Agreement No. CE 29/2008(EP)
Engineering Investigation and Environmental
Studies for Integrated Waste Management
Facilities
Phase 1 – Feasibility Study
Integrated Waste Management Facilities
Environmental Impact Assessment Report
CONTENTS
VOLUME 1: MAIN TEXT
Table of Content
1.1.......... Background
1.2.......... Assessment Scenarios
1.3.......... Objectives of this EIA Study
1.4.......... Structure of the Report
2............ PROJECT
DESCRIPTION
2.1.......... Need for the Project
2.2.......... Site Selection
2.3.......... Technology Selection
2.4.......... Scope of the Project
2.5.......... Consideration of Alternatives
2.6.......... Interfaces with Other Projects
2.7.......... Assessment Areas of the EIA
Study
3a.......... AIR
QUALITY IMPACT (TTAL Site)
3b.......... AIR
QUALITY IMPACT (Artificial Island near SKC)
3b.1........ Introduction
3b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
3b.2.1..... Introduction
3b.2.2..... Air Quality Objectives and EIAO-TM
3b.2.3..... Air Pollution Control (Construction
Dust) Regulation
3b.3........ Description of the Environment
3b.4........ Air Sensitive Receivers
3b.4.1..... General
3b.4.2..... ASRs for Gaseous Pollutants Impact
Assessment
3b.4.3..... ASRs for Odour Impact Assessment
3b.5........ Identification of Pollution
Sources
3b.5.1..... Construction Phase
3b.5.2..... Operation Phase - Gaseous
Pollutants
3b.5.3..... Operation Phase - Odour Impacts
3b.6........ Assessment Methodology
3b.6.1..... Construction Phase
3b.6.2..... Operation Phase - Gaseous
Pollutants
3b.6.3..... Operation Phase - Odour Impacts
3b.7........ Prediction and Evaluation of
Environmental Impacts
3b.7.1..... Construction Phase
3b.7.2..... Operation Phase - Gaseous
Pollutants
3b.7.3..... Operation Phase - Odour Impacts
3b.8........ Mitigation Measures
3b.8.1..... Construction Phase
3b.8.2..... Operation Phase
3b.9........ Residual Environmental Impact
3b.9.1..... Construction Phase
3b.9.2..... Operation Phase
3b.10...... Environmental Monitoring and Audit
Requirements
3b.10.1... Construction Phase
3b.10.2... Operation Phase
3b.11...... Conclusion
3b.11.1... Construction Phase
3b.11.2... Operation Phase
3c........... AIR
QUALITY IMPACT (Co-Exist Scenario)
..............
4a.......... NOISE IMPACT (TTAL Site)
4b.......... NOISE IMPACT (Artificial Island near SKC)
4b.1........ Introduction
4b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
4b.2.1..... General
4b.2.2..... Construction Noise - General
Construction
4b.2.3..... Operation Phase
4b.3........ Description of the Environment
4b.4........ Noise Sensitive Receivers
4b.5........ Assessment Methodology
4b.5.1..... Construction Noise during
Unrestricted Hours
4b.5.2..... Operation Phase
4b.6........ Identification of Environmental
Impacts
4b.6.1..... Construction Phase
4b.6.2..... Operation Phase
4b.7........ Prediction and Evaluation of
Environmental Impacts
4b.7.1..... Construction Phase
4b.7.2..... Operation Phase
4b.8........ Mitigation of Environmental
Impacts
4b.8.1..... Construction Phase
4b.8.2..... Operation Phase
4b.9........ Evaluation of Residual Impacts
4b.10...... Environmental Monitoring and Audit
4b.10.1... Construction Phase
4b.10.2... Operation Phase
4b.11...... Conclusion
4b.11.1... Construction Phase
4b.11.2... Operation Phase
5a.......... WATER QUALITY IMPACT (TTAL Site)
5b.......... WATER QUALITY IMPACT (Artificial Island near SKC)
5b.1........ Introduction
5b.2........ Environmental Legislation,
Standards and Guidelines
5b.2.1..... Environmental Impact Assessment
Ordinance (EIAO)
5b.2.2..... Water Pollution Control Ordinance
(WPCO)
5b.2.3..... Sediment Quality Assessment
Criteria
5b.3........ Description of the Environment
5b.3.1..... Existing Baseline Marine Water
Quality
5b.3.2..... Existing Baseline Marine Sediment
Quality
5b.4........ Water Sensitive Receivers
5b.5........ Assessment Methodology
5b.6........ Identification of Potential
Impacts
5b.6.1..... Construction Phase
5b.6.2..... Operation Phase
5b.7........ Prediction and Evaluation of
Environmental Impacts
5b.7.1..... Land-based Construction Phase
Impact
5b.7.2..... Construction Phase Impact from
Cofferdam Construction
5b.7.3..... Construction Phase Impact from Loss
of Filling Material from the Reclamation Area and Localized Dredging for Anti-Scouring
Protection Layer
5b.7.4..... Construction Phase Impact from
Installation of Submarine Cables
5b.7.5..... Consideration of Cumulative
Construction Phase Impacts
5b.7.6..... Operation Phase Impact from Project
Effluent
5b.7.7..... Operation Phase Impact due to Maintenance
Dredging
5b.7.8..... Operation Phase Impact on Flow
Regime
5b.7.9..... Operation Phase Impact on the
Channel between the
5b.7.10... Operation Phase Impact on Dissolved
Oxygen within the Breakwaters Sheltered Water
5b.7.11... Operation Phase Impact on Sediment
Deposition and Water Quality
5b.8........ Mitigation Measures
5b.8.1..... Construction Phase
5b.8.2..... Operation Phase
5b.9........ Evaluation of Residual Impacts
5b.10...... Environmental Monitoring and Audit
5b.11...... Conclusion
6a.......... WASTE MANAGEMENT IMPLICATIONS (TTAL Site)
6b.......... WASTE MANAGEMENT IMPLICATIONS (Artificial Island
near SKC)
