Content


Chapter    Title                                                                                                                           Page

1.               Introduction                                                                                                                      1-1

1.1              Background___________________________________________________________________ 1-1

1.2              Designated Projects under EIA Ordinance____________________________________________ 1-1

1.3              Objectives of the EIA Study________________________________________________________ 1-2

1.4              Key Environmental Issues_________________________________________________________ 1-3

1.5              Use of Relevant Studies__________________________________________________________ 1-5

1.6                  Structure of the EIA Report________________________________________________________ 1-5

2.               Project Description                                                                                                           2-1

2.1              Project Background______________________________________________________________ 2-1

2.2              Project Components_____________________________________________________________ 2-2

2.3              Need for the Project_____________________________________________________________ 2-2

2.4              Scope of the Project_____________________________________________________________ 2-4

2.5              Public Consultation______________________________________________________________ 2-6

2.6              Consideration of Design Alternatives________________________________________________ 2-7

2.7              Description of Construction Works_________________________________________________ 2-21

2.8              Consideration of Construction Methodologies_________________________________________ 2-25

2.9              Tentative Construction Programme_________________________________________________ 2-33

2.10                Concurrent Projects____________________________________________________________ 2-34

3.               Air Quality Impact                                                                                                             3-1

3.1              Introduction____________________________________________________________________ 3-1

3.2              Environmental Legislations, Standards and Guidelines__________________________________ 3-1

3.3              Baseline Condition and Sensitive Receivers___________________________________________ 3-3

3.4              Identification of Pollution Sources and Assessment Methodology___________________________ 3-6

3.5              Identification, Prediction and Evaluation of Environmental Impact_________________________ 3-20

3.6              Mitigation of Adverse Environmental Impact__________________________________________ 3-36

3.7              Evaluation of Residual Impact_____________________________________________________ 3-38

3.8              Environmental Monitoring and Audit________________________________________________ 3-39

3.9                  Conclusion___________________________________________________________________ 3-39

4.               Noise Impact Assessment                                                                                                 4-1

4.1              Introduction____________________________________________________________________ 4-1

4.2              Environmental Legislation, Standards and Guidelines___________________________________ 4-1

4.3              Assessment Area, Noise Sensitive Receivers and Background Noise Climate_________________ 4-5

4.4              Construction Phase Impact________________________________________________________ 4-8

4.5              Operation Phase Impact_________________________________________________________ 4-22

4.6              Environmental Monitoring and Audit________________________________________________ 4-35

4.7                  Conclusion___________________________________________________________________ 4-35

5.               Water Quality Impact                                                                                                         5-1

5.1              Introduction____________________________________________________________________ 5-1

5.2              Environmental Legislation, Standards and Guidelines___________________________________ 5-1

5.3              Assessment Area, Water Sensitive Receivers and Description of the Environment______________ 5-4

5.4              Assessment Methodology_________________________________________________________ 5-9

5.5              Identification, Prediction and Evaluation of Environmental Impact_________________________ 5-10

5.6              Mitigation of Adverse Environmental Impact__________________________________________ 5-14

5.7              Evaluation of Residual Impact_____________________________________________________ 5-19

5.8              Environmental Monitoring and Audit________________________________________________ 5-19

5.9                  Conclusion___________________________________________________________________ 5-19

6.               Sewerage and Sewage Treatment Impact                                                                           6-1

6.1              Introduction____________________________________________________________________ 6-1

6.2              Assessment Approach and Methodology_____________________________________________ 6-1

6.3              Design Assumptions, Parameters and Criteria_________________________________________ 6-2

6.4              Existing Sewerage Conditions_____________________________________________________ 6-5

6.5              Estimated Pollutant Loads due to the Project__________________________________________ 6-7

6.6              Proposed Mitigation Measures_____________________________________________________ 6-9

6.7              Short Term Measures during Construction Phase______________________________________ 6-13

6.8              Environmental Monitoring and Audit________________________________________________ 6-13

6.9                  Conclusion___________________________________________________________________ 6-13

7.               Waste Management Implications                                                                                       7-1

7.1              Introduction____________________________________________________________________ 7-1

7.2              Environmental Legislation, Standards and Guidelines___________________________________ 7-1

7.3              Assessment Methodology_________________________________________________________ 7-2

7.4              Identification, Prediction and Evaluation of Environmental Impact__________________________ 7-4

7.5              Opportunities for Reducing Waste Generation and Maximise Re-Use________________________ 7-7

7.6              Mitigation of Adverse Environmental Impacts__________________________________________ 7-9

7.7              Impacts Caused by Handling, Collection and Disposal of C&D Materials____________________ 7-11

7.8              Waste Handling Procedures and Routes_____________________________________________ 7-11

7.9              Evaluation of Residual Impacts____________________________________________________ 7-14

7.10            Environmental Monitoring and Audit________________________________________________ 7-14

7.11                Conclusion___________________________________________________________________ 7-14

8.               Land Contamination                                                                                                          8-1

