Contents
2 SCOPE OF ENVIRONMENTAL IMPACT ASSESSMENT
STUDY
14 LANDSCAPE AND VISUAL
IMPACT
15 ENVIRONMENTAL MONITORING AND AUDIT
REQUIREMENTS
Appendices
Appendix
5A Calculation of Fugitive Dust Emission Factors
Appendix
5B Locations and Details of Worksites for Fugitive Dust Assessment
Appendix
5C Extent of Road not included in PATH
Appendix
5D 2031 Emission Inventory
Appendix
5E Airport Operation Information
Appendix
5F-1 Key Assumptions for EmFAC Modelling
Appendix
5G Vehicle
Emission at Kiosks, Loading / Unloading Bays
Appendix
5H Vehicle
Emission Factors for TMCLKL
Appendix
5I Tunnel
Emission Calculations
Appendix
5J Cumulative Air Quality Impacts
Appendix
6A Designated Area – Lantau Island West
Appendix
6B Noise Sensitive Receivers
Appendix
6C Construction Programme
Appendix
6D Construction Plant Inventory
Appendix 6E Sound Power Level of Construction Plant
Inventory
Appendix 6F Separation Distance between NSRs and Notional Construction Noise Sources
Appendix
6G Monthly
Construction Noise Calculation – Unmitigated Scenario
Appendix
6H Predicted Construction Noise Impacts – Unmitigated Scenario
Appendix
6HA Sample
Calculation of Construction Noise
Appendix
6I Monthly Construction Noise Calculation – Mitigated Scenario
Appendix
6J Predicted Construction Noise Impacts – Mitigated Scenario
Appendix
6K Extent of Friction Course Materials
Appendix
6L Road Category for Road Traffic Noise Assessment
Appendix
6M Predicted
Road Traffic Noise Impacts
Appendix
6N Proposed APM Alignment
Appendix
6O APM
Vibration Measurement Locations
Appendix
6P APM Vibration Level Measurements
Appendix
6Q APM
Groundborne Noise Assessment
Appendix
6R Locations of Prevailing Background Noise Measurement
Appendix
7A Management Framework of Dredged / Excavated Sediment in Hong Kong
Appendix
8A HKLR – Construction & Demolition Materials Management Plan
Appendix
8B HKBCF – Construction & Demolition Materials Management Plan
Appendix
9A1 Construction
Sequence and Construction Programme – HKBCF (Sequence A)
Appendix
9A2 Construction
Sequence and Construction Programme – HKBCF (Sequence B)
Appendix
9B Comparison of Sediment Loss Rate of Sequence A and Sequence B
Appendix
9C Construction Sequence and Construction Programme – HKLR Reclamation
Appendix
9D1 Sediment
Testing Results for TM-CLKL
Appendix
9D3 Calculation
of Loss Coefficients for Bridge Piers
Appendix
9D4 Pollution
Loading Inventory
Appendix
9D5 Cumulative
Dredging and Sediment Loss Rates
Appendix
9D6 Water
Quality Mitigation – Silt Curtain Application
Appendix
9D7 2026
Quality Modelling Results
Appendix
9D8 2011
Construction Plumes Modelling Results
Appendix
9D9 2012
Construction Plumes Modelling Results
Appendix
9D10 2013 Construction
Plumes Modelling Results
Appendix
9D11 Mitigated Scenario for
(2+1) Silt Curtain System
Appendix 9D12 Sensitivity Test for TSHD High Overflow
Scenario in PRD
Appendix 9E Modelling Verifications
Appendix
9E1 Modelling
Verification Plots - Grid Refinement
Appendix
9E2 Modelling
Verification Plots - Baseline
Appendix
9E3 Modelling
Verification Plots - Sequence B
Appendix
9F Modelling
Results for HKBCF Sequence B
Appendix 10D Results of HKBCF Ecological Survey
Programme
Appendix
12A Guidelines for
Cultural Heritage Impact Assessment
Appendix
12B Guidelines
for Marine Archaeological Investigation (MAI)
Appendix
12C Environmental
Impact Assessment Ordinance, Technical Memorandum – Annexes 10 and 19
Appendix
12D Archaeological
Survey Report at Sha Lo Wan (West) Southern Headland (march 2007)
