CONTENTS
Page
1.
INTRODUCTION 1
1.1 Background 1
1.2 Purpose of the EIA 2
1.3 Project Location and Scope 2
2.
PROJECT DESCRIPTION 3
2.1 Description of the Project 3
2.2 Channel Design 4
2.3 Justifications and Benefits of the Project 4
2.4 Continuous Public Involvement 5
2.5 Project Programme 5
3.
SUMMARY OF THE EIA 5
3.1 Air Quality Impact 5
3.2 Construction Noise Impact 5
3.3 Water Quality Impact 6
3.4 Waste Management 6
3.5 Ecological Impact 7
3.6 Landscape and Visual Impact 8
3.7 Cultural Heritage Impact 9
3.8 Environmental Monitoring and Audit 9
4.
OVERALL CONCLUSIONS 10
List
of Figures
Figure 1 Location Plan of Proposed (Designated Project) Drainage Channels
Figure 2 General Arrangement for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 1 of 2)
Figure 4 General Arrangement for Proposed Improvement Works at Lin Ma Hang (LMH01)
Figure 5 Typical Layout and Section of Two-Stage Channel