8.1              Introduction____________________________________________________________________ 8-1

8.2              Environmental Legislation, Standards and Guidelines___________________________________ 8-1

8.3              Description of the Environment/ Baseline Conditions____________________________________ 8-1

8.4              Assessment Methodology_________________________________________________________ 8-4

8.5              Identification of Environmental Impact_______________________________________________ 8-4

8.6              Prediction and Evaluation of Environmental Impact_____________________________________ 8-6

8.7              Mitigation of Adverse Environmental Impact___________________________________________ 8-8

8.8              Evaluation of Residual Impact______________________________________________________ 8-9

8.9              Environmental Monitoring and Audit_________________________________________________ 8-9

8.10                Conclusion____________________________________________________________________ 8-9

9.               Ecological Impact                                                                                                             9-1

9.1              Introduction____________________________________________________________________ 9-1

9.2              Background___________________________________________________________________ 9-1

9.3              Environmental Legislation, Standards and Guidelines___________________________________ 9-7

9.4              Assessment Area and Ecological Survey Methodology___________________________________ 9-8

9.5              Ecological Baseline Condition____________________________________________________ 9-12

9.6              Habitat and Species Evaluation__________________________________________________ 9-104

9.7              Identification / Evaluation of Environmental Impact and Recommendation of Mitigation Measures 9-134

9.8              Mitigation Measures___________________________________________________________ 9-172

9.9              Evaluation of Cumulative Impact_________________________________________________ 9-181

9.10            Evaluation of Residual Impact____________________________________________________ 9-186

9.11            Environmental Monitoring and Audit_______________________________________________ 9-186

9.12            Conclusion__________________________________________________________________ 9-187

9.13                Reference___________________________________________________________________ 9-189

10.              Fisheries Impact                                                                                                             10-1

10.1            Introduction___________________________________________________________________ 10-1

10.2            Environmental Legislation, Standards and Guidelines__________________________________ 10-1

10.3            Assessment Methodology________________________________________________________ 10-1

10.4            Baseline Condition_____________________________________________________________ 10-1

10.5            Identification, Prediction and Evaluation of Environmental Impact_________________________ 10-2

10.6            Mitigation of Adverse Environmental Impact__________________________________________ 10-2

10.7            Evaluation of Residual Impact_____________________________________________________ 10-2

10.8            Environmental Monitoring and Audit________________________________________________ 10-2

10.9            Conclusion___________________________________________________________________ 10-3

10.10              References___________________________________________________________________ 10-3

11.              Landscape, Visual and Glare Impact                                                                                11-1

11.1            Introduction___________________________________________________________________ 11-1

11.2            Environmental Legislation, Standards and Guidelines__________________________________ 11-1

11.3            Scope and Content of the Study___________________________________________________ 11-2

11.4            Planning and Development Control Framework______________________________________ 11-10

11.5            Baseline Conditions___________________________________________________________ 11-15

11.6            Landscape Impact Assessment__________________________________________________ 11-53

11.7            Visual Impact Assessment_____________________________________________________ 11-105

11.8            Cumulative Effects___________________________________________________________ 11-148

11.9            Environmental Monitoring and Audit______________________________________________ 11-150

11.10          Conclusion_________________________________________________________________ 11-151

11.11              Glare Impact Assessment______________________________________________________ 11-161

12.              Impact on Cultural Heritage                                                                                              12-1

12.1            Introduction___________________________________________________________________ 12-1

12.2            Environmental Legislations, Standards and Guidelines_________________________________ 12-1

12.3            Assessment Methodology________________________________________________________ 12-3

12.4            Baseline Condition_____________________________________________________________ 12-7

12.5            Identification, Prediction and Evaluation of Potential Impacts____________________________ 12-32

12.6            Mitigation Measures (Preservation Proposals)_______________________________________ 12-43

12.7            Evaluation of Residual Impact____________________________________________________ 12-49

12.8            Environmental Monitoring and Audit_______________________________________________ 12-49

12.9                Conclusion__________________________________________________________________ 12-50

13.              Environmental Monitoring and Audit                                                                                 13-1