6b.1........ Introduction
6b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
6b.2.1..... General
6b.2.2..... Waste Disposal Ordinance (Cap. 354)
6b.2.3..... Public Health and Municipal
Services Ordinance (Cap. 132)
6b.2.4..... Land (Miscellaneous Provisions)
Ordinance (Cap 28)
6b.2.5..... Dumping at Sea Ordinance (Cap 466)
6b.2.6..... Environmental Guidelines
6b.3........ Assessment Approach and
Methodology
6b.4........ Identification and Evaluation of
Environmental Impacts
6b.5........ Mitigation of Adverse
Environmental Impacts
6b.5.1..... Construction Phase
6b.5.2..... Operation Phase
6b.6........ Contamination Prevention
Measures
6b.6.1..... General
6b.6.2..... Potential Sources of Contamination
6b.6.3..... Approach to Prevent Land
Contamination
6b.7........ Evaluation of Residual Impacts
6b.8........ Environmental Monitoring and
Audit
6b.9........ Conclusion
7a.......... ECOLOGICAL IMPACT (BOTH TERRESTRIAL AND AQUATIC)
(TTAL Site)
7b.......... ECOLOGICAL IMPACT (BOTH TERRESTRIAL AND AQUATIC)
(Artificial Island near SKC)
7b.1........ Introduction
7b.2........ Environmental Legislation,
Policies, Plans, Standards And Criteria
7b.3........ Assessment Methodology
7b.3.1..... Study Area
7b.3.2..... Literature Review
7b.3.3..... Ecological Surveys
7b.4........ Description of the Environment
7b.4.1..... Area of Conservation Interest
7b.4.2..... Habitat and Vegetation
7b.4.3..... Avifauna
7b.4.4..... Terrestrial Mammals
7b.4.5..... Herpetofauna
7b.4.6..... Dragonflies and Butterflies
7b.4.7..... Freshwater Communities
7b.4.8..... Intertidal Fauna
7b.4.9..... Subtidal Fauna
7b.4.10... Marine Mammals
7b.5........ Ecological Value
7b.6........ Identification and Evaluation of
Environmental Impacts
7b.6.1..... Introduction
7b.6.2..... Construction Phase
7b.6.3..... Operation Phase
7b.6.4..... Overall Impact
7b.7........ Cumulative Impacts
7b.8........ Mitigation of Adverse
Environmental Impacts
7b.8.1..... Introduction
7b.8.2..... Avoidance
7b.8.3..... Minimisation
7b.8.4..... Compensation
7b.8.5..... Additional Enhancement or
Precautionary Measures
7b.8.6..... Summaries of Ecological Impacts and
Mitigation / Enhancement Measures
7b.9........ Evaluation of Residual Impacts
7b.9.1..... Shek Kwu Chau
7b.9.2..... Cheung Sha
7b.9.3..... Along the Cable Alignment
7b.10...... Environmental Monitoring and Audit
7b.10.1... General
7b.10.2... Finless Porpoise Monitoring
7b.10.3... Coral Monitoring
7b.10.4... White-bellied Sea Eagle Monitoring
7b.10.5... Water Quality Monitoring and Audit
7b.11...... Conclusion
7b.12...... Reference
8a.......... FISHERIES IMPACT (TTAL Site)
8b.......... FISHERIES IMPACT (Artificial Island near SKC)
8b.1........ Introduction
8b.2........ Environmental Legislation,
Policies, Plans, Standards and Guidelines
8b.3........ Study Area
8b.4........ Assessment Methodology
8b.5........ Description of the Environment
8b.5.1..... Sites Of Fisheries Importance
8b.5.2..... Capture Fisheries
8b.5.3..... Culture Fisheries
8b.6........ Identification, Prediction and
Evaluation Of Environmental Impacts
8b.6.1..... Construction Phase
8b.6.2..... Operation Phase
8b.6.3..... Overall Impacts
8b.7........ Evaluation of Cumulative
Environmental Impacts
8b.8........ Mitigation of Environmental
Impacts
8b.9........ Evaluation of Residual
Environmental Impacts
8b.10...... Environmental Monitoring and Audit
8b.11...... Conclusion
8b.12...... References
9a.......... HEALTH IMPACT (TTAL Site)
9b.......... HEALTH IMPACT (Artificial
Island near SKC)
9b.1........ Introduction
9b.2........ Potential Health Impacts of
Aerial Emissions from the IWMF during operational phase
9b.2.1..... Project Site
9b.2.2..... Hazard Identification
9b.2.3..... Air Dispersion and Deposition
Modelling
9b.2.4..... Exposure Assessment
9b.2.5..... Toxicity Assessment
9b.2.6..... Risk Characterization
9b.3........ Potential Health Impacts of
Biogas from Sorting and Recycling Plant
9b.3.1..... Introduction
9b.3.2..... Description of Potential Biogas
Emissions
9b.3.3..... Impact Evaluation
9b.4........ Potential Health Impacts of
Fugitive Emissions during Transportation, Storage and Handling of Waste and Ash
9b.4.1..... Introduction
9b.4.2..... Description of Operation Process
9b.4.3..... Hazard Identification
9b.4.4..... Impact Evaluation
9b.5........ Health Impacts Associated with
other Potential Accidental Events
9b.6........ Conclusion
9b.7........ Reference
9c........... HEALTH IMPACT (Co-Exist
Scenario)
10a......... LANDSCAPE AND VISUAL IMPACT (TTAL Site)
10b......... Landscape and Visual Impact (Artificial Island near
SKC)
10b.1...... Introduction
10b.2...... Description of Proposed Works
10b.3...... Environmental Legislation and
Standards
10b.4...... Review of Planning and Development
Control Framework
10b.4.1... Objectives
10b.4.2... Existence of Statutory Plans
10b.5...... Baseline Study Methodology
10b.5.1... Introduction
10b.5.2... Landscape Baseline Study Methodology
10b.5.3... Visual Baseline Study Methodology
10b.5.4... Impact Significance Threshold
Assessment Methodology
10b.5.5... Residual Impacts Assessment
Methodology
10b.5.6... Photomontage Illustration for
Selected Views
10b.5.7... Overall Result of Assessment