Appendix
12F Relevant Marine
Geophysical charts
Appendix
12G Seabed
anomalies of possible cultural significance
Appendix
13A Overtopping
Release Fraction
Appendix
13B Aircraft Impact
Frequency
Appendix 13C Pool Fire Analysis
Appendix
13E Hazard to Life
Criteria
Figures
Figure
1.1 Proposed HKLR and HKBCF
Figure
1.2 Implementation Phases of HKBCF
Figure
1.3 Locations of Concurrent Projects during
Construction Phase
Figure
1.4 Locations of Concurrent Projects during
Operational Phase
Figure
3.1 Site Options considered for HKBCF
Figure
3.2 Alignment Options considered for HKLR
Figure
3.3 Tunnel cum At-grade Road Scheme for HKLR
Figure
3.4 Overall Layout of Proposed HKBCF-cum-HKLR
Figure
3.5 Key Issues/Constraints – Overall Plan (Sheet 1
of 2)
Figure
3.6 Key Issues/Constraints – Overall Plan (Sheet 2
of 2)
Figure
3.7 Key Issues/Constraints – AHR and Navigation
Channels
Figure
3.8 Key Issues/Constraints – Residential Premises
Figure
3.9 Key Issues/Constraints – Chinese White
Dolphins
Figure
3.10 HKBCF – Option WCLK
Figure
3.11 HKBCF – Option SSW
Figure
3.12 HKBCF – Option SWCLK
Figure
3.13 HKBCF – Option TCB
Figure
3.15 HKBCF – Option NECLK
Figure
3.16 HKLR – Alignment Option (A)
Figure
3.17 HKLR – Alignment Option (B)
Figure
3.18 HKLR – Alignment Option (C)
Figure
3.19 HKLR – Recommended Alignment: Further Points on Pilecap Arrangement
Figure
3.20 HKLR – Recommended Alignment: Further Points on Span Arrangement
Figure
3.21 HKLR –
Finer-level Alternative on the Section of HKLR from Scenic Hill to HKBCF
Figure 3.23 HKBCF - Finer-level Layout Option
(c): Adopting 2-row Arrangement for Clearance Kiosks
Figure
4.1 1st Phase and Full Phase of HKBCF
Figure
4.2 Main Works Elements of HKLR
Figure
4.3 Main Works Elements of HKBCF
Figure
4.4 Typical Arrangements for Pile and Pilecap
Construction
Figure
4.5 Types of Seawall and Reclamation
Figure
4.6 Sequence A of HKBCF Reclamation
Figure
4.7 Sequence B of HKBCF Reclamation
Figure
4.9 Overall Layout of Buildings within the HKBCF
Figure
4.10 Proposed Automated People Mover (APM)
Figure
4.11 Envisaged Construction Methods for the APM
(Sheet 1 of 2)
Figure
4.12 Envisaged Construction Methods for the APM
(Sheet 2 of 2)
Figure
4.13 Tentative Programme for HKBCF
Figure
4.14 Tentative
Programme for HKLR
Figure
5.1a Locations of Air Sensitive Receivers – Key
Plan
Figure
5.1b Locations of Air Sensitive Receivers – Sheet 1
Figure
5.1c Locations of Air Sensitive Receivers – Sheet 2
Figure
5.1d Locations of Air Sensitive Receivers – Sheet 3
Figure
5.2a Locations of Fugitive Dust Emission Sources
Figure
5.2b Locations of Concrete Batching Plants
Figure
5.3 Contours for Fugitive Dust Concentration
Figure
5.4a Location of Operational Air Quality Emission
Sources – Key Plan
Figure
5.4b Location of Operational Air Quality Emission
Sources – Sheet 1
Figure 5.4c
Location of Operational Air Quality
Emission Sources – Sheet 2
Figure
5.4d Location of Operational Air Quality Emission
Sources – Sheet 3
Figure
5.4e Location of Operational Air Quality Emission
Sources – Sheet 4
Figure
5.4f Location of Operational Air Quality Emission
Sources – Sheet 5
Figure
5.4g Location of the Existing Noise Barriers in
Tung Chung
Figure
5.5a Pollution Contour (I) (1-hr NO2
& 24-hr NO2)
Figure 5.5b Pollution Contour (II) (1-hr NO2
& 24-hr NO2)
Figure
5.5c Pollution Contour (III) (1-hr NO2 &
24-hr NO2 )
Figures
6.1a-j Locations
of Noise Sensitive Receivers
Figure
6.2 Location of Concrete Batching Plants
