Agreement No. CE 35/2006(CE)
Kai Tak Development Engineering Study
cum Design and Construction of Advance Works –
Investigation, Design and Construction
Decommissioning of the
Other than the North
Apron
Environmental Impact
Assessment Report
Contents
1 INTRODUCTION.............................................................................................................. 1
1.1 Background of the Project...................................................................................... 1
1.2 Purpose of this EIA Report..................................................................................... 3
1.3 Objectives and Scope of the Schedule 2 EIA Study.................................................. 3
1.4 Relevant Approved EIA Reports............................................................................... 4
1.5 Structure of the Report........................................................................................... 4
2 PROJECT DESCRIPTION................................................................................................. 7
2.1 Key Project Requirements...................................................................................... 7
2.2 Site Location and History....................................................................................... 7
2.3 Nature, Scope and Benefits of the Project................................................................ 7
2.4 Consideration of Alternative Decommissioning / Decontamination Methods................. 8
2.5 Construction Activity and Project Programme........................................................... 8
2.6 Interactions with Other Projects............................................................................. 10
3 LAND CONTAMINATION IMPACT................................................................................... 13
3.1 Introduction......................................................................................................... 13
3.2 Environmental Legislation, Policies, Plans, Standards and Criteria........................... 13
3.3 Assessment Methodology.................................................................................... 14
3.4 Identification of Sensitive Receivers........................................................................ 14
3.5 Description of the Environment.............................................................................. 15
3.6 Identification of Potential Environmental Impacts..................................................... 18
3.7 Site Investigation for Land Contamination Assessment............................................ 19
3.8 Prediction and Evaluation of Environmental Impacts................................................ 31
3.9 Outline Process and Operation of Remediation....................................................... 42
3.10 Remediation Report.............................................................................................. 48
3.11 Environmental Mitigation Measures and Safety Measures........................................ 48
3.12 Interaction with other Concurrent Projects.............................................................. 50
3.13 Evaluation of Residual Impacts.............................................................................. 51
3.14 Environmental Monitoring and Audit....................................................................... 51
3.15 Conclusion.......................................................................................................... 51
4 WASTE MANAGEMENT IMPLICATIONS......................................................................... 53
4.1 Introduction......................................................................................................... 53
4.2 Environmental Legislation, Policies, Plans, Standards and Criteria........................... 53
4.3 Assessment Methodology.................................................................................... 55
4.4 Identification of Environmental Impacts................................................................... 55
4.5 Prediction and Evaluation of Environmental Impacts................................................ 55
4.6 Mitigation of Adverse Environmental Impacts.......................................................... 57
4.7 Evaluation of Residual Impacts.............................................................................. 59
4.8 Environmental Monitoring and Audit....................................................................... 59
4.9 Conclusion.......................................................................................................... 59
5 WATER QUALITY IMPACT............................................................................................. 61
5.1 Introduction......................................................................................................... 61
5.2 Environmental Legislation, Policies, Plans, Standards and Criteria........................... 61
5.3 Description of the Environment.............................................................................. 62
5.4 Water Sensitive Receivers.................................................................................... 68
5.5 Assessment Methodology.................................................................................... 69
5.6 Identification of Environmental Impacts................................................................... 69
5.7 Prediction and Evaluation of Environmental Impacts................................................ 71
5.8 Consideration of Cumulative Environmental Impacts................................................ 73
5.9 Mitigation Measures of Adverse Environmental Impacts........................................... 74
5.10 Evaluation of Residual Impacts.............................................................................. 77
5.11 Environmental Monitoring and Audit....................................................................... 77
5.12 Conclusion.......................................................................................................... 77
6 AIR QUALITY IMPACT................................................................................................... 79
6.1 Introduction......................................................................................................... 79
6.2 Environmental Legislation, Policies, Plans, Standards and Criteria........................... 79
6.3 Description of the Environment.............................................................................. 81
6.4 Air Sensitive Receivers......................................................................................... 81
6.5 Identification of Environmental Impacts................................................................... 83
6.6 Assessment Methodology.................................................................................... 87
6.7 Prediction and Evaluation of Environmental Impacts................................................ 89
6.8 Mitigation of Adverse Environmental Impacts.......................................................... 90
6.9 Evaluation of Residual Impacts.............................................................................. 92
6.10 Environmental Monitoring and Audit....................................................................... 92
6.11 Conclusion.......................................................................................................... 92
7 NOISE IMPACT.............................................................................................................. 95
7.1 Introduction......................................................................................................... 95