10b.6...... Baseline study
10b.6.1... Identification of Landscape Resources
(LRs)
10b.6.2... Identification of Landscape Character
Areas (LCAs)
10b.6.3... Identification of Visual Sensitive
Receivers
10b.7...... Sources of Landscape and Visual
Impact
10b.7.1... Sources of Landscape Impact
10b.7.2... Sources of Visual Impacts
10b.8...... Landscape Impact Assessment (Before
Mitigation)
10b.8.1... Sensitivity of Landscape Resources
and Landscape Character Areas
10b.8.2... Magnitude of Change of Landscape
Resources and Landscape Character Areas
10b.8.3... Significance Threshold of Landscape
Resources and Landscape Character Areas
10b.9...... Visual Impact Assessment
10b.9.1... Sensitivity of Visual Sensitive
Receivers
10b.9.2... Magnitude of Change of Visual
Sensitive Receivers
10b.9.3... Significance Threshold of Visual
Sensitive Receivers
10b.10.... Mitigation Measures
10b.10.1.. Mitigation Measures Approaches
10b.10.2.. General Mitigation Measures /
Strategies
10b.10.3.. Residual Impact of Landscape Resources
and Landscape Character Areas
10b.10.4.. Residual Impact of Visual Sensitive
Receivers
10b.10.5.. Photomontages of Residual Impact of
Visual Sensitive Receivers
10b.11.... Cumulative Impacts
10b.12.... Conclusion
10b.12.1.. Landscape Impact
10b.12.2.. Visual Impact
10b.12.3.. Overall Residual Impact
11a......... IMPACT ON CULTURAL HERITAGE
(TTAL Site)
11b......... IMPACT ON CULTURAL HERITAGE
(Artificial Island near SKC)
11b.1...... Introduction
11b.2...... Environmental Legislation and
Standards
11b.2.1... Overview
11b.2.2... Environmental Impact Assessment
Ordinance (Cap.499) (EIAO)
11b.2.3... Technical Memorandum on Environmental
Impact Assessment Process (EIAO-TM)
11b.2.4... Antiquities and Monuments Ordinance
(Cap.53) (A&MO)
11b.2.5...
11b.2.6... Guidelines for Cultural Heritage
Impact Assessment
11b.2.7... Guidelines for Marine Archaeological
Impact Assessment
11b.3...... Assessment Methodology
11b.3.1... Study Scope
11b.3.2... Terrestrial Archaeology
11b.3.3... Marine Archaeology
11b.3.4... Built Heritage
11b.4...... Result of Terrestrial
Archaeological Review
11b.5...... Result of Marine Archaeological
Investigation Review
11b.5.1... Baseline Review
11b.5.2... Geophysical Survey
11b.5.3... Diver Inspection
11b.6...... Result of Built Heritage Resources
Review and Cultural Landscape
11b.7...... Identification of Potential
Impacts
11b.7.1... Construction Phase
11b.7.2... Operation Phase
11b.8...... Evaluation of Potential Impacts
11b.8.1... Construction Phase
11b.8.2... Operation Phase
11b.9...... Recommended Mitigation Measures
11b.9.1... Construction Phase
11b.9.2... Operation Phase
11b.10.... Environmental Monitoring and Audit
11b.11.... Conclusion
11b.12.... References
12a......... LANDFILL GAS HAZARDS ASSESSMENT (TTAL Site)
13........... ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
13.1........ Introduction
13.2........ Tsang Tsui Ash Lagoon Site
13.3........ An Artificial
14........... IMPLEMENTATION SCHEDULE OF
THE PROPOSED MITIGATION MEASURES
14.1........ The IWMF at the TTAL Site
14.2........ The IWMF at the
15........... SUMMARY
OF ENVIRONMENTAL OUTCOMES
15.1........ Impact Summary for Tsang Tsui
Ash Lagoon Site
15.2........ Impact Summary for the IWMF at
an
15.3........ Impact Summary for IWMF at both
Tsang Tsui Ash Lagoon Site and the
15.4........ Key Environmental Outcomes and
Summary of Environmental Performance Comparison
List of Tables
Table 2.1 Criteria for Selection of Thermal
Treatment Technology
Table 2.2 Summary of Option Evaluation for
Thermal Treatment Technologies
Table 2.3 Air Emission Limits for the IWMF
Table 2.4 Dimensions of Major Building
Structures of IWMF
Table 2.5 Construction Programme of the IWMF at
the TTAL Site
Table 2.6 Construction Programme of the IWMF at
the
Table 2.7 Areas Covered by the EIA Study
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 3b.1 Hong Kong Air Quality Objectives
Table 3b.2 Annual Average Concentrations of
Pollutants from Year 2005 to Year 2009 at EPD's Air Quality Monitoring Station
(Tung Chung)
Table 3b.3 Identified Air Sensitive Receiver for
the
Table 3b.4 Target emission levels
Table 3b.5 Operation parameters of the
Incineration Plant
Table 3b.6 Allocated Emission Allowances for Year
2015
Table 3b.7 Different road types for the hot spot
areas
Table 3b.8 Fuel Efficiency
Table 3b.9 Emission rate for SO2 for
different types of vehicles
Table 3b.10 Total vehicle emission for different
assessment years for the entire territory
Table 3b.11 Total vehicle emission for different
assessment years for each hot spot area
Table 3b.12 Conversion Factors to 5 second Average
Concentration
Table 3b.13 Identified Air Sensitive Receivers for
the
Table 3b.14 Predicted Odour Levels at the ASR
Table
Table
Table
Table 4b.1 Construction Noise Criteria for
Activity other than Percussive Piling
Table 4b.2 Operation Noise Criteria for Fixed
Noise Sources
Table 4b.3 Summary of Measured Prevailing
Background Noise Level
Table 4b.4 Representative Noise Sensitive
Receivers for Noise Impact Assessment
Table 4b.5 Operation Mode of the Berths
Table 4b.6 Noise Inventories
Table 4b.7 Summary of Cumulative Unmitigated
Construction Noise Levels at Representative NSRs during