13.1            Introduction___________________________________________________________________ 13-1

13.2            Air Quality Impact______________________________________________________________ 13-1

13.3            Noise Impact__________________________________________________________________ 13-1

13.4            Water Quality Impact____________________________________________________________ 13-1

13.5            Sewerage and Sewage Treatment Implications_______________________________________ 13-2

13.6            Waste Management Implications__________________________________________________ 13-2

13.7            Land Contamination____________________________________________________________ 13-2

13.8            Ecological Impact______________________________________________________________ 13-2

13.9            Fisheries Impact_______________________________________________________________ 13-3

13.10          Landscape, Visual and Glare Impact________________________________________________ 13-3

13.11              Impact on Cultural Heritage______________________________________________________ 13-4

14.              Conclusion                                                                                                                     14-1

14.1            General______________________________________________________________________ 14-1

14.2                Summary of Environmental Outcomes, Benefits and Mitigation Measures___________________ 14-1

15.              Implementation Schedule of Mitigation Measures                                                             15-1

15.1                General______________________________________________________________________ 15-1

 

Figures

Figure 1.1              Project Layout Plan

Figure 1.1a           Project Layout Plan (Sheet 1 of 11)

Figure 1.1b           Project Layout Plan (Sheet 2 of 11)

Figure 1.1c            Project Layout Plan (Sheet 3 of 11)

Figure 1.1d           Project Layout Plan (Sheet 4 of 11)

Figure 1.1e           Project Layout Plan (Sheet 5 of 11)

Figure 1.1f            Project Layout Plan (Sheet 6 of 11)

Figure 1.1g           Project Layout Plan (Sheet 7 of 11)

Figure 1.1h           Project Layout Plan (Sheet 8 of 11)

Figure 1.1i             Project Layout Plan (Sheet 9 of 11)

Figure 1.1j             Project Layout Plan (Sheet 10 of 11)

Figure 1.1k            Project Layout Plan (Sheet 11 of 11)

Figure 2.1              Project Area – Description of Works

Figure 2.1a           Project Area – Description of Works (Sheet 1 of 11)

Figure 2.1b           Project Area – Description of Works (Sheet 2 of 11)

Figure 2.1c            Project Area – Description of Works (Sheet 3 of 11)

Figure 2.1d           Project Area – Description of Works (Sheet 4 of 11)

Figure 2.1e           Project Area – Description of Works (Sheet 5 of 11)

Figure 2.1f            Project Area – Description of Works (Sheet 6 of 11)

Figure 2.1g           Project Area – Description of Works (Sheet 7 of 11)

Figure 2.1h           Project Area – Description of Works (Sheet 8 of 11)

Figure 2.1i             Project Area – Description of Works (Sheet 9 of 11)

Figure 2.1j             Project Area – Description of Works (Sheet 10 of 11)

Figure 2.1k            Project Area – Description of Works (Sheet 11 of 11)

Figure 2.2              Finalised BCP Layout

Figure 2.3              Refined Alignment Options

Figure 2.4              Indicative Locations of Potential Concurrent Projects

 

Figure 3-1.1 to 3-1.11       Location of Air Sensitive Receivers and the Assessment Area)

Figure 3-2.1 to 3-2-11         Location of Potential Dust Emission Source

Figure 3-3.1 to 3-3.17         Location of 30% Active Areas of Dust Sources Assumed for Tier 2 Assessment

Figure 3-4.1a to 3-4.9a       Cumulative Result - Contour of Tier 1 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (unmitigated)

Figure 3-4.1b to 3-4.9b     Cumulative Result  - Contour of Tier 1 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-5.1 to 3-5.17       Cumulative Result  - Contour of Tier 2 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-6.1a to 3-6.9a                       Cumulative Result  - Contour of Tier 1 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (unmitigated)

Figure 3-6.1b to 3-6.9b     Cumulative Result  - Contour of Tier 1 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-7.1 to 3-7.6         Cumulative Result  - Contour of Tier 2 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-8.1a to 3-8.9a       Cumulative Result  - Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground

during Construction Phase (unmitigated)

Figure 3-8.1b to 3-8.9b     Cumulative Result  - Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground

during Construction Phase (mitigated)

Figure 3-9.1 to 3-9.11       Classifications of Road Types

Figure 3-10.1 to 3-10.9     Cumulative Result  - Contour of Hourly NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-11.1 to 3-11.9                       Cumulative Result  - Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-12.1 to 3-12.9     Cumulative Result  - Contour of  Daily RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-13.1 to 3-13.9     Cumulative Result  - Contour of Hourly NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-14.1 to 3-14.9                       Cumulative Result  - Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-15.1 to 3-15.9     Cumulative Result  - Contour of  Daily RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-16.1 to 3-16.9                 Cumulative Result  - Contour of Annual NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase

Figure 3-17.1 to 3-17.9                       Cumulative Result  - Contour of  Annual RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase

 

Figure 4.1.1          Assessment Area and Outline Zoning Plan

Figure 4.1.2          Recommended Development Plan (Sheet 1 of 2)

Figure 4.1.3          Recommended Development Plan (Sheet 2 of 2)

Figure 4.2              Representative Noise Sensitive Receivers (Sheet 1 of 11)

Figure 4.3              Representative Noise Sensitive Receivers (Sheet 2 of 11)

Figure 4.4              Representative Noise Sensitive Receivers (Sheet 3 of 11)

Figure 4.5              Representative Noise Sensitive Receivers (Sheet 4 of 11)

Figure 4.6              Representative Noise Sensitive Receivers (Sheet 5 of 11)

Figure 4.7              Representative Noise Sensitive Receivers (Sheet 6 of 11)

Figure 4.8              Representative Noise Sensitive Receivers (Sheet 7 of 11)

Figure 4.9              Representative Noise Sensitive Receivers (Sheet 8 of 11)

Figure 4.10           Representative Noise Sensitive Receivers (Sheet 9 of 11)

Figure 4.11           Representative Noise Sensitive Receivers (Sheet 10 of 11)

Figure 4.12           Representative Noise Sensitive Receivers (Sheet 11 of 11)

Figure 4.13           Photos of Noise Sensitive Receivers

Figure 4.14           Photos of Noise Sensitive Receivers

Figure 4.15           Photos of Noise Sensitive Receivers

Figure 4.16           Photos of Noise Sensitive Receivers

Figure 4.17           Photos of Noise Sensitive Receivers

Figure 4.18           Schematic Diagram of Movable Noise Barrier

Figure 4.19           Schematic Diagram of Full Noise Enclosure for PME

Figure 4.20.1        Proposed Location of Noise Barriers (Sheet 1 of 4)

Figure 4.20.2        Proposed Location of Noise Barriers (Sheet 2 of 4)

Figure 4.20.3        Proposed Location of Noise Barriers (Sheet 3 of 4)

Figure 4.20.4        Proposed Location of Noise Barriers (Sheet 4 of 4)

Figure 4.20.5        Cross-section Plans of Proposed Barriers

Figure 4.21.1        Fixed Plant of Boundary Control Point

Figure 4.21.2        Fixed Plant of North Tunnel North Portal

Figure 4.21.3        Fixed Plant of North Tunnel South Portal

Figure 4.21.4        Fixed Plant of Administration Building

Figure 4.21.5        Fixed Plant of South Tunnel North Portal

Figure 4.21.6        Fixed Plant of Mid-Ventilation Building

Figure 4.21.7        Fixed Plant of South Tunnel South Portal

 

Figure 5.1              Location of Water Control Zone

Figure 5.2              Locations of Key Water Sensitive Receivers

Figure 5.3              Location Plan of the Interception between Proposed Connecting Road Alignment and Existing Stream

 

Figure 6.1              General Layout Plan for BCP
Figure 6.2              General Layout Plan for the Proposed Treatment Process
Figure 6.3              Proposed Landscape at Lower Deck Level Plan for BCP
Figure 6.4              Proposed Landscape at Upper Deck Level Plan for BCP

 

Figure 7.1              Potential Locations of Piers

Figure 7.2              Locations of Possible Temporary Stockpiling Areas

Figure 9.1a           Ecological Assessment Area

Figure 9.1b           Sections of Works Area

Figure 9.2a           Habitat Map (Key Plan)

Figure 9.2b           Record Locations of Mammal Species Yellow-bellied Weasel and Crab-eating Mongoose around Assessment Area

Figure 9.3              Habitat Map (Sheet 1 of 12)

Figure 9.4              Habitat Map (Sheet 2 of 12)

Figure 9.5              Habitat Map (Sheet 3 of 12)

Figure 9.6              Habitat Map (Sheet 4 of 12)

Figure 9.7              Habitat Map (Sheet 5 of 12)

Figure 9.8              Habitat Map (Sheet 6 of 12)

Figure 9.9              Habitat Map (Sheet 7 of 12)

Figure 9.10           Habitat Map (Sheet 8 of 12)

Figure 9.11           Habitat Map (Sheet 9 of 12)

Figure 9.12           Habitat Map (Sheet 10 of 12)

