
5.4 Sequencing of Works at Intake
I-2
Figure
5.5 Sequencing of Works at Intake
I-3
Figure
5.6 Sequencing of Works at Outfall
O-1
Figure
5.7 Proposed Locations of
Stockpiling at Intakes
Figure
5.8 Stockpiling Area and Sediment
Tank at Outfall O-1
Figure
5.9 Bathing Beach Water Quality in
Tsuen Wan District
Figure
5.10 Water Quality Index (WQI) of Sam Dip Tam Stream
and its tributaries
Figure
5.11 Agricultural Activities near Intake
Structure I-2
Figure
5.12 Agricultural Activities near
Intake Structure I-3
Figure 5.13 Trash Grill Detail
Figure 7.1 Habitats to be affected
by the Construction of Intake I-1
Figure 7.2 Habitats to be affected
(Permanently) by the Construction of Intake I-2
Figure 7.3 Habitats to be affected
(Temporary) by the Construction of Intake I-2
Figure 7.4 Habitats to be affected
(Permanently) by the Construction of Intake I-3
Figure
7.5 Habitats to be affected
(Temporary) by the Construction of Intake I-3
Figure
7.6 Habitats to be affected by the
Construction of Outfall O-1
Figure
7.7 Extent of Different Types of
Works of Intake I-2
Figure
7.8 Extent of Different Types of
Works of Intake I-3
Figure
7.9 Habitats Map Near Intake I-2
Figure
7.10 Proposed Master Planting Scheme
for I-1
Figure
7.11 Proposed Master Planting Scheme
for I-2
Figure
7.12 Proposed Master Planting Scheme
for I-3
Figure
7.13 Proposed Master Planting Scheme
for O-1
Figure
7.14 Proposed Master Planting Scheme
for O-1
Figure 8.1 Cultural Heritage
Resources in the Vicinity of the Drainage Tunnel System
Figure 8.2 Potentially impacted
sites at Sam Dip Tam
Figure 8.3 Potentially impacted
sites at Yau Kom Tau
Figure 9.1 Location of nearby
Potentially Hazardous Installations (PHI)
Plates
Plate 2.1 The Conditions around
the Intake I-1 Structures
Plate 2.2 The Conditions around
the Intake I-2 Structures