Table 4b.8 Summary of Predicted Operation Noise
Levels
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 5b.1 Summary of Water Quality Objectives for
Table 5b.2 Sediment Quality Criteria for the
Classification of Sediment
Table 5b.3 Baseline Marine Water Quality Condition
for
Table 5b.4 Baseline Marine Sediment Quality
Condition
Table 5b.5 Estimated Amount of Sewage Generated
from the IWMF Staff & Visitors and the Associated Activities
Table 5b.6 Estimated Quantity and Possible
Characteristics of Wastewater Generated from Treatment Process and Sewage from
Floor & Vehicle Washing and the IWMF Staff & Visitors
Table 5b.7 Ambient and Tolerance Values for
Suspended Solids Concentrations in the Vicinity of Sensitive Receivers
Table 5b.8 Calculated Suspended Sediment Elevation
under Unmitigated Filling Scenario
Table 5b.9 Calculated Suspended Sediment Elevation
under Mitigated Filling Scenario
Table 5b.10 Calculated Suspended Sediment Elevation
under Unmitigated Dredging Scenario (Silt Curtain Implemented)
Table 5b.11 Calculated Suspended Sediment Elevation
under Mitigated Dredging Scenario (Silt Curtain Implemented and Dredging Rate
Reduces)
Table 5b.12 Recommended Maximum Dredging Rate and
Permitted Number of Grab Per Hour
Table 5b.13 Calculation of the Effects of Increased
Suspended Solids Concentration on Dissolved Oxygen Concentration under
Unmitigated Scenario
Table 5b.14 Comparison of Saline Water Discharge from
Desalination Plant with Effluent Discharge Standard
Table 5b.15 Density Profile at SKC IWMF Desalination
Plant Outfall
Table 5b.16 Current Velocity Profile at SKC IWMF
Desalination Plant Outfall
Table 5b.17 Summary of Proposed Model Runs
Table 5b.18 Example for Background Build Up
Correction
Table 5b.19 Summary of Initial Dilutions Predicted at
the Edge of ZID
Table
Table
Table
Table
Table
Table 6b.1 Chemical Screening Results
Table 6b.2 Disposal Quantity of Marine Sediment
Table 6b.3 Summary of C&D Materials Volumes
Table 6b.4 Sampling Locations and Relevant Results
Table 6b.5 Methane Hazard Assessment Criteria
Table 6b.6 Calculation of Methane Flux from the
Shek Kwu Chau Reclamation
Table 6b.7 Incineration Residue Pollution Control
Limits
Table 6b.8 Summary of Waste Generation from
Operation of the IWMF
Table 6b.9 Summary of Waste Handling Procedures
and Disposal Outlets during Construction Phase
Table 6b.10 Materials used in the IWMF Operation with
Land Contamination Potential
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 7b.1 Ecological Survey Programme for Shek
Kwu Chau
Table 7b.2 Ecological Survey Programme for Cheung
Sha
Table 7b.3 Habitats Recorded within the Study Area
at Shek Kwu Chau
Table 7b.4 Habitats Recorded within the Study Area
at Cheung Sha
Table 7b.5 Marine Water Quality Condition for
Table 7b.6 Avifauna Species of Conservation
Interest Previously Recorded at Shek Kwu Chau
Table 7b.7 Avifauna Species of Conservation
Interest Recorded within the Study Area at Shek Kwu Chau
Table 7b.8 Avifauna Species of Conservation
Interest Recorded within the Study Area at Cheung Sha
Table 7b.9 Herpetofauna Species of Conservation
Interest Previously Recorded at Shek Kwu Chau
Table 7b.10 Herpetofauna Species of Conservation
Interest Recorded within the Study Area at Shek Kwu Chau
Table 7b.11 Herpetofauna Species of Conservation
Interest Previously Recorded at Cheung Sha
Table 7b.12 Herpetofauna Species of Conservation
Interest Recorded within the Study Area at Cheung Sha
Table 7b.13 Dragonfly Species of Conservation
Interest Previously Recorded at Shek Kwu Chau
Table 7b.14 Dragonflies and Butterflies Species of
Conservation Interest Recorded within the Study Area at Shek Kwu Chau
Table 7b.15 Freshwater Species of Conservation
Interest Previously Recorded at Cheung Sha
Table 7b.16 Summary of Intertidal Line-transect
Survey Results at Shek Kwu Chau
Table 7b.17 Summary
of Intertidal Survey Results at Cheung Sha
Table 7b.18 Coral Species Found within the Study Area
at Shek Kwu Chau
Table 7b.19 Summary
of Benthos Survey Results in Dry and Wet Seasons at Shek Kwu Chau
Table 7b.20 Comparison of Diversity Index (H') and
Evenness Index (J) of Benthic Communities at Shek Kwu Chau with Other Waters in
Table 7b.21 Summary
of Benthos Survey Results in Dry and Wet Seasons along the Proposed Submarine
Cable
Table 7b.22 Comparison of Diversity Index (H') and
Evenness Index (J) of Benthic Communities along the Proposed Submarine Cable
with Other Waters in
Table 7b.23 Ecological Value of Shrubland Habitat at
Shek Kwu Chau
Table 7b.24 Ecological Value of
Table 7b.25 Ecological Value of Developed Habitat at
Shek Kwu Chau
Table 7b.26 Ecological Value of Pond Habitat at Shek
Kwu Chau
Table 7b.27 Ecological Value of Watercourse Habitat
at Shek Kwu Chau
Table 7b.28 Ecological Value of Rocky Shore Habitat
at Shek Kwu Chau
Table 7b.29 Ecological Value of Subtidal Hard Bottom
Habitat at Shek Kwu Chau
Table 7b.30 Ecological Value of Subtidal Soft Bottom
Habitat at Shek Kwu Chau
Table 7b.31 Ecological Value of Coastal / Marine
Waters at Shek Kwu Chau
Table 7b.32 Ecological Value of Shrubland Habitat at
Cheung Sha
Table 7b.33 Ecological Value of Developed Habitat at
Cheung Sha