Figure 9.13           Habitat Map (Sheet 11 of 12)

Figure 9.14           Habitat Map (Sheet 12 of 12)

Figure 9.15           Estimated Extent of Habitat to be Affected (Sheet 1 of 11)

Figure 9.16           Estimated Extent of Habitat to be Affected (Sheet 2 of 11)

Figure 9.17           Estimated Extent of Habitat to be Affected (Sheet 3 of 11)

Figure 9.18           Estimated Extent of Habitat to be Affected (Sheet 4 of 11)

Figure 9.19           Estimated Extent of Habitat to be Affected (Sheet 5 of 11)

Figure 9.20           Estimated Extent of Habitat to be Affected (Sheet 6 of 11)

Figure 9.21           Estimated Extent of Habitat to be Affected (Sheet 7 of 11)

Figure 9.22           Estimated Extent of Habitat to be Affected (Sheet 8 of 11)

Figure 9.23           Estimated Extent of Habitat to be Affected (Sheet 9 of 11)

Figure 9.24           Estimated Extent of Habitat to be Affected (Sheet 10 of 11)

Figure 9.25           Estimated Extent of Habitat to be Affected (Sheet 11 of 11)

Figure 9.26           Potential Woodland Compensation Area

Figure 9.27           Indicative Boundary of the Potential Wetland Compensation Area

Figure 9.28           Conceptual Plan and Typical Cross-section Views of the Proposed Wetland Compensation Area

Figure 11.1.0        Project Profile – Key Plan

Figure 11.1.1        Project Profile – Section A, Zone 1

Figure 11.1.2        Project Profile – Section A, Zones 1 & 2

Figure 11.1.3        Project Profile – Section A, Zones 2 & 3

Figure 11.1.4        Project Profile – Section A, Zones 2 & 3

Figure 11.1.5        Project Profile – Section B

Figure 11.1.6        Project Profile – Section C

Figure 11.2           Not Used

Figure 11.3.1        Proposed Landscape at Lower Deck Level Plan for BCP

Figure 11.3.2        Proposed Layout Plan at Upper Deck Level for BCP

Figure 11.3.3        BCP - Elevation

Figure 11.3.4        Ventilation Building Type A – G/F to 3/F Layout Plans

Figure 11.3.5        Ventilation Building Type A – 4/F Layout Plans & Section

Figure 11.3.6        Ventilation Building Type B – G/F to 3/F Layout Plans

Figure 11.3.7        Ventilation Building Type B – Section

Figure 11.3.8        Ventilation Building Type C – G/F to 3/F Layout Plans

Figure 11.3.9        Ventilation Building Type C – Section

Figure 11.3.10     Administration Building – Ground Floor Layout Plan

Figure 11.3.11     Administration Building – Section A-A, B-B

Figure 11.3.12     Viaduct – Typical Section

Figure 11.4.0        Existing Zonings within 500m Study Area – Key Plan

Figure 11.4.1        Existing Zonings within 500m Study Area Section A, Zones 1 & 2

Figure 11.4.2        Existing Zonings within 500m Study Area Section A, Zones 1 & 2

Figure 11.4.3        Existing Zonings within 500m Study Area Section A, Zones 2 & 3

Figure 11.4.4        Existing Zonings within 500m Study Area Section A, Zones 2 & 3

Figure 11.4.5        Existing Zonings within 500m Study Area Section B

Figure 11.4.6        Existing Zonings within 500m Study Area Section C

Figure 11.5.1        Landscape Resources – Key Plan

Figure 11.5.2        Landscape Resources – Section A, Zones 1 & 2

Figure 11.5.3        Landscape Resources – Section A, Zones 1 & 2

Figure 11.5.4        Landscape Resources – Section A, Zones 2 & 3

Figure 11.5.5        Landscape Resources – Section A, Zones 2 & 3

Figure 11.5.6        Landscape Resources – Section B

Figure 11.5.7        Landscape Resources – Section C

Figure 11.5.8        Landscape Character Areas – Key Plan

Figure 11.5.9        Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.5.10      Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.5.11      Landscape Character Areas – Section A, Zones 2 & 3

Figure 11.5.12      Landscape Character Areas – Section A, Zones 2 & 3

Figure 11.5.13      Landscape Character Areas – Section B

Figure 11.5.14      Landscape Character Areas – Section C

Figure 11.5.15      Photorecord of Various Landscape Resources – Section A, Zone 1

Figure 11.5.16      Photorecord of Various Landscape Resources – Section A, Zone 2