7.2 Environmental Legislation, Policies, Plans, Standards and Criteria........................... 95
7.3 Description of the Environment.............................................................................. 96
7.4 Noise Sensitive Receivers..................................................................................... 96
7.5 Assessment Methodology.................................................................................... 97
7.6 Identification of Environmental Impacts................................................................... 98
7.7 Prediction and Evaluation of Environmental Impacts................................................ 98
7.8 Mitigation of Adverse Environmental Impacts.......................................................... 99
7.9 Evaluation of Residual Impacts.............................................................................. 99
7.10 Environmental Monitoring and Audit....................................................................... 99
7.11 Conclusion.......................................................................................................... 99
8 IMPACT ON CULTURAL HERITAGE.............................................................................. 101
8.1 Introduction........................................................................................................ 101
8.2 Environmental Legislation, Policies, Plans, Standards and Criteria.......................... 101
8.3 Assessment Methodology................................................................................... 102
8.4 Results of Desk-Based Study.............................................................................. 102
8.5 Identification of Built Heritage Resources.............................................................. 103
8.6 Evaluation of Heritage Significance....................................................................... 105
8.7 Impact Assessment........................................................................................... 107
8.8 Mitigation of Adverse Environmental Impacts......................................................... 107
8.9 Environmental Monitoring and Audit..................................................................... 107
8.10 Conclusion........................................................................................................ 107
8.11 Reference.......................................................................................................... 108
9 MARINE ECOLOGICAL IMPACT................................................................................... 111
9.1 Introduction........................................................................................................ 111
9.2 Environmental Legislation, Policies, Plans, Standards and Criteria.......................... 111
9.3 Assessment Methodology................................................................................... 112
9.4 Description of the Environment............................................................................ 115
9.5 Identification of Environmental Impacts................................................................. 123
9.6 Prediction and Evaluation of Environmental Impacts............................................... 124
9.7 Mitigation of Adverse Environmental Impacts......................................................... 126
9.8 Evaluation of Residual Impacts............................................................................ 126
9.9 Environmental Monitoring and Audit..................................................................... 126
9.10 Conclusion........................................................................................................ 126
9.11 References........................................................................................................ 127
10 ENVIRONMENTAL MONITORING AND AUDIT............................................................... 131
10.1 Introduction........................................................................................................ 131
10.2 Land Contamination Impact................................................................................. 131
10.3 Waste Management Implications......................................................................... 131
10.4 Water Quality Impact.......................................................................................... 132
10.5 Air Quality Impact.............................................................................................. 132
10.6 Noise Impact..................................................................................................... 132
10.7 Impact on Cultural Heritage................................................................................. 132
10.8 Marine Ecological Impact.................................................................................... 132
11 IMPACTS SUMMARY................................................................................................... 133
11.1 Introduction........................................................................................................ 133
11.2 Land Contamination Impact................................................................................. 133
11.3 Waste Management Implications......................................................................... 134
11.4 Water Quality Impact.......................................................................................... 134
11.5 Air Quality Impact.............................................................................................. 134
11.6 Noise Impact..................................................................................................... 135
11.7 Impact on Cultural Heritage................................................................................. 135
11.8 Marine Ecological Impact.................................................................................... 136
11.9 Conclusion........................................................................................................ 136
12 IMPLEMENTATION SCHEDULE OF THE
PROPOSED MITIGATION MEASURES............. 155
13 SUMMARY OF
ENVIRONMENTAL OUTCOMES............................................................. 179
List of Tables
Table 2.1.......... Summary
of Construction Activities
Table 2.2.......... Tentative
Project Programme
Table 2.3.......... Summary
of Concurrent Projects
Table
3.1.......... Aerial
Photographs Reviewed
Table
3.2.......... Historical
Information of Fire Stations
Table
3.3.......... Existing
Landuses in the Project Area after Closure of Kai Tak Airport
Table
3.4 ....... Summary of Fuel Spillage Incidents
Table
3.6.......... Summary
of Soil Samples Exceeding Dutch B/C Values in South Apron
Table
3.8.......... Summary
of Soil Samples Exceeding Dutch B/C Values in Ex-GFS Apron Area
Table
3.9.......... Summary
of Groundwater Samples Exceeding Dutch B/C Values
Table
3.10........ Evaluation
of Significance of Risk Due to Groundwater Contamination
Table
3.12........ Estimated
Quantity of Contaminated Soil
Table
3.13........ Estimated
Volume of Different Types of Contaminated Soil
Table
3.14........ Treatment
Technologies for Contaminated Soil with Metals / TPH / VOCs / SVOC
Table
3.18........ List
of Free Product Recovery Technologies
Table
3.19........ Universal
Treatment Standards (UTS) for the Concerned Heavy Metals
Table
4.1.......... Estimated
Quantities of C&D Material from Demolition Works
Table
4.2.......... Summary
of Waste Handling Procedures and Disposal Routes
Table
5.1.......... Summary
of Water Quality Objectives for the Victoria Harbour WCZ
Table
5.2..........
WSD’s Water Quality Criteria for Flushing Water at Sea Water Intakes
Table
5.3.......... Summary
Statistics of Marine Water Quality in the Victoria Harbour WCZ in 2005
Table
5.5.......... Summary Statistics of
2005 River Water Quality for Kai Tak Nullah
Table
5.6.......... Pollution
Levels Measured at KTAC in October 2005
Table
5.7.......... Pollution
Levels Measured at KTAC in January 2006
Table
5.8 ......... Summary
Statistics of 2005 Bottom Sediment Quality
Table
6.1.......... Hong
Kong Air Quality Objectives
Table
6.2.......... Air
Quality Criteria for Non-criteria Pollutants
Table
6.3.......... Health
Risk Guidelines for Exposure to Air Toxics
Table
6.5.......... Details
of Representative Air Sensitive Receivers
Table
6.6.......... Maximum
Contamination Levels of Soil at ex-GFS Apron Area
Table
6.7.......... VOCs
Concentrations detected in Soil Samples at ex-GFS Apron Area
Table
6.8.......... Summary
of Emission Inventory
Table
6.9.......... Pollutant
Emission Rate (in the Form of Dust) during Excavation
Table
6.10........ Pollutant
Emission Rate (in the Form of Vapour) during Excavation
Table
6.11........ Maximum
Hourly Pollutant Concentrations (in the Form of Dust) During Excavation
Table
6.12........ Maximum
Hourly Pollutant Concentrations (in the Form of Vapour) During Excavation
Table
7.1.......... Construction
Noise Criteria for Activity Other Than Percussive Piling
Table
7.3.......... Predicted
Noise Levels in the Absence of Mitigation Measures
Table 9.2 ........ Evaluation
of Ecological Impacts on Marine Resources
Table 11.1........ Summary
of Environmental Impacts Associated with the Project
Table
12.1........ Implementation
Schedule for Land Contamination Measures
Table
12.2........ Implementation
Schedule for Waste Management Measures
Table
12.3........ Implementation
Schedule for Water Quality Measures
Table
12.4........ Implementation
Schedule for Air Quality Measures
Table
12.5........ Implementation
Schedule for Noise Measures
Table
12.6........ Implementation
Schedule for Marine Ecological Measures
Table
13.1........ Summary
of Key Environmental Outcomes/ Benefits
List of Drawings
Drawing 1.1 Preliminary
Outline Development Plan
Drawing 2.2 Existing
Buildings and Different Study Areas within the Former Kai Tak Airport
Drawing 2.2a Outstanding
areas within the Former Kai Tak Airport not Covered under this Project
Drawing 2.3 Locations
of Decommissioning / Decontamination Works
Drawing 2.4a Concurrent
Activities before Completion of Contaminated Soil Excavation
Drawing 2.4b Concurrent
Activities after Completion of Contaminated Soil Excavation
Drawing 3.1 Land
Contamination Studies Covered by this Project
Drawing 3.2 Existing
Landuses in the Project Area after Closure of Kai Tak Airport
Drawing 3.3 Airplane
Accidents at Project Area with Potential Land Contamination Concern
Drawing 3.4 As-built
Sampling Locations in South Apron Area
Drawing 3.5 As-built
Sampling Locations in Runway Area and the Narrow Strip of North Apron
Drawing 3.6 As-built
Sampling Locations in Ex-GFS Apron Area
Drawing 3.7 As-built
Sampling Locations with Contaminants Exceeding Dutch B/C Levels
Drawing 3.8 Contaminated
Zones Proposed For Excavation
Drawing 3.9 Proposed
Remediation Strategy for Contaminated Soil
Drawing 3.10 Location
of Decontamination Works Area
Drawing 3.11 Schematic
of a Typical Single Biopile
Drawing.5.1 Location
of Victoria Harbour Water Control Zone and 300m Study Area
Drawing.5.2 Locations
of Selected Water Quality Sensitive Receivers
Drawing 6.1 Air
Quality Assessment Area
Drawing 6.2 Excavation
Area at Ex-GFS Apron Area Considered in the Model
Drawing 6.3 Contours
of 1-hour TPH Concentration in µg/m3 at 1.5m Above Ground
Drawing 7.1 Locations
of Noise Assessment Points
Drawing 8.1 Study
area for Cultural Heritage Assessment
Drawing 8.2 Plan
of the Runway
Drawing 8.3 Locations
of Identified Cultural Heritage Resources
Drawing 8.4 Location
of Wind Pole (WP-1)
Drawing 8.5 Location
of Wind Pole (WP-2)
Drawing 8.6 Location
of Airport Pier
Drawing 8.7 Location
of Pier at Fire Station B
Drawing 8.8 Location
of Fire Station B
Drawing 8.9 Location
of Fire Station C and its Adjacent Wind Pole (WP-3)
Drawing 9.1 Marine
Ecological Survey Locations
List of Appendices
Appendix 3.3 Groundwater Risk
Assessment
Appendix 3.4 Hot Works
Requirements for Petrol Filling Station
Appendix 6.1 Calculation of
Emission Rates for TPH, Ethylbenzene and Xylenes (in the form of Dust)
Appendix 6.2 Calculation of
Emission Rates for TPH, Ethylbenzene and Xylenes (in the form of Vapour)
Appendix 7.1 Details of
Construction Noise Impact Assessment
Appendix 7.2 Photo–documentation of Noise Assessment Points
Appendix 8.1 Built Heritage Resources
Records
Appendix 9.1 Photo-documentation of Marine Environment within the Kai Tak Area
Appendix 9.2 Benthos Survey
Report
Appendix 9.3 Photo-documentation
of Intertidal Habitats at Each Survey Locations
Appendix 9.4 List of Intertidal
Fauna Recorded in Present Survey
Appendix 9.5 Coral Survey Report
Appendix 11.1 Key Assessment Assumptions and
Methodologies