Table 7b.34 Ecological Value of Watercourse Habitat
at Cheung Sha
Table 7b.35 Ecological Value of Rocky Shore Habitat
at Cheung Sha
Table 7b.36 Ecological Value of Subtidal Hard Bottom
Habitat at Cheung Sha
Table 7b.37 Ecological Value of Subtidal Soft Bottom
Habitat at Cheung Sha
Table 7b.38 Ecological Value of Coastal / Marine
Waters at Cheung Sha
Table 7b.39 Ecological Value of Subtidal Soft Bottom
Habitat along the Submarine Cable Alignment
Table 7b.40 Ecological Value of Coastal / Marine
Waters along the Submarine Cable Alignment
Table 7b.41 Species of Conservation Interest Recorded
in the Study Area of Shek Kwu Chau during the Current and Previous Studies
Table 7b.42 Species of Conservation Interest Recorded
in the Study Area of at Cheung Sha and Along the Submarine Cable Alignment
during the Current and Previous Studies
Table 7b.43 Area of Habitat to be Directly Affected
under the Project
Table 7b.44 Brief summary of REA Survey Results
within the Reclamation Area at Shek Kwu Chau
Table 7b.45 Potentially Affected Coral Species
Recorded within the Reclamation Area at Shek Kwu Chau
Table 7b.46 Calculated Suspended Solids (SS)
Concentrations at Shek Kwu Chau under Unmitigated Dredging Scenario (Dredging
Rate
Table 7b.47 Overall Impact Evaluation at Shek Kwu
Chau: Shrubland
Table 7b.48 Overall Impact Evaluation at Shek Kwu
Chau:
Table 7b.49 Overall Impact Evaluation at Shek Kwu
Chau: Developed Area
Table 7b.50 Overall Impact Evaluation at Shek Kwu
Chau: Pond
Table 7b.51 Overall Impact Evaluation at Shek Kwu
Chau: Watercourse
Table 7b.52 Overall Impact Evaluation at Shek Kwu
Chau: Rocky Shore
Table 7b.53 Overall Impact Evaluation at Shek Kwu
Chau: Subtidal Hard and Soft Bottom Habitat
Table 7b.54 Overall Impact Evaluation at Shek Kwu
Chau: Coastal / Marine Waters
Table 7b.55 Overall Impact Evaluation at Cheung Sha:
Shrubland
Table 7b.56 Overall Impact Evaluation at Cheung Sha:
Developed Area
Table 7b.57 Overall Impact Evaluation at Cheung Sha:
Watercourse
Table 7b.58 Overall Impact Evaluation at Cheung Sha:
Rocky Shore
Table 7b.59 Overall Impact Evaluation at Cheung Sha:
Subtidal Hard and Soft Bottom Habitat
Table 7b.60 Overall Impact Evaluation at Cheung Sha:
Coastal / Marine Waters
Table 7b.61 Overall Impact Evaluation along the
Submarine Cable Alignment: Subtidal Soft Bottom Habitat
Table 7b.62 Overall Impact Evaluation along the Cable
Alignment: Coastal / Marine Waters
Table 7b.63 Overall Impacts on Species of
Conservation Interest at Shek Kwu Chau
Table 7b.64 Overall Impacts on Species of
Conservation Interest at Cheung Sha and Along the Submarine Cable Alignment
Table 7b.65 Overall Construction Stage Impact and
Mitigation / Enhancement for Shek Kwu Chau
Table 7b.66 Overall Operation Stage Impact and
Mitigation / Enhancement for Shek Kwu Chau
Table 7b.67 Overall Construction Stage Impact and
Mitigation / Enhancement for Cheung Sha
Table 7b.68 Overall Operation Stage Impact and
Mitigation / Enhancement for Cheung Sha
Table 7b.69 Overall Construction Stage Impact and
Mitigation / Enhancement for Submarine Cable Alignment
Table 7b.70 Overall Operation Stage Impact and
Mitigation / Enhancement for Submarine Cable Alignment
Table
Table
Table
Table 8b.1 Fisheries Sensitive Receivers within
the Study Area
Table 8b.2 Recent Figures for Capture Fisheries in
Table 8b.3 Summary of Capture Fisheries Data in
the Study Area
Table 8b.4 Fisheries Production (kg/ha) of Top Ten
Families in the Study Area
Table 8b.5 Recent Figures on
Table 8b.6 Sizes of Works Areas for the IWMF an
Table 8b.7 Fisheries Impact Evaluation during
Construction and Operation Phases
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 9b.1 Identified Air Sensitive Receivers for
Table 9b.2 Particle Size Distributions
Table 9b.3 First Schedule - Maximum permitted
concentration of certain metals naturally present in specified foods
Table 9b.4 Second Schedule - Maximum permitted
concentration of certain metals present in specified foods
Table 9b.5 Food Consumption Rates
Table 9b.6 Mechanisms for Environmental Media
Contamination
Table 9b.7 Summary of General Water Body and
Watershed Parameters
Table 9b.8 Toxicity Factors for the Risk
Assessment
Table 9b.9 Exposure Limits/Reference Levels for
COPCs Acute Exposure
Table 9b.10 Potential Accidental Events and Preventive
Measures
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 10b.1 Matrix for Impact Significance Threshold
- Combination and Relationship between Sensitivity and Magnitude of Change
Table 10b.2 Landscape Resources within Study Area
Table 10b.3 Landscape Character Areas within Study
Area
Table 10b.4 Visual Sensitive Receivers within Visual
Envelope
Table 10b.5 Sources of Landscape Impact during
Construction Phase
Table 10b.6 Sources of Landscape Impact during
Operation Phase
Table 10b.7 Sources of Visual Impact during
Construction Phase
Table 10b.8 Sources of Visual Impact during Operation
Phase
Table 10b.9 Sensitivity of Identified Landscape
Resources and Landscape Character Areas
Table 10b.10 Magnitude of Change of Identified
Landscape Resources and Landscape Character Areas
Table 10b.11 Significance Threshold of Identified
Landscape Resources and Landscape Character Areas before Mitigation