Figure 11.5.17      Photorecord of Various Landscape Resources – Section A, Zone 3

Figure 11.5.18      Photorecord of Various Landscape Resources – Section B

Figure 11.5.19      Photorecord of Various Landscape Resources – Section C

Figure 11.5.20      Visual Envelope

Figure 11.5.21      Location Plan of Visual Sensitive Receivers – Key Plan

Figure 11.5.22      Location Plan of Visual Sensitive Receivers (Sheet 1 of 4)

Figure 11.5.23      Location Plan of Visual Sensitive Receivers (Sheet 2 of 4)

Figure 11.5.24      Location Plan of Visual Sensitive Receivers (Sheet 3 of 4)

Figure 11.5.25      Location Plan of Visual Sensitive Receivers (Sheet 4 of 4)

Figure 11.5.26      Photorecords of Visually Sensitive Receivers (Sheet 1 of 2)

Figure 11.5.27      Photorecords of Visually Sensitive Receivers (Sheet 2 of 2)

Figure 11.6.0        Impact on Landscape Resources – Key Plan

Figure 11.6.1        Impact on Landscape Resources – Section A, Zone 1

Figure 11.6.2        Impact on Landscape Resources – Section A, Zones 1 & 2

Figure 11.6.3        Impact on Landscape Resources – Section A, Zone 2

Figure 11.6.4        Impact on Landscape Resources – Section A, Zone 3

Figure 11.6.5        Impact on Landscape Resources – Section B

Figure 11.6.6        Impact on Landscape Resources – Section C

Figure 11.6.7        Impact on Landscape Character Areas – Key Plan

Figure 11.6.8        Impact on Landscape Character Areas – Section A, Zone 1

Figure 11.6.9        Impact on Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.6.10      Impact on Landscape Character Areas – Section A, Zone 2

Figure 11.6.11      Impact on Landscape Character Areas – Section A, Zone 3

Figure 11.6.12      Impact on Landscape Character Areas – Section B

Figure 11.6.13      Impact on Landscape Character Areas – Section C

Figure 11.7.0        Landscape and Visual Mitigation Plan – Key Plan

Figure 11.7.1        Landscape and Visual Mitigation Plan – Section A, Zone 1

Figure 11.7.2        Landscape and Visual Mitigation Plan – Section A, Zones 1 & 2

Figure 11.7.3        Landscape and Visual Mitigation Plan – Section A, Zone 2

Figure 11.7.4        Landscape and Visual Mitigation Plan – Section A, Zone 3

Figure 11.7.5        Landscape and Visual Mitigation Plan – Section B

Figure 11.7.6        Landscape and Visual Mitigation Plan – Section C

Figure 11.7.7        VPs for Photomontages – Key Plan

Figure 11.7.8        VP1 Photomontage at Ha Heung Yuen

Figure 11.7.9        VP2 Photomontage at Tsung Yuen Ha

Figure 11.7.10      VP3 Photomontage at Kaw Liu Village

Figure 11.7.11      VP4 Photomontage at Nga Yiu Ha

Figure 11.7.12      VP5 Photomontage at Lung Mei Teng

Figure 11.7.13      VP6 Photomontage at Village West of Man Uk Pin

Figure 11.7.14      VP7 Photomontage at Tai Tong Wu

Figure 11.7.15      VP8 Photomontage at Loi Tung Village

Figure 11.7.16      VP9 Photomontage at Lung Shan Temple

Figure 11.7.17      VP10 Photomontage at Dawning Views

Figure 11.7.18      VP11 Photomontage at Yuen Leng

Figure 11.7.19     VP12 Photomontage at Wilson Trail

 

Figure 12.1           Key Plan For Cultural Heritage Resources Recorded by AMO within the Study Area

Figure 12.2           Key Plan For Built Heritage

Figure 12.2.1        1:1000 Map Showing Built Heritage Identified Within the Boundary Control Point Section (Sheet 1

                                of 2)

Figure 12.2.2        1:1000 Map Showing Built Heritage Identified Within the Boundary Control Point Section (Sheet 2 of 2)

Figure 12.2.3        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 1 of 4)

Figure 12.2.4        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier

Closed Area Boundary (Sheet 2 of 4)

Figure 12.2.5        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 3 of 4)

Figure 12.2.6        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 4 of 4)

Figure 12.2.7a      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 1 of 6)

Figure 12.2.7b      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 2 of 6)

Figure 12.2.8        1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 3 of 6)

Figure 12.2.9a      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 4 of 6)

Figure 12.2.9b      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 5 of 6)

Figure 12.2.9c      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 6 of 6)