Figure
6.3 Location of the Ventilation Building at Scenic
Hill
Figure
6.4 Locations of Fixed Noise Sources
Figure
7.1 Sediment Sampling Locations from Other Studies
Figure
7.2 Locations of Existing Vibrocores for the
Reclamation of HKBCF and HKLR
Figure
7.3 Locations of Existing Vibrocores for HKLR
Marine Viaduct
Figure
7.4 Demarcation of Portion of HKBCF Reclamation by
the Vibrocores
Figure
7.5 Demarcation of Portion of HKLR Marine Viaduct
Figure
7.6 Demarcation of Portion of HKLR Reclamation by
the Vibrocores
Figure
9.1 Location Plan for HKBCF, TMCLKL and HKLR
Figure
9.3 Management Frameworks for Dredged/Excavated
Sediment
Figure
9.4 Key Areas of Seabed Disturbance
Figure
9.5 Location of Water Quality and Ecological
Sensitive Receivers
Figure
9.7 Sediment Sampling Locations for TMCLKL, HZMB
and others (Indicative)
Figure
9.8 Coverage of Western Harbour Model
Figure 9.9
Comparison of Original and Refined Model
Grids
Figure
9.10 Assumed Ultimate Coastline when
HKBCF+HKLR+TMCLKL is completed (2026)
Figure
9.11 Main Flow Channel in Western Harbour
Figure
9.12 Indicative Location of Box Culverts for
Discharges of Storm Waters from TMCLKL
Figure
9.14 Location Plan for the Proposed Pits to Receive
Mf sediment in HKBCF
Figure
9.15 Proposed Details and Mitigation measures for
the Pits to Receive Mf sediment in HKBCF
Figure
9.16 Location Plan for the Proposed Pits to Receive
Mf sediment in HKLR
Figure
9.17 Proposed Details and Mitigation measures for
the Pits to Receive Mf sediment in HKLR
Figure
10.1 Marine Ecological Assessment Area and Marine Ecological
Sensitive Receivers
Figure
10.4c Habitat Map for Terrestrial Ecological Assessment Area of HKLR
(Airport Ialand)
Figure
10.5 Photographs of Habitats presented within the
Study Area
Figure
10.8 Chinese White Dolphin DPSE 2002-2009 and the
HKBCF & HKLR Project Sites
Figure
10.13 Artificial
Reefs in Airport Marine Exclusion Zone 3 and the HKBCF & HKLR Project Sites
Figure
10.14 Pre-construction
Dive Survey for Corals
Figure
11.1 Fisheries Assessment Area
Figure
11.2 Fisheries Sensitive Receivers
Figure
11.3 Distribution of Overall Fisheries Production (adult
fish) and the Project Site
Figure
11.4 Distribution of Fish Fry Production and the
Project Site
Figure 11.5
Distribution of Operation of Fishing
Vessels (over 15m in length) and the Project Site
Figure
11.7 Project Sites and Marine Works Areas
Figure
11.11 Artificial Reefs in Airport Marine Exclusion Zone 3 and the HKBCF
Project Site
Figure
12.1 Layout
and Study Area of HKLR
Figure
12.3 Locations
of Test Pits and Augur Holes Excavated at Sha Lo Wan Archaeological Site
Figure
13.2 Route of the Hong Kong Link Road past the
aviation fuel tank farm
Figure
13.3 Cross section of Existing Tanks Bunding
Arrangement
Figure
13.4 Cross section of New extension Tanks Bunding
Arrangement
Figure
13.6 Side View of the Flame Produced in a Tank Head
Fire
Figure
13.7 Overtop Pool Spread Examples
Figure
13.9 LSIR for construction phase at ground level
Figure
13.10 LSIR for Construction phase at highway level
Figure
13.11 LSIR for Operational phase at highway level
Figure
13.12 F-N Chart for
Hong Kong Link Road
Figure
13.13 F-N
Chart for Population Sensitivity
Figure
13.14 The
Target Area for Aircraft Crashes at the Airport Fuel Tank Farm
Figure
13.15 Flame
shape used in PFIRE model
Figure
13.16 Predicted
Smoke Envelope for Potential Scenarios at the AFTF
Figure
13.17 Wind
Rose for data between 2003 and 2007
Figure
13.18 Societal
Risk Guidelines
Figure 14.1.1 Landscape Resource Plan
Figure 14.1.1a Landscape Resource Plan – Blow-up (Sheet 1
of 3)
Figure 14.1.1b Landscape Resource Plan – Blow-up (Sheet 2
of 3)
Figure 14.1.1c Landscape Resource Plan – Blow-up (Sheet 3
of 3)
Figure 14.1.2 Landscape Character Area Plan
Figure 14.1.2a Landscape Character Area Plan – Blow-up
(Sheet 1 of 3)
Figure 14.1.2b Landscape Character Area Plan – Blow-up
(Sheet 2 of 3)
Figure 14.1.2c Landscape Character Area Plan – Blow-up
(Sheet 3 of 3)
Figure 14.1.3 Visually Sensitive Receiver Plan
Figure 14.1.3a Visually Sensitive Receiver Plan – Blow-up (Sheet 1 of 3)
Figure 14.1.3b Visually Sensitive Receiver Plan – Blow-up (Sheet 2 of 3)
Figure 14.1.3c Visually Sensitive Receiver Plan –
Blow-up (Sheet 3 of 3)
Figure 14.2.1a Photomontage of VSR1 (Sheet 1 of 2)
Figure 14.2.1b Photomontage of VSR1 (Sheet 2 of 2)
Figure 14.2.2a Photomontage of VSR2 (Sheet 1 of 2)
Figure 14.2.2b Photomontage of VSR2 (Sheet 2 of 2)
Figure 14.2.3a Photomontage of VSR3 (Sheet 1 of 2)
Figure 14.2.3b Photomontage of VSR3 (Sheet 2 of 2)
Figure 14.2.4a Photomontage of VSR4 (Sheet 1 of 2)
Figure 14.2.4b Photomontage of VSR4 (Sheet 2 of 2)
Figure 14.2.6a Photomontage of VSR6 (Sheet 1 of 2)
Figure 14.2.6b Photomontage of VSR6 (Sheet 2 of 2)
Figure 14.2.7a Photomontage of VSR7 (Sheet 1 of 2)
Figure 14.2.7b Photomontage of VSR7 (Sheet 2 of 2)
Figure 14.2.8a Photomontage of VSR8 (Sheet 1 of 2)
Figure 14.2.8b Photomontage of VSR8 (Sheet 2 of 2)
Figure 14.2.9a Photomontage of VSR9 (Sheet 1 of 2)
Figure 14.2.9b Photomontage of VSR9 (Sheet 2 of 2)
Figure 14.2.10a Photomontage of VSR10 (Sheet 1 of 2)
Figure 14.2.10b Photomontage of VSR10 (Sheet 2 of 2)
Figure 14.2.11a Photomontage of VSR11 (Sheet 1 of 2)
Figure 14.2.11b Photomontage of VSR11 (Sheet 2 of 2)
Figure 14.2.12a Photomontage of VSR12 (Sheet 1 of 2)
Figure 14.2.12b Photomontage of VSR12 (Sheet 2 of 2)
Figure 14.2.14a Photomontage of VSR14 (Sheet 1 of 2)
Figure 14.2.14b Photomontage of VSR14 (Sheet 2 of 2)
Figure 14.2.15a Photomontage of VSR15 (Sheet 1 of 2)
Figure 14.2.15b Photomontage of VSR15 (Sheet 2 of 2)
Figure 14.2.16a Photomontage of VSR16 (Sheet 1 of 2)
Figure 14.2.16b Photomontage of VSR16 (Sheet 2 of 2)
Figure 14.2.17a Photomontage of VSR17 (Sheet 1 of 2)
Figure 14.2.17b Photomontage of VSR17 (Sheet 2 of 2)
Figure 14.2.19a Photomontage of VSR19 (Sheet 1 of 2)
Figure 14.2.19b Photomontage of VSR19 (Sheet 2 of 2)
Figure 14.2.20a Photomontage of VSR20 (Sheet 1 of 2)
Figure 14.2.20b Photomontage of VSR20 (Sheet 2 of 2)
Figure 14.2.21a Photomontage of VSR21 (Sheet 1 of 2)
Figure 14.2.21b Photomontage of VSR21 (Sheet 2 of 2)
Figure 14.2.23a Photomontage of VSR23 (Sheet 1 of 2)
Figure 14.2.23b Photomontage of VSR23 (Sheet 2 of 2)
Figure 14.2.25a Photomontage of VSR25 (Sheet 1 of 2)
Figure 14.2.25b Photomontage of VSR25 (Sheet 2 of 2)
Figure 14.2.26a Photomontage of VSR26 (Sheet 1 of 2)
Figure 14.2.26b Photomontage of VSR26 (Sheet 2 of 2)
Figure 14.2.27a Photomontage of VSR27 (Sheet 1 of 2)
Figure 14.2.27b Photomontage of VSR27 (Sheet 2 of 2)
Figure 14.2.30a Photomontage of VSR30 (Sheet 1 of 2)
Figure 14.2.30b Photomontage of VSR30 (Sheet 2 of 2)
Figure 14.2.31a Photomontage of VSR31 (Sheet 1 of 2)
Figure 14.2.31b Photomontage of VSR31 (Sheet 2 of 2)
Figure 14.3.1 Landscape Master Plan
Figure 14.4.1 Baseline Condition of CPA Shoreline
Figure 14.4.2 Mitigation Measures of CPA Shoreline
Figure
14.4.3 Mitigation
Measures of HKLR Viaduct Section