Table 10b.12 Sensitivity of Identified Visual Sensitive
Receivers
Table 10b.13 Magnitude of Change of Identified Visual
Sensitive Receivers
Table 10b.14 Significance Threshold of Identified
Visual Sensitive Receivers before Mitigation
Table 10b.15 Recommended Landscape and Visual
Mitigation Measures
Table 10b.16 Residual Impact of Identified Landscape
Resources and Landscape Character Areas after Mitigation
Table 10b.17 Residual Impact of Identified Visual Sensitive
Receivers after Mitigation
Table 10b.18 Visibility of Visual Sensitive Receivers
to Proposed Works
Table
Table 11b.1 Sonar Contact List
Table 11b.2 Seismic Contact List
Table 11b.3 Potential Impact on Cultural Heritage
Site
Table
Table
Table
Table
Table
Table
Table 14.1 Implementation Schedule for Air Quality
Measures for the IWMF at the TTAL site
Table 14.2 Implementation Schedule for Water
Quality Measures for the IWMF at the TTAL site
Table 14.3 Implementation Schedule for Waste
Quality Measures for the IWMF at the TTAL site
Table 14.4 Implementation Schedule for Ecological
Quality Measures for the IWMF at the TTAL site
Table 14.5 Implementation Schedule for Health
Impact Measures for the IWMF at the TTAL site
Table 14.6 Implementation Schedule for Landscape
and Visual Measures for TTAL Site
Table 14.7 Implementation Schedule for Landfill
Gas Measures for the IWMF at the TTAL site
Table 14.8 Implementation Schedule for Air Quality
Measures for the IWMF at the artificial island near SKC
Table 14.9 Implementation Schedule for Noise
Impact Measures for the IWMF at the artificial island near SKC
Table 14.10 Implementation Schedule for Water Quality
Measures for the
Table 14.11 Implementation Schedule for Waste Quality
Measures for the IWMF at the artificial island near SKC
Table 14.12 Implementation Schedule for Ecological
Quality Measures for the IWMF at the artificial island near SKC
Table 14.13 Implementation Schedule for Fisheries
Measures for the IWMF at the artificial island near SKC
Table 14.14 Implementation Schedule for Landscape and
Visual Measures for the IWMF at the artificial island near SKC
Table 15.1 Summary of Key Environmental Outcomes /
Benefits and Environmental Performance Comparison
VOLUME 2: APPENDICES 3.1 –
3.12
List of Appendices
Appendix 3.1 Comparison of Target Emission
Levels with other Relevant Standards
Appendix 3.2 Detailed Calculations of
Emissions from the IWMF
Appendix 3.3 Detailed Calculations of Marine
Emission for the IWMF at the Artificial Island near Shek Kwu Chau
Appendix 3.4 Summary of Emission Inventory
for ISC Modelling
Appendix 3.5 Summary of Emission Inventory
for PATH Modelling
Appendix 3.6 Marine Emission for PATH model
Appendix 3.7 Key Assumptions for EMFAC-HK
Model
Appendix 3.8 Summary of Vehicle Emissions
for the Territory of Hong Kong
Appendix 3.9 Detailed Calculations of Odour
Emission
Appendix 3.10 Wind Tunnel Testing Report
Appendix 3.11 Plots of the Predicted
Concentration from PATH model
Appendix 3.12 Detailed Assessment Results
for Identified Potential Hot Spot Areas
VOLUME 3: APPENDICES 4.1 –
List of Appendices
Appendix 4.1 Photographs of Representative
Noise Sensitive Receivers at Shek Kwu Chau Site
Appendix 4.2 Response Letter from Transport
Department
Appendix 4.3 Locations of Notional Source
and Distance for NSRs
Appendix 4.4 Powered Mechanical Equipment
(PME) for the Different Construction Tasks
Appendix 4.5 Details of Construction Noise
Calculations (Unmitigated)
Appendix 4.6 Predicted Operation Noise
Levels
Appendix 5.1 Baseline Sedimentation Rates
within the Study Area
Appendix 5.2 Not Used
Appendix 5.3 Typical Sediment Removal
Facility (Extracted from ProPECC PN 1/94 "Construction Site
Drainage")
Appendix 5.4 Not Used
Appendix 5.5 Application of Silt Curtains
for Construction and Operation of the Shek Kwu Chau Faciliities
Appendix
6.1 Sediment / PFA Sampling and
Testing Plan
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix 7b.1 Representative Photographs of
Habitats at Shek Kwu Chau
Appendix 7b.2 Rapid Ecological Assessment
Methodology
Appendix 7b.3 Representative Photographs of
Coral Communities at Shek Kwu Chau
Appendix 7b.4 Photographs of Fauna Species
of Conservation Interest at Shek Kwu Chau
Appendix 7b.5 Flora Species Recorded within
the Study Area at Shek Kwu Chau
Appendix 7b.6 Fauna Species recorded within
the Study Area at Shek Kwu Chau
Appendix 7b.7 Fauna Species recorded during
the Cover Board Survey at Shek Kwu Chau
Appendix 7b.8 Detailed Benthos Survey
Results for Shek Kwu Chau
Appendix 7b.9 Line-Transect Survey Effort
for Finless Porpoise
Appendix 7b.10 Detailed Marine Mammal Survey
Results
Appendix 7b.11 Detailed Results of Spot
Check Dive & REA Transects at Shek Kwu Chau
Appendix 7b.12 Representative Photographs of
Habitats at Cheung Sha
Appendix 7b.13 Photographs of Flora and
Fauna Species of Conservation Interest at Cheung Sha
Appendix 7b.14 Flora Species Recorded within
the Study Area at Cheung Sha
Appendix 7b.15 Fauna Species recorded within
the Study Area at Cheung Sha
Appendix 7b.16 Detailed Benthos Survey
Results for the Submarine Cable Alignment Cheung Sha
Appendix 7b.17 Detailed Description of Spot