Figure 12.2.10a   1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 1 of 3)

Figure 12.2.10b   1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 2 of 3)

Figure 12.2.10c    1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 3 of 3)

Figure 12.2.11a   1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 1 of 3)

Figure 12.2.11b   1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 2 of 3)

Figure 12.2.12      1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 3 of 3)

Figure 12.2.13      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 1 of 5)

Figure 12.2.14      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 2 of 5)

Figure 12.2.15      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 3 of 5)

Figure 12.2.16      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 4 of 5)

Figure 12.2.17      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 5 of 5)

Figure 12.2.18      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 1 of 6)

Figure 12.2.19      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 2 of 6)

Figure 12.2.20      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 3 of 6)

Figure 12.2.21      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 4 of 6)

Figure 12.2.22      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 5 of 6)

Figure 12.2.23      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 6 of 6)

Figure 12.3           Key Plan for Geology Map of CHIA Study Area

Figure 12.4.1        Known Site of Archaeological Interest – Ping Che Archaeological Site

Figure 12.4.2        Known Site of Archaeological Interest – Queen’s Hill Archaeological Site

Figure 12.5           Key Plan for Archaeological Survey

Figure 12.5.1        Location Plan of Test Pit and Auger Hole within BCP Section

Figure 12.5.2        Location Plan of Test Pit and Auger Hole within Section Between Lin Ma Hang and Frontier Closed Area Boundary

Figure 12.5.3        Location Plan of Test Pit and Auger Hole within Section Between Ping Yeung and Wo Keng Shan (Sheet 1 of 2)

Figure 12.5.4        Location Plan of Test Pit and Auger Hole within Section Between Ping Yeung and Wo Keng Shan (Sheet 2 of 2)

Figure 12.5.5        Location Plan of Auger Hole within Fanling Section

Figure 12.6           Key Plan for Archaeological Potential

Figure 12.6.1        Area of Archaeological Potential and Further Archaeological Survey within Section Between Lin Ma Hang and Frontier Closed Area Boundary

Figure 12.6.2        Area of Archaeological Potential and Further Archaeological Survey within Section Between Ping Yeung and Wo Keng Shan (Sheet 1 of 2)

Figure 12.6.3        Area of Archaeological Potential and Further Archaeological Survey within Section Between Ping Yeung and Wo Keng Shan (Sheet 2 of 2)

Figure 12.6.4        Area of Further Archaeological Survey within Sha Tau Kok Road Section

Figure 12.6.5        Area of Further Archaeological Survey within Lau Shui Heung Tunnel Section

Figure 12.6.6        Area of Further Archaeological Survey within Fanling Section

 

 

Appendices

Appendix 2.1               Tentative Construction Programme

Appendix 2.2               Summary Timeline of Concurrent Projects

Appendix 2.3           Summary of Design Alternatives considered during the Feasibility Study

Appendix 2.4           Difference between the Current Alignment and the Old Alignment from the EIA Study Brief

 

Appendix 3.1a         Details of Dust Emission Sources for 1-hour and Daily TSP Assessment (Tier 1)

Appendix 3.1b         Details of Dust Emission Sources for Annual TSP Assessment

Appendix 3.1c          Details of Dust Emission Sources for 1-hour and Daily TSP Assessment (Tier 2)

Appendix 3.1d         Estimation of Percentage Active Area for Different Stages of Construction Activities

Appendix 3.1e         Estimation of Total Percentage Active Area for Hourly, Daily and Annual TSP Assessment

Appendix 3.1f          Estimation of Dust Suppression Efficiency

Appendix 3.2           Exhaust Technology Fractions

Appendix 3.3           Vehicle Population in Years 2018, 2023, 2028 and 2033.

Appendix 3.4           Diurnal Traffic Pattern, VMT and Trips in 2018, 2023, 2028 and 2033

Appendix 3.4-1        Traffic Forecast for 2018, 2023, 2028 and 2033

Appendix 3.4-2        Road Type and Distance

Appendix 3.4-3        Trips and VMT for Petrol Vehicles in Hong Kong

Appendix 3.4-4        VMT and Trips for 2018, 2023, 2028 and 2033 in the Study Area

Appendix 3.5           Relative Humidity and Temperature

Appendix 3.6           Peak Hour Speed, Volume/Capacity Ratio and Speed Fractions in 2018, 2023, 2028 and 2033.

