Content |
Chapter Title Page
1.1 Background___________________________________________________________________ 1-1
1.2 Designated Projects under EIA
Ordinance____________________________________________ 1-1
1.3 Objectives of the EIA Study________________________________________________________ 1-2
1.4 Key Environmental Issues_________________________________________________________ 1-3
1.5 Use of Relevant Studies__________________________________________________________ 1-5
1.6 Structure of the EIA Report________________________________________________________ 1-5
2.1 Project
Background______________________________________________________________ 2-1
2.2 Project Components_____________________________________________________________ 2-2
2.3 Need for the Project_____________________________________________________________ 2-2
2.4 Scope of the Project_____________________________________________________________ 2-4
2.5 Public Consultation______________________________________________________________ 2-6
2.6 Consideration of Design
Alternatives________________________________________________ 2-7
2.7 Description of Construction
Works_________________________________________________ 2-21
2.8 Consideration of Construction
Methodologies_________________________________________ 2-25
2.9 Tentative Construction Programme_________________________________________________ 2-33
2.10 Concurrent Projects____________________________________________________________ 2-34
3.1 Introduction____________________________________________________________________ 3-1
3.2 Environmental Legislations,
Standards and Guidelines__________________________________ 3-1
3.3 Baseline Condition and
Sensitive Receivers___________________________________________ 3-3
3.4 Identification of Pollution
Sources and Assessment Methodology___________________________ 3-6
3.5 Identification, Prediction and
Evaluation of Environmental Impact_________________________ 3-20
3.6 Mitigation of Adverse
Environmental Impact__________________________________________ 3-36
3.7 Evaluation of Residual Impact_____________________________________________________ 3-38
3.8 Environmental Monitoring and
Audit________________________________________________ 3-39
3.9 Conclusion___________________________________________________________________ 3-39
4.1 Introduction____________________________________________________________________ 4-1
4.2 Environmental
Legislation, Standards and Guidelines___________________________________ 4-1
4.3 Assessment Area, Noise
Sensitive Receivers and Background Noise Climate_________________ 4-5
4.4 Construction Phase Impact________________________________________________________ 4-8
4.5 Operation Phase Impact_________________________________________________________ 4-22
4.6 Environmental Monitoring and
Audit________________________________________________ 4-35
4.7 Conclusion___________________________________________________________________ 4-35
5.1 Introduction____________________________________________________________________ 5-1
5.2 Environmental Legislation,
Standards and Guidelines___________________________________ 5-1
5.3 Assessment Area, Water
Sensitive Receivers and Description of the Environment______________ 5-4
5.4 Assessment Methodology_________________________________________________________ 5-9
5.5 Identification, Prediction and
Evaluation of Environmental Impact_________________________ 5-10
5.6 Mitigation of Adverse
Environmental Impact__________________________________________ 5-14
5.7 Evaluation of Residual Impact_____________________________________________________ 5-19
5.8 Environmental Monitoring and
Audit________________________________________________ 5-19
5.9 Conclusion___________________________________________________________________ 5-19
6.1 Introduction____________________________________________________________________ 6-1
6.2 Assessment Approach and
Methodology_____________________________________________ 6-1
6.3 Design Assumptions, Parameters
and Criteria_________________________________________ 6-2
6.4 Existing Sewerage Conditions_____________________________________________________ 6-5
6.5 Estimated Pollutant Loads due
to the Project__________________________________________ 6-7
6.6 Proposed Mitigation Measures_____________________________________________________ 6-9
6.7 Short Term Measures during
Construction Phase______________________________________ 6-13
6.8 Environmental Monitoring and
Audit________________________________________________ 6-13