Check Dive Results at Cheung Sha
Appendix 9.1 Equations for Evaluating
Exposure and Risk
Appendix 9.2 Not Used
Appendix 9.3 Predicted Concentration and
Percentage of Averaged Project Contribution
Appendix 9.4 Predicted Annual Concentrations
of the Other COPCs
Appendix 9.5 Predicted Total Cancer Risk and
Hazard Quotient
Appendix 9.6 Predicted Acute Concentrations
of the Other COPCs
Appendix 9.7 Predicted Maximum Permitted
Concentration of Certain Metals in Foods
Appendix
Appendix 11b.1 Results of Hydrographic
Office Wreck Search
Appendix 11b.2 Geophysical Survey Charts and
Images of Sonar and Seismic Contacts
Appendix 11b.3 Inventory of Cultural
Heritage Sites for the artificial island near SKC
Appendix
VOLUME 4: FIGURES
List of Figures
Figure 1.1 Location
of the IWMF at the Tsang Tsui Ash Lagoons Site
Figure 1.2 Location
of the IWMF at the Artificial Island near Shek Kwu Chau
Figure 2.1 Areas
of Exclusion for Development of the IWMF
Figure 2.2 Shortlisted
Sites for the IWMF in Site Search Study
Figure 2.3 General
Layout of the IWMF at Tsang Tsui Ash Lagoons Site
Figure 2.4 General
Layout of the IWMF at the Artificial Island near Shek Kwu Chau
Figure 2.7 Construction
Details of Cellular Cofferdams
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 3b.1 Locations of Air Sensitive
Receviers (Artificial Island near Shek Kwu Chau)
Figure 3b.2 Locations of Emission Sources
(Artificial Island near Shek Kwu Chau)
Figure 3b.5b Contours of Cumulative Annual
Average NO2 Concentration in mg/m3- South Lantau (Artificial Island near
Shek Kwu Chau)
Figure 3b
Figure 3b.7b Contours of Cumulative Annual
Average RSP Concentration in mg/m3-
South Lantau (Artificial Island near Shek Kwu Chau)
Figure 3b
Figure
Figure
Figure
Figure 4b.1 Locations
of Representative Noise Sensitive Receivers at the Artificial Island near SKC
Figure 4b.2 Locations
of Fixed Noise Sources at the Artificial Island near SKC
Figure
Figure
Figure 5b.1 Locations
of Water Quality Sensitive Receivers
Figure 5b.2 Proposed
Reclamation Site at the Artificial Island near SKC
Figure 5b.3 Proposed
Submarine Cable Alignment Option from the Artificial Island near SKC to CLP
Power Grid
Figure 5b.4 Recommended
Extent and Dredging Rate of Dredging for Anti-scouring Protection Layer
Figure 5b.5 Proposed
Phasing of the Reclamation and Construction of Breakwater
Figure 5b.6 Location
of Outfall for Concentrated Brine
Figure 5b.7 Concurrent
Marine Work at South Lantau
Figure 5b.8 Recommended
Extent and Dredging Rate for the Maintenance Dredging
Figure 5b.9 Extent
of Filling before Closing of Seawall and Predicted Maximum Extent of SS Mixing
Zone for Reclamation
Figure 6b.1 As-Built
Sampling Locations at the Artificial Island near Shek Kwu Chau
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 7b.1 Habitat
Map and Species of Conservation Importance at Shek Kwu Chau
Figure 7b.2 Habitat
Map and Species of Conservation Importance at Cheung Sha
Figure 7b.3 Marine
Ecological Study Area
Figure 7b.4 Locations
of Ecological Surveys at Shek Kwu Chau
Figure 7b.5 Locations
of Ecological Surveys at Cheung Sha
Figure 7b.6 Locations
of Benthos Sampling Sites along the Submarine Cable Alignment
Figure 7b.7 Cover
Board Survey Locations at Shek Kwu Chau
Figure 7b.8 Marine
Mammal Line Transect Surveys
Figure 7b.9 REA
Transects at Shek Kwu Chau
Figure 7b.10 Distribution
of Finless Porpoise Sighting in Hong Kong between 2004 and 2010
Figure 7b.11 Seasonal
Distribution of Finless Porpoise Sightings in Hong Kong between 2004 and 2009
Figure 7b.12 SPSE
and DPSE of Finless Porpoise in Hong Kong between 2004 and 2009
Figure 7b.13 Distribution
of Finless Porpoise Sighting in Southeast Lantau between December 2008 and May
2009
Figure 7b.14 Original
Layout Plan at Shek Kwu Chau
Figure 7b.15 Indicative
Travel Route for IWMF Vessels
Figure
Figure 8b.1 Locations
of Key Fisheries Sensitive Receivers at Southern Water Control Zone
Figure 9.1 Location
of Radon Progeny
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 10b.1 IWMF
at the Artificial Island near SKC - Landscape Resource Plan
Figure 10b.2 IWMF
at the Artificial Island near SKC - Photos of Landscape Resources
Figure 10b.3 IWMF
at the Artificial Island near SKC - Landscape Character Area Plan
Figure 10b.4 IWMF
at the Artificial Island near SKC - Photos of Landscape Character Areas
Figure 10b.5 IWMF
at the Artificial Island near SKC - Visual Sensitive Receiver Plan (Sheet 1 of
2)
Figure 10b.6 IWMF
at the Artificial Island near SKC - Visual Sensitive Receiver Plan (Sheet 2 of
2)
Figure 10b.7 IWMF
at the Artificial Island near SKC - Photos of Visual Sensitive Receivers (Sheet
1 of 3)
Figure 10b.8 IWMF
at the Artificial Island near SKC - Photos of Visual Sensitive Receivers (Sheet
2 of 3)
Figure 10b.9 IWMF
at the Artificial Island near SKC - Photos of Visual Sensitive Receivers (Sheet
3 of 3)
Figure 10b.10 IWMF
at the Artificial Island near SKC - Landscape and Visual Mitigation Measures
Plan
Figure 10b.11 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 1 -
Footpath along the Hill
Figure 10b.12 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 1 - Footpath along
the Hill in Unmitigated Scenario