Appendix 3.7a         Comparison of Emissions with Peak and Non-peak Speeds in 2018, 2023, 2028 and 2033

Appendix 3.7b         Calculation of Worst Case Emission Rates for Different Road Types

Appendix 3.8           Calculations of the Composite Emission Factors

Appendix 3.9a         Calculations of the Emission Rates for Ventilation Shafts and Building

Appendix 3.9b         Selection of Worst Case Hourly Emission for Calculation of Emission Rates for Ventilation Shafts

                                       and Building

Appendix 3.10a        Calculations of Idling Emissions

Appendix 3.10b        Determination of Idling Emission Factors as Extracted from the Feasibility Study

Appendix 3.10c        Estimation of NOx Composite Idling Emission Factors

Appendix 4.1        Unmitigated Construction Plant Inventory

Appendix 4.2        Unmitigated Construction Airborne Noise Impacts

Appendix 4.3        Mitigated Construction Plant Inventory

Appendix 4.4        Mitigated Construction Airborne Noise Impact

Appendix 4.5        Unmitigated Construction Ground-borne Noise Impacts

Appendix 4.6        Traffic Data and Road Traffic Network

Appendix 4.7        Comparison Scenario Between With and Without Project

Appendix 4.8        Unmitigated Road Traffic Noise Leve

Appendix 4.9        Mitigated Road Traffic Noise Level

Appendix 4.10      Sample Calculation of Fixed Plant Noise

 

Appendix 6.1        Estimation of Sewage Flow at Existing Site

Appendix 6.2        Estimation of Pollutant Loadings from Existing Site

Appendix 6.3        Estimation of Pollutant Loadings from Proposed Development
Appendix 6.4      Estimation of Pollutant Loadings Discharge to Deep Bay from Proposed Development
Appendix 6.5      Estimation of Pollutant Loadings Discharge to Deep Bay After Reuse

 

Appendix 8.1        Updated Contamination Assessment Plan (CAP) submitted in July 2010

Appendix 8.2        Acceptance of CAP by EPD in October 2010

 

Appendix 9.1        Ecological Survey Locations and Study Boundary

Appendix 9.2        Plates

Appendix 9.3a      Plant Species recorded in Section 1 – BCP

Appendix 9.3b      Plant Species recorded in Sections 2 & 3 - Lin Ma Hang to Frontier Closed Area Boundary and Ping
                             Yeung to Wo Keng Shan

Appendix 9.3c      Plant Species recorded in Section 5 - Sha Tau Kok Road (between North and South Tunnel)

Appendix 9.3d      Plant Species recorded in Section 7 – Fanling

Appendix 9.4        Woodland Compensation Plan

Appendix 9.5a      Fauna recorded in BCP area

Appendix 9.5b      Fauna recorded in the Frontier Closed Area

Appendix 9.5c      Fauna recorded in Nga Yiu Ha, Ping Yeung and Wo Keng Shan Area

Appendix 9.5d      Fauna recorded in the North Tunnel Aboveground Area
Appendix 9.5e      Fauna recorded in Shan Tong, Man Uk Pin and Loi Tung Area
Appendix 9.5f       Fauna recorded in Tan Chuk Hang and Lau Shui Heung Area
Appendix 9.5g      Fauna recorded in Wo Hop Shek and Yuen Leng Area
Appendix 9.6       
(Not used)

Appendix 9.7        Consideration of Alternative Portal Locations for Woodland Avoidance

 

Appendix 11.1    CIE and Luminarie Inputs

Appendix 11.2    Modelled Luminarie and VSR Locations

 

Appendix 12.1    Bibliography

Appendix 12.2a   Detailed Records of Identified Built Heritage within CHIA Study Area of the BCP Section

Appendix 12.2b   Detailed Records of Identified Built Heritage within CHIA Study Area of the Section between Lin Ma Hang and Frontier Closed Area Boundary

Appendix 12.2c    Detailed Records of Identified Built Heritage within CHIA Study Area of the Section between Ping Yeung and Wo Keng Shan

Appendix 12.2d   Detailed Records of Identified Built Heritage within CHIA Study Area of the Cheung Shan Tunnel Section (North Tunnel)

Appendix 12.2e   Detailed Records of Identified Built Heritage within CHIA Study Area of the Sha Tau Kok Road Section (Between North and South Tunnel)

Appendix 12.2f    Detailed Records of Identified Built Heritage within CHIA Study Area of the Lau Shui Heung Tunnel Section (South Tunnel)

Appendix 12.2g   Detailed Records of Identified Built Heritage within CHIA Study Area of the Fanling Section

Appendix 12.3a   Auger Hole Records

Appendix 12.3b   Test Pit Records

Appendix 12.3c    Land Survey Records