6.9 Conclusion___________________________________________________________________ 6-13
7.1 Introduction____________________________________________________________________ 7-1
7.2 Environmental Legislation,
Standards and Guidelines___________________________________ 7-1
7.3 Assessment Methodology_________________________________________________________ 7-2
7.4 Identification, Prediction and
Evaluation of Environmental Impact__________________________ 7-4
7.5 Opportunities for
Reducing Waste Generation and Maximise Re-Use________________________ 7-7
7.6 Mitigation of Adverse
Environmental Impacts__________________________________________ 7-9
7.7 Impacts
Caused by Handling, Collection and Disposal of C&D Materials____________________ 7-11
7.8 Waste
Handling Procedures and Routes_____________________________________________ 7-11
7.9 Evaluation of Residual Impacts____________________________________________________ 7-14
7.10 Environmental Monitoring and
Audit________________________________________________ 7-14
7.11 Conclusion___________________________________________________________________ 7-14
8.1 Introduction____________________________________________________________________ 8-1
8.2 Environmental Legislation,
Standards and Guidelines___________________________________ 8-1
8.3 Description of the Environment/
Baseline Conditions____________________________________ 8-1
8.4 Assessment Methodology_________________________________________________________ 8-4
8.5 Identification of Environmental
Impact_______________________________________________ 8-4
8.6 Prediction and Evaluation of
Environmental Impact_____________________________________ 8-6
8.7 Mitigation of Adverse
Environmental Impact___________________________________________ 8-8
8.8 Evaluation of Residual Impact______________________________________________________ 8-9
8.9 Environmental Monitoring and
Audit_________________________________________________ 8-9
8.10 Conclusion____________________________________________________________________ 8-9
9.1 Introduction____________________________________________________________________ 9-1
9.2 Background___________________________________________________________________ 9-1
9.3 Environmental Legislation,
Standards and Guidelines___________________________________ 9-7
9.4 Assessment
Area and Ecological Survey Methodology___________________________________ 9-8
9.5 Ecological
Baseline Condition____________________________________________________ 9-12
9.6 Habitat
and Species Evaluation__________________________________________________ 9-104
9.7 Identification / Evaluation of
Environmental Impact and Recommendation of Mitigation
Measures 9-134
9.8 Mitigation Measures___________________________________________________________ 9-172
9.9 Evaluation
of Cumulative Impact_________________________________________________ 9-181
9.10 Evaluation of Residual Impact____________________________________________________ 9-186
9.11 Environmental Monitoring and
Audit_______________________________________________ 9-186
9.12 Conclusion__________________________________________________________________ 9-187
9.13 Reference___________________________________________________________________ 9-189
10.1 Introduction___________________________________________________________________ 10-1
10.2 Environmental Legislation,
Standards and Guidelines__________________________________ 10-1
10.3 Assessment Methodology________________________________________________________ 10-1
10.4 Baseline
Condition_____________________________________________________________ 10-1
10.5 Identification, Prediction and
Evaluation of Environmental Impact_________________________ 10-2
10.6 Mitigation of Adverse
Environmental Impact__________________________________________ 10-2
10.7 Evaluation of Residual Impact_____________________________________________________ 10-2
10.8 Environmental Monitoring and
Audit________________________________________________ 10-2
10.9 Conclusion___________________________________________________________________ 10-3
10.10 References___________________________________________________________________ 10-3
11.1 Introduction___________________________________________________________________ 11-1
11.2 Environmental Legislation,
Standards and Guidelines__________________________________ 11-1
11.3 Scope and Content of the Study___________________________________________________ 11-2
11.4 Planning and Development
Control Framework______________________________________ 11-10
11.5 Baseline Conditions___________________________________________________________ 11-15
11.6 Landscape Impact Assessment__________________________________________________ 11-53
11.7 Visual Impact Assessment_____________________________________________________ 11-105
11.8 Cumulative Effects___________________________________________________________ 11-148
11.9 Environmental Monitoring and
Audit______________________________________________ 11-150
11.10 Conclusion_________________________________________________________________ 11-151
11.11 Glare Impact Assessment______________________________________________________ 11-161
12.1 Introduction___________________________________________________________________ 12-1
12.2 Environmental Legislations,
Standards and Guidelines_________________________________ 12-1
12.3 Assessment Methodology________________________________________________________ 12-3
12.4 Baseline Condition_____________________________________________________________ 12-7
12.5 Identification, Prediction and
Evaluation of Potential Impacts____________________________ 12-32
12.6 Mitigation Measures
(Preservation Proposals)_______________________________________ 12-43
12.7 Evaluation of Residual Impact____________________________________________________ 12-49
12.8 Environmental Monitoring and Audit_______________________________________________ 12-49
12.9 Conclusion__________________________________________________________________ 12-50
13.1 Introduction___________________________________________________________________ 13-1
13.2 Air Quality Impact______________________________________________________________ 13-1
13.3 Noise Impact__________________________________________________________________ 13-1
13.4 Water Quality Impact____________________________________________________________ 13-1
13.5 Sewerage and Sewage Treatment
Implications_______________________________________ 13-2
13.6 Waste Management Implications__________________________________________________ 13-2
13.7 Land Contamination____________________________________________________________ 13-2
13.8 Ecological Impact______________________________________________________________ 13-2
13.9 Fisheries Impact_______________________________________________________________ 13-3
13.10 Landscape, Visual and Glare
Impact________________________________________________ 13-3
13.11 Impact on Cultural Heritage______________________________________________________ 13-4
14.1 General______________________________________________________________________ 14-1
14.2 Summary of Environmental
Outcomes, Benefits and Mitigation Measures___________________ 14-1
15.1 General______________________________________________________________________ 15-1
Figures
Figure
1.1 Project Layout Plan
Figure
1.1a Project Layout Plan (Sheet 1 of 11)
Figure
1.1b Project Layout Plan (Sheet 2 of 11)
Figure 1.1c Project Layout Plan (Sheet 3 of 11)
Figure
1.1d Project Layout Plan (Sheet 4 of 11)
Figure
1.1e Project Layout Plan (Sheet 5 of 11)
Figure
1.1f Project Layout Plan (Sheet 6 of 11)
Figure
1.1g Project Layout Plan (Sheet 7 of 11)
Figure
1.1h Project Layout Plan (Sheet 8 of 11)
Figure
1.1i Project Layout Plan (Sheet 9 of 11)
Figure
1.1j Project Layout Plan (Sheet 10 of
11)
Figure
1.1k Project Layout Plan (Sheet 11 of 11)
Figure
2.1 Project Area – Description of
Works
Figure
2.1a Project Area – Description of Works
(Sheet 1 of 11)
Figure
2.1b Project Area – Description of Works (Sheet
2 of 11)
Figure
2.1c Project Area – Description of Works
(Sheet 3 of 11)
Figure
2.1d Project Area – Description of Works
(Sheet 4 of 11)
Figure
2.1e Project Area – Description of Works
(Sheet 5 of 11)
Figure
2.1f Project Area – Description of Works
(Sheet 6 of 11)
Figure
2.1g Project Area – Description of Works
(Sheet 7 of 11)
Figure
2.1h Project Area – Description of Works
(Sheet 8 of 11)
Figure
2.1i Project Area – Description of Works
(Sheet 9 of 11)
Figure
2.1j Project Area – Description of Works
(Sheet 10 of 11)
Figure
2.1k Project Area – Description of Works
(Sheet 11 of 11)
Figure
2.2 Finalised BCP Layout
Figure
2.3 Refined Alignment Options
Figure
2.4 Indicative Locations of Potential
Concurrent Projects
Figure
3-1.1 to 3-1.11 Location of Air Sensitive
Receivers and the Assessment Area)
Figure 3-2.1 to 3-2-11 Location
of Potential Dust Emission Source
Figure 3-3.1
to 3-3.17 Location of 30% Active Areas of Dust
Sources Assumed for Tier 2 Assessment
Figure 3-4.1a
to 3-4.9a Cumulative Result - Contour of Tier 1
Hourly TSP Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (unmitigated)
Figure 3-4.1b
to 3-4.9b Cumulative Result - Contour of Tier 1 Hourly TSP
Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (mitigated)
Figure 3-5.1
to 3-5.17 Cumulative Result - Contour of Tier 2 Hourly TSP
Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (mitigated)
Figure 3-6.1a to 3-6.9a Cumulative
Result -
Contour of Tier 1 Daily TSP Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (unmitigated)
Figure 3-6.1b
to 3-6.9b Cumulative Result - Contour of Tier 1 Daily TSP
Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (mitigated)
Figure 3-7.1 to
3-7.6 Cumulative Result - Contour of Tier 2 Daily TSP
Concentration (mg/m3) at 1.5m Above
Ground during
Construction Phase (mitigated)
Figure 3-8.1a to 3-8.9a Cumulative
Result -
Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground
during Construction
Phase (unmitigated)
Figure 3-8.1b
to 3-8.9b Cumulative Result - Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground
during Construction
Phase (mitigated)
Figure 3-9.1 to 3-9.11 Classifications of Road Types
Figure 3-10.1
to 3-10.9 Cumulative Result - Contour of Hourly NO2
Concentration (mg/m3) at 1.5m Above
Ground
during Operational
Phase (Stability Class D)
Figure 3-11.1 to 3-11.9 Cumulative
Result -
Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground
during Operational
Phase (Stability Class D)
Figure
3-12.1 to 3-12.9 Cumulative Result - Contour of Daily RSP Concentration (mg/m3) at 1.5m Above Ground
during Operational
Phase (Stability Class D)
Figure 3-13.1
to 3-13.9 Cumulative Result - Contour of Hourly NO2
Concentration (mg/m3) at 1.5m Above
Ground
during Operational
Phase (Stability Class F)
Figure 3-14.1 to 3-14.9 Cumulative
Result -
Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground
during Operational
Phase (Stability Class F)
Figure 3-15.1
to 3-15.9 Cumulative Result - Contour of Daily RSP Concentration (mg/m3) at 1.5m Above Ground
during Operational
Phase (Stability Class F)
Figure 3-16.1 to 3-16.9 Cumulative Result - Contour of Annual NO2
Concentration (mg/m3) at 1.5m Above
Ground
during Operational
Phase
Figure 3-17.1 to 3-17.9 Cumulative
Result -
Contour of Annual RSP Concentration (mg/m3) at 1.5m Above Ground
during Operational
Phase
Figure 4.1.1 Assessment Area and Outline Zoning
Plan
Figure 4.1.2 Recommended Development Plan (Sheet 1
of 2)
Figure 4.1.3 Recommended Development Plan (Sheet 2
of 2)
Figure 4.2 Representative Noise Sensitive
Receivers (Sheet 1 of 11)
Figure 4.3 Representative Noise Sensitive
Receivers (Sheet 2 of 11)
Figure 4.4 Representative Noise Sensitive
Receivers (Sheet 3 of 11)
Figure 4.5 Representative Noise Sensitive
Receivers (Sheet 4 of 11)
Figure 4.6 Representative Noise Sensitive
Receivers (Sheet 5 of 11)
Figure 4.7 Representative Noise Sensitive
Receivers (Sheet 6 of 11)
Figure 4.8 Representative Noise Sensitive
Receivers (Sheet 7 of 11)
Figure 4.9 Representative Noise Sensitive
Receivers (Sheet 8 of 11)
Figure 4.10 Representative Noise Sensitive
Receivers (Sheet 9 of 11)
Figure 4.11 Representative Noise Sensitive
Receivers (Sheet 10 of 11)
Figure 4.12 Representative Noise Sensitive
Receivers (Sheet 11 of 11)
Figure 4.13 Photos of Noise Sensitive Receivers
Figure 4.14 Photos of Noise Sensitive Receivers
Figure 4.15 Photos of Noise Sensitive Receivers
Figure 4.16 Photos of Noise Sensitive Receivers
Figure 4.17 Photos of Noise Sensitive Receivers
Figure 4.18 Schematic Diagram of Movable Noise
Barrier
Figure 4.19 Schematic Diagram of Full Noise
Enclosure for PME
Figure 4.20.1 Proposed Location of Noise Barriers
(Sheet 1 of 4)
Figure 4.20.2 Proposed Location of Noise Barriers
(Sheet 2 of 4)
Figure 4.20.3 Proposed Location of Noise Barriers
(Sheet 3 of 4)
Figure 4.20.4 Proposed Location of Noise Barriers (Sheet
4 of 4)
Figure 4.20.5 Cross-section Plans of Proposed Barriers
Figure 4.21.1 Fixed Plant of Boundary Control Point
Figure 4.21.2 Fixed Plant of North Tunnel North Portal
Figure 4.21.3 Fixed Plant of North Tunnel South Portal
Figure 4.21.4 Fixed Plant of Administration Building
Figure 4.21.5 Fixed Plant of South Tunnel North Portal
Figure 4.21.6 Fixed Plant of Mid-Ventilation Building
Figure 4.21.7 Fixed Plant of South Tunnel South Portal
Figure 5.1 Location of Water Control Zone
Figure 5.2 Locations of Key Water Sensitive
Receivers
Figure 5.3 Location Plan of the Interception
between Proposed Connecting Road Alignment and Existing Stream
Figure 6.1 General Layout Plan for BCP
Figure 6.2 General Layout Plan for the
Proposed Treatment Process
Figure 6.3 Proposed Landscape at Lower Deck
Level Plan for BCP
Figure 6.4 Proposed Landscape at Upper Deck
Level Plan for BCP
Figure 7.1 Potential Locations of Piers
Figure 7.2 Locations of Possible Temporary
Stockpiling Areas
Figure 9.1a Ecological Assessment Area
Figure 9.1b Sections of Works Area
Figure 9.2a Habitat Map (Key Plan)
Figure 9.2b Record
Locations of Mammal Species Yellow-bellied Weasel and Crab-eating Mongoose
around Assessment Area
Figure 9.3 Habitat Map (Sheet 1 of 12)
Figure 9.4 Habitat Map (Sheet 2 of 12)
Figure 9.5 Habitat Map (Sheet 3 of 12)
Figure 9.6 Habitat Map (Sheet 4 of 12)
Figure 9.7 Habitat Map (Sheet 5 of 12)
Figure 9.8 Habitat Map (Sheet 6 of 12)
Figure 9.9 Habitat Map (Sheet 7 of 12)
Figure 9.10 Habitat Map (Sheet 8 of 12)
Figure 9.11 Habitat Map (Sheet 9 of 12)
Figure 9.12 Habitat Map (Sheet 10 of 12)
Figure 9.13 Habitat Map (Sheet 11 of 12)
Figure 9.14 Habitat Map (Sheet 12 of 12)
Figure 9.15 Estimated
Extent of Habitat to be Affected (Sheet 1 of 11)
Figure 9.16 Estimated
Extent of Habitat to be Affected (Sheet 2 of 11)
Figure 9.17 Estimated
Extent of Habitat to be Affected (Sheet 3 of 11)
Figure 9.18 Estimated
Extent of Habitat to be Affected (Sheet 4 of 11)
Figure 9.19 Estimated
Extent of Habitat to be Affected (Sheet 5 of 11)
Figure 9.20 Estimated
Extent of Habitat to be Affected (Sheet 6 of 11)
Figure 9.21 Estimated
Extent of Habitat to be Affected (Sheet 7 of 11)
Figure 9.22 Estimated
Extent of Habitat to be Affected (Sheet 8 of 11)
Figure 9.23 Estimated
Extent of Habitat to be Affected (Sheet 9 of 11)
Figure 9.24 Estimated
Extent of Habitat to be Affected (Sheet 10 of 11)
Figure 9.25 Estimated
Extent of Habitat to be Affected (Sheet 11 of 11)
Figure 9.26 Potential Woodland Compensation Area
Figure 9.27 Indicative Boundary
of the Potential Wetland Compensation Area
Figure
9.28 Conceptual
Plan and Typical Cross-section Views of the Proposed Wetland Compensation Area
Figure 11.1.0 Project
Profile – Key Plan
Figure 11.1.1 Project Profile – Section A, Zone 1
Figure 11.1.2 Project Profile – Section A, Zones 1
& 2
Figure 11.1.3 Project Profile – Section A, Zones 2
& 3
Figure 11.1.4 Project Profile – Section A, Zones 2 & 3
Figure 11.1.5 Project Profile – Section B
Figure 11.1.6 Project Profile – Section C
Figure 11.2 Not
Used
Figure 11.3.1 Proposed Landscape at Lower Deck Level
Plan for BCP
Figure 11.3.2 Proposed Layout Plan at Upper Deck Level
for BCP
Figure 11.3.3 BCP - Elevation
Figure 11.3.4 Ventilation Building Type A – G/F to 3/F
Layout Plans
Figure 11.3.5 Ventilation Building Type A – 4/F Layout
Plans & Section
Figure 11.3.6 Ventilation Building Type B – G/F to 3/F
Layout Plans
Figure 11.3.7 Ventilation Building Type B – Section
Figure 11.3.8 Ventilation Building Type C – G/F to 3/F
Layout Plans
Figure 11.3.9 Ventilation Building Type C – Section
Figure 11.3.10 Administration Building – Ground Floor
Layout Plan
Figure 11.3.11 Administration Building – Section A-A, B-B
Figure 11.3.12 Viaduct – Typical Section
Figure 11.4.0 Existing Zonings within 500m Study Area
– Key Plan
Figure 11.4.1 Existing Zonings within 500m Study Area
Section A, Zones 1 & 2
Figure 11.4.2 Existing Zonings within 500m Study Area
Section A, Zones 1 & 2
Figure 11.4.3 Existing Zonings within 500m Study Area
Section A, Zones 2 & 3
Figure 11.4.4 Existing Zonings within 500m Study Area
Section A, Zones 2 & 3
Figure 11.4.5 Existing Zonings within 500m Study Area
Section B
Figure 11.4.6 Existing Zonings within 500m Study Area
Section C
Figure 11.5.1 Landscape Resources – Key Plan
Figure 11.5.2 Landscape
Resources – Section A, Zones 1 & 2
Figure 11.5.3 Landscape
Resources – Section A, Zones 1 & 2
Figure 11.5.4 Landscape
Resources – Section A, Zones 2 & 3
Figure 11.5.5 Landscape
Resources – Section A, Zones 2 & 3
Figure 11.5.6 Landscape
Resources – Section B
Figure 11.5.7 Landscape
Resources – Section C
Figure 11.5.8 Landscape
Character Areas – Key Plan
Figure 11.5.9 Landscape
Character Areas – Section A, Zones 1 & 2
Figure 11.5.10 Landscape
Character Areas – Section A, Zones 1 & 2
Figure 11.5.11 Landscape
Character Areas – Section A, Zones 2 & 3
Figure 11.5.12 Landscape
Character Areas – Section A, Zones 2 & 3
Figure 11.5.13 Landscape
Character Areas – Section B
Figure 11.5.14 Landscape
Character Areas – Section C
Figure 11.5.15 Photorecord
of Various Landscape Resources – Section A, Zone 1
Figure 11.5.16 Photorecord
of Various Landscape Resources – Section A, Zone 2
Figure 11.5.17 Photorecord
of Various Landscape Resources – Section A, Zone 3
Figure 11.5.18 Photorecord
of Various Landscape Resources – Section B
Figure 11.5.19 Photorecord
of Various Landscape Resources – Section C
Figure 11.5.20 Visual
Envelope
Figure 11.5.21 Location
Plan of Visual Sensitive Receivers – Key Plan
Figure 11.5.22 Location
Plan of Visual Sensitive Receivers (Sheet 1 of 4)
Figure 11.5.23 Location Plan
of Visual Sensitive Receivers (Sheet 2 of 4)
Figure 11.5.24 Location
Plan of Visual Sensitive Receivers (Sheet 3 of 4)
Figure 11.5.25 Location
Plan of Visual Sensitive Receivers (Sheet 4 of 4)
Figure 11.5.26 Photorecords
of Visually Sensitive Receivers (Sheet 1 of 2)
Figure 11.5.27 Photorecords
of Visually Sensitive Receivers (Sheet 2 of 2)
Figure 11.6.0 Impact on
Landscape Resources – Key Plan
Figure 11.6.1 Impact on
Landscape Resources – Section A, Zone 1
Figure 11.6.2 Impact on
Landscape Resources – Section A, Zones 1 & 2
Figure 11.6.3 Impact on
Landscape Resources – Section A, Zone 2
Figure 11.6.4 Impact on
Landscape Resources – Section A, Zone 3
Figure 11.6.5 Impact on
Landscape Resources – Section B
Figure 11.6.6 Impact on
Landscape Resources – Section C
Figure 11.6.7 Impact on
Landscape Character Areas – Key Plan
Figure 11.6.8 Impact on
Landscape Character Areas – Section A, Zone 1
Figure 11.6.9 Impact on
Landscape Character Areas – Section A, Zones 1 & 2
Figure 11.6.10 Impact on
Landscape Character Areas – Section A, Zone 2
Figure 11.6.11 Impact on
Landscape Character Areas – Section A, Zone 3
Figure 11.6.12 Impact on
Landscape Character Areas – Section B
Figure 11.6.13 Impact on
Landscape Character Areas – Section C
Figure 11.7.0 Landscape
and Visual Mitigation Plan – Key Plan
Figure 11.7.1 Landscape
and Visual Mitigation Plan – Section A, Zone 1
Figure 11.7.2 Landscape
and Visual Mitigation Plan – Section A, Zones 1 & 2
Figure 11.7.3 Landscape
and Visual Mitigation Plan – Section A, Zone 2
Figure 11.7.4 Landscape
and Visual Mitigation Plan – Section A, Zone 3
Figure 11.7.5 Landscape
and Visual Mitigation Plan – Section B
Figure 11.7.6 Landscape
and Visual Mitigation Plan – Section C
Figure 11.7.7 VPs for
Photomontages – Key Plan
Figure 11.7.8 VP1
Photomontage at Ha Heung Yuen
Figure 11.7.9 VP2
Photomontage at Tsung Yuen Ha
Figure 11.7.10 VP3
Photomontage at Kaw Liu Village
Figure 11.7.11 VP4
Photomontage at Nga Yiu Ha
Figure 11.7.12 VP5
Photomontage at Lung Mei Teng
Figure 11.7.13 VP6
Photomontage at Village West of Man Uk Pin
Figure 11.7.14 VP7
Photomontage at Tai Tong Wu
Figure 11.7.15 VP8
Photomontage at Loi Tung Village
Figure 11.7.16 VP9
Photomontage at Lung Shan Temple
Figure 11.7.17 VP10
Photomontage at Dawning Views
Figure 11.7.18 VP11
Photomontage at Yuen Leng
Figure 11.7.19 VP12
Photomontage at Wilson Trail
Figure 12.1 Key Plan For Cultural
Heritage Resources Recorded by AMO within the Study Area
Figure 12.2 Key
Plan For Built Heritage
Figure 12.2.1 1:1000
Map Showing Built Heritage Identified Within the Boundary Control Point Section
(Sheet 1
of 2)
Figure 12.2.2 1:1000
Map Showing Built Heritage Identified Within the Boundary Control Point Section
(Sheet 2 of 2)
Figure 12.2.3 1:1000 Map
Showing Built Heritage Identified Within Section Between Lin Ma Hang and
Frontier Closed Area Boundary (Sheet 1 of 4)
Figure
12.2.4 1:1000 Map Showing Built Heritage
Identified Within Section Between Lin Ma Hang and Frontier
Closed Area Boundary (Sheet 2 of 4)
Figure 12.2.5 1:1000 Map
Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier
Closed Area Boundary (Sheet 3 of 4)
Figure 12.2.6 1:1000 Map
Showing Built Heritage Identified Within Section Between Lin Ma Hang and
Frontier Closed Area Boundary (Sheet 4 of 4)
Figure 12.2.7a 1:1000 Map
Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng
Shan (Sheet 1 of 6)
Figure 12.2.7b 1:1000 Map
Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng
Shan (Sheet 2 of 6)
Figure 12.2.8 1:1000 Map Showing Built Heritage
Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 3 of 6)
Figure 12.2.9a 1:1000 Map
Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng
Shan (Sheet 4 of 6)
Figure 12.2.9b 1:1000 Map
Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng
Shan (Sheet 5 of 6)
Figure 12.2.9c 1:1000 Map
Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng
Shan (Sheet 6 of 6)
Figure 12.2.10a 1:1000 Map Showing Built Heritage Identified
Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 1 of 3)
Figure 12.2.10b 1:1000 Map Showing Built Heritage Identified
Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 2 of 3)
Figure 12.2.10c 1:1000 Map Showing Built Heritage Identified
Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 3 of 3)
Figure 12.2.11a 1:1000 Map Showing Built Heritage Identified
Within Sha Tau Kok Road Section (Sheet 1 of 3)
Figure 12.2.11b 1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok
Road Section (Sheet 2 of 3)
Figure 12.2.12 1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok
Road Section (Sheet 3 of 3)
Figure 12.2.13 1:1000 Map Showing Built Heritage
Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 1 of 5)
Figure 12.2.14 1:1000 Map Showing Built Heritage
Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 2 of 5)
Figure 12.2.15 1:1000 Map Showing Built Heritage
Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 3 of 5)
Figure 12.2.16 1:1000 Map Showing Built Heritage
Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 4 of 5)
Figure 12.2.17 1:1000 Map Showing Built Heritage
Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 5 of 5)
Figure 12.2.18 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 1 of 6)
Figure 12.2.19 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 2 of 6)
Figure 12.2.20 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 3 of 6)
Figure 12.2.21 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 4 of 6)
Figure 12.2.22 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 5 of 6)
Figure 12.2.23 1:1000 Map Showing Built Heritage Identified Within Fanling
Section (Sheet 6 of 6)
Figure 12.3 Key Plan for Geology Map of CHIA Study Area
Figure 12.4.1 Known Site of Archaeological Interest – Ping Che
Archaeological Site
Figure 12.4.2 Known Site of Archaeological Interest – Queen’s Hill
Archaeological Site
Figure 12.5 Key Plan for Archaeological Survey
Figure 12.5.1 Location Plan of Test Pit and Auger Hole within BCP Section
Figure 12.5.2 Location Plan of Test Pit and Auger Hole
within Section Between Lin Ma Hang and Frontier Closed Area Boundary
Figure 12.5.3 Location Plan of Test Pit and Auger Hole
within Section Between Ping Yeung and Wo Keng Shan (Sheet 1 of 2)
Figure 12.5.4 Location Plan of Test Pit and Auger Hole
within Section Between Ping Yeung and Wo Keng Shan (Sheet 2 of 2)
Figure 12.5.5 Location Plan of Auger Hole within Fanling Section
Figure 12.6 Key Plan for Archaeological Potential
Figure 12.6.1 Area of Archaeological Potential and
Further Archaeological Survey within Section Between Lin Ma Hang and Frontier Closed Area Boundary
Figure 12.6.2 Area of Archaeological Potential and
Further Archaeological Survey within Section Between Ping Yeung and Wo Keng
Shan (Sheet 1 of 2)
Figure 12.6.3 Area of Archaeological Potential and
Further Archaeological Survey within Section Between Ping Yeung and Wo Keng
Shan (Sheet 2 of 2)
Figure 12.6.4 Area of Further Archaeological Survey within Sha Tau Kok Road Section
Figure 12.6.5 Area of Further Archaeological Survey within Lau Shui Heung Tunnel Section
Figure 12.6.6 Area of Further Archaeological Survey within Fanling Section
Appendices
Appendix 2.1 Tentative Construction Programme
Appendix 2.2 Summary Timeline of Concurrent Projects
Appendix 2.3 Summary of Design Alternatives
considered during the Feasibility Study
Appendix 2.4 Difference between the Current
Alignment and the Old Alignment from the EIA Study Brief
Appendix 3.1a Details of Dust Emission
Sources for 1-hour and Daily TSP Assessment (Tier 1)
Appendix 3.1b Details of Dust Emission
Sources for Annual TSP Assessment
Appendix 3.1c Details of Dust Emission
Sources for 1-hour and Daily TSP Assessment (Tier 2)
Appendix 3.1d Estimation of Percentage
Active Area for Different Stages of Construction Activities
Appendix 3.1e Estimation of Total
Percentage Active Area for Hourly, Daily and Annual TSP Assessment
Appendix 3.1f Estimation of Dust
Suppression Efficiency
Appendix 3.2 Exhaust Technology
Fractions
Appendix 3.3 Vehicle Population in Years
2018, 2023, 2028 and 2033.
Appendix 3.4 Diurnal Traffic Pattern,
VMT and Trips in 2018, 2023, 2028 and 2033
Appendix 3.4-1 Traffic Forecast for 2018,
2023, 2028 and 2033
Appendix 3.4-2 Road Type and Distance
Appendix 3.4-3 Trips and VMT for Petrol
Vehicles in Hong Kong
Appendix 3.4-4 VMT and Trips for 2018, 2023,
2028 and 2033 in the Study Area
Appendix 3.5 Relative Humidity and
Temperature
Appendix
3.6 Peak Hour Speed, Volume/Capacity Ratio
and Speed Fractions in 2018, 2023, 2028 and 2033.
Appendix 3.7a Comparison of Emissions
with Peak and Non-peak Speeds in 2018, 2023, 2028 and 2033
Appendix 3.7b Calculation of Worst Case
Emission Rates for Different Road Types
Appendix
3.8 Calculations of the Composite Emission
Factors
Appendix
3.9a Calculations of the Emission Rates for
Ventilation Shafts and Building
Appendix
3.9b Selection of Worst Case Hourly
Emission for Calculation of Emission Rates for Ventilation Shafts
and
Building
Appendix
3.10a Calculations of Idling Emissions
Appendix
3.10b Determination of Idling Emission
Factors as Extracted from the Feasibility Study
Appendix
3.10c Estimation of NOx Composite Idling Emission
Factors
Appendix 4.1 Unmitigated Construction Plant Inventory
Appendix 4.2 Unmitigated Construction Airborne Noise
Impacts
Appendix 4.3 Mitigated Construction Plant Inventory
Appendix 4.4 Mitigated Construction Airborne Noise
Impact
Appendix 4.5 Unmitigated Construction Ground-borne
Noise Impacts
Appendix 4.6 Traffic Data and Road Traffic Network
Appendix 4.7 Comparison Scenario Between With and
Without Project
Appendix 4.8 Unmitigated Road Traffic Noise Leve
Appendix 4.9 Mitigated Road Traffic Noise Level
Appendix 4.10 Sample Calculation of Fixed Plant Noise
Appendix 6.1 Estimation of Sewage Flow at Existing
Site
Appendix 6.2 Estimation of Pollutant Loadings from
Existing Site
Appendix 6.3 Estimation of Pollutant Loadings from
Proposed Development
Appendix 6.4 Estimation
of Pollutant Loadings Discharge to Deep Bay from Proposed Development
Appendix 6.5 Estimation
of Pollutant Loadings Discharge to Deep Bay After
Reuse
Appendix 8.1 Updated Contamination Assessment Plan
(CAP) submitted in July 2010
Appendix
8.2 Acceptance
of CAP by EPD in October 2010
Appendix 9.1 Ecological Survey Locations and Study Boundary
Appendix 9.2 Plates
Appendix
9.3a Plant
Species recorded in Section 1 – BCP
Appendix
9.3b Plant
Species recorded in Sections 2 & 3 - Lin Ma Hang to Frontier Closed Area
Boundary and Ping
Yeung to Wo Keng Shan
Appendix
9.3c Plant
Species recorded in Section 5 - Sha Tau Kok Road
(between North and South Tunnel)
Appendix
9.3d Plant
Species recorded in Section 7 – Fanling
Appendix
9.4 Woodland
Compensation Plan
Appendix
9.5a Fauna recorded in BCP area
Appendix
9.5b Fauna recorded in the Frontier Closed Area
Appendix
9.5c Fauna recorded in Nga Yiu
Ha, Ping Yeung and Wo Keng Shan Area
Appendix 9.5d Fauna recorded in the North Tunnel
Aboveground Area
Appendix 9.5e Fauna recorded in Shan Tong, Man Uk Pin and Loi Tung Area
Appendix 9.5f Fauna recorded in Tan Chuk
Hang and Lau Shui Heung Area
Appendix 9.5g Fauna recorded in Wo Hop Shek and Yuen Leng Area
Appendix 9.6 (Not used)
Appendix 9.7 Consideration of Alternative Portal
Locations for Woodland Avoidance
Appendix 11.1 CIE
and Luminarie Inputs
Appendix 11.2 Modelled
Luminarie and VSR Locations
Appendix 12.1 Bibliography
Appendix
12.2a Detailed
Records of Identified Built Heritage within CHIA Study Area of the BCP Section
Appendix 12.2b Detailed Records of Identified Built Heritage
within CHIA Study Area of the Section between Lin Ma Hang and Frontier Closed
Area Boundary
Appendix
12.2c Detailed Records of
Identified Built Heritage within CHIA Study Area of the Section between Ping Yeung
and Wo Keng Shan
Appendix
12.2d Detailed Records of Identified
Built Heritage within CHIA Study Area of the Cheung Shan Tunnel Section (North
Tunnel)
Appendix
12.2e Detailed Records of Identified
Built Heritage within CHIA Study Area of the Sha Tau Kok
Road Section (Between North and South Tunnel)
Appendix
12.2f Detailed Records of Identified
Built Heritage within CHIA Study Area of the Lau Shui
Heung Tunnel Section (South Tunnel)
Appendix 12.2g Detailed Records of Identified Built Heritage
within CHIA Study Area of the Fanling Section
Appendix 12.3a Auger Hole Records
Appendix 12.3b Test Pit Records
Appendix
12.3c Land Survey Records