Figure 10b.13 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 1 - Footpath along
the Hill in Day 1 Operation
Figure 10b.14 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 1 - Footpath along
the Hill in Year 10 Operation
Figure 10b.15 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 2 - Shun
House
Figure 10b.16 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 2 - Shun House in
Unmitigated Scenario
Figure 10b.17 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 2 - Shun House in Day
1 Operation
Figure 10b.18 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 2 - Shun House in
Year 10 Operation
Figure 10b.23 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 4 - Sea
Figure 10b.24 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 4 - Sea in
Unmitigated Scenario
Figure 10b.25 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 4 - Sea in Day 1
Operation
Figure 10b.26 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 4 - Sea in Year 10
Operation
Figure 10b.27 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 5 - Cheung
Sha, South Lantau Island
Figure 10b.29 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 5 - Cheung Sha, South
Lantau Island in Day 1 Operation
Figure 10b.31 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 6 - Cheung
Po Tsai Cave, Cheung Chau
Figure 10b.33 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 6 - Cheung Po Tsai
Cave, Cheung Chau in Day 1 Operation
Figure 10b.35 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 7 - Cheung
Chau Ferry Pier
Figure 10b.36 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 7 - Cheung Chau Ferry
Pier in Unmitigated Scenario
Figure 10b.37 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 7 - Cheung Chau Ferry
Pier in Day 1 Operation
Figure 10b.38 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR7 - Cheung Chau Ferry
Pier in Year 10 Operation
Figure 10b.39 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 8 - Pui O
Beach
Figure 10b.40 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 8 - Pui O Beach in
Unmitigated Scenario
Figure 10b.41 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 8 - Pui O Beach in
Day 1 Operation
Figure 10b.42 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR8 - Pui O Beach in
Year 10 Operation
Figure 10b.43 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 9 - Lantau
Trail Stage 2
Figure 10b.44 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 9 - Lantau Trail Stage
2 in Unmitigated Scenario
Figure 10b.45 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 9 - Lantau Trail
Stage 2 in Day 1 Operation
Figure 10b.46 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR9 - Lantau Trail Stage
2 in Year 10 Operation
Figure 10b.47 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 10 - Lantau
Trail Stage 3
Figure 10b.48 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 10 - Lantau Trail
Stage 3 in Unmitigated Scenario
Figure 10b.49 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 10 - Lantau Trail
Stage 3 in Day 1 Operation
Figure 10b.50 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR10 - Lantau Trail
Stage 3 in Year 10 Operation
Figure 10b.51 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 11 - Tong
Fuk Beach
Figure 10b.52 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 11 - Tong Fuk Beach
in Unmitigated Scenario
Figure 10b.53 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 11 - Tong Fuk Beach
in Day 1 Operation
Figure 10b.54 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR11 - Tong Fuk Beach in
Year 10 Operation
Figure 10b.59 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 13 - Chi Ma
Wan Trail - Yi Long Wan
Figure 10b.61 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 13 - Chi Ma Wan Trail
- Yi Long Wan in Day 1 Operation
Figure 10b.62 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR13 - Chi Ma Wan Trail
- Yi Long Wan in Year 10 Operation
Figure 10b.63 Existing
Condition of IWMF at the Artificial Island near SKC viewed from VSR 14 - Tai
Long Wan
Figure 10b.64 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 14 - Tai Long Wan in
Unmitigated Scenario
Figure 10b.65 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 14 - Tai Long Wan in
Day 1 Operation
Figure 10b.66 Photomontage
of IWMF at the Artificial Island near SKC viewed from VSR 14 - Tai Long Wan in
Year 10 Operation
Figure 10b.67 Existing
Condition of IWMF at the Artificial Island near SKC - Bird's eye View
Figure 10b.68 Photomontage
of IWMF at the Artificial Island near SKC - Bird's eye View in Unmitigated
Scenario
Figure 10b.69 Photomontage
of IWMF at the Artificial Island near SKC - Bird's eye View in Day 1 Operation
Figure 10b.70 Photomontage
of IWMF at the Artificial Island near SKC - Bird's eye View in Year 10
Operation
Figure
Figure 11b.1 Study
Area for Marine Archaeological Investigation
Figure 11b.2 British
Admiralty Chart 1899 and Chart of Islands S.E. of Lantau 1786
Figure 11b.3 Locations
of Sonar and Seismic Contacts in the MAI Study Area
Figure 11b.4 Location
of the Built Heritage Resources at
Shek Kwu Chau
Figure 11b.5 Location
of Built Heritage Sites at Shek Kwu
Chau
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure