Contents

                                                                                                                                                       Page

1            Introduction                                                                                           1-1

1.1           Project Background                                                                 1-1

1.2           Site Location and History                                                        1-2

1.3           The Project                                                                              1-2

1.4           EIA Study Brief                                                                       1-2

1.5           Designated Projects                                                                 1-3

1.6           Objectives of the EIA Study                                                   1-3

1.7           Structure of This EIA Report                                                  1-4

 

2            Project Description                                                                                2-1

2.1           Purposes and Objectives of the Project                                   2-1

2.2           Environmental Benefits of the Project                                    2-1

2.3           Scenarios “With” and “Without” the Project                          2-2

2.4           Tackling Environmental Challenges and Options

                Considered                                                                               2-4

2.5           Proposed Development Scheme                                            2-27

2.6           Consideration of Alternative Construction

                Methodologies                                                                       2-39

2.7           Environmental Conscious Turfgrass Management Plan

                (TMP) – An Outline                                                              2-46

2.8           Environmental Initiatives                                                      2-50

2.9           Collating and Addressing Public Views                               2-53

2.10         Tentative Implementation Programme                                  2-58

2.11         Concurrent Projects                                                               2-58

2.12         Summary of Environmental Benefits and

                Environmental Achievements of the Project                         2-61

 

3            Air Quality                                                                                             3-1

3.1           Legislation, Standards and Guidelines                                    3-1

3.2           Description of the Environment                                              3-3

3.3           Air Sensitive Receivers                                                           3-6

3.4           Construction Dust Assessment                                                3-8

3.5           Operational Air Quality Impact Assessment                         3-21

3.6           Conclusion                                                                             3-44

3.7           Reference                                                                               3-45

 

4            Hazard to Life                                                                                        4-1

4.1           Legislation, Standards and Guidelines                                    4-1

4.2           Description of the Environment                                              4-2

4.3           Development Plan of Project Site                                           4-3

4.4           Construction Phase Impact Evaluation                                   4-3

4.5           Operational Phase Impact Evaluation                                     4-4

4.6           Mitigation Measures                                                                4-5

4.7           Conclusion                                                                               4-6

 

5            Noise                                                                                                        5-1

5.1           Legislation, Standards and Guidelines                                    5-1

5.2           Description of the Environment                                              5-5

5.3           Noise Sensitive Receivers                                                       5-6

5.4           Construction Noise Assessment                                              5-8

5.5           Fixed Noise Sources Impact Assessment                              5-15

5.6           Conclusion                                                                             5-22

 

6            Water Quality                                                                                        6-1

6.1           Legislation, Standards and Guidelines                                    6-1

6.2           Baseline Conditions                                                               6-12

6.3           Assessment Area and Water Sensitive Receivers                 6-16

6.4           Construction Phase Assessment                                            6-17

6.5           Operational Phase Assessment                                              6-22

6.6           Conclusion                                                                             6-35

6.7           Reference                                                                               6-36

 

7            Waste Management Implications                                                        7-1

7.1           Legislation, Standards and Guidelines                                    7-1

7.2           Description of the Environment                                              7-3

7.3           Construction Phase                                                                  7-4

7.4           Operational Phase                                                                  7-22

7.5           Conclusion                                                                             7-25

 

8            Land Contamination                                                                             8-1

8.1           Legislation, Standards and Guidelines                                    8-1

8.2           The Project                                                                              8-6

8.3           Description of the Environment                                              8-6

8.4           Assessment Methodology                                                       8-7

8.5           Desktop Review                                                                      8-8

8.6           Site Survey                                                                              8-9

8.7           Other Relevant Information                                                  8-11

8.8           Future Landuses                                                                    8-12

8.9           Potential for Future Land Contamination                             8-12

8.10         Identification of Potentially Contaminated Sites                  8-13

8.11         Conclusion                                                                             8-14

 

9            Landfill Gas Hazards                                                                            9-1

9.1           Legislation, Standards and Guidelines                                    9-1

9.2           Description of the Environment                                              9-7

9.3           Qualitative Risk Assessment in Construction Phase               9-7

9.4           Qualitative Risk Assessment in Operational Phase              9-28

9.5           Conclusion                                                                             9-41

9.6           References                                                                             9-42

 

10          Ecological Impact Assessment                                                            10-1

10.1         Introduction                                                                           10-1

10.2         Legislation, Standards and Guidelines                                  10-2

10.3         Methodology for Baseline Establishment                             10-5

10.4         Ecological Baseline Conditions                                          10-11

10.5         Impact Identification and Prediction                                   10-37

10.6         Impact Evaluation for Terrestrial Ecology                          10-40

10.7         Impact Evaluation for Marine Ecology                               10-47

10.8         Cumulative Impacts                                                            10-52

10.9         Mitigation Measures                                                            10-53

10.10       Residual Impacts                                                                 10-74

10.11       Environmental Monitoring and Audit (EM&A)                 10-74

10.12       Conclusions                                                                         10-75

10.13       Reference                                                                             10-76

 

11          Fisheries                                                                                                11-1

11.1         Legislation, Standards and Guidelines                                  11-1

11.2         Requirements of EIA Study Brief                                         11-2

11.3         Methodology for Baseline Establishment                             11-4

11.4         Description of Existing Fisheries Baseline Conditions         11-5

11.5         Assessment Methodology                                                   11-10

11.6         Fisheries Impact Evaluation                                                11-11

11.7         Cumulative Impacts                                                            11-20

11.8         Mitigation Measures                                                            11-22

11.9         Residual Impacts                                                                 11-25

11.10       EM&A for Fisheries                                                            11-25

11.11       Conclusion                                                                           11-25

11.12       References                                                                           11-27

 

12          Landscape and Visual Impact                                                            12-1

12.1         Introduction                                                                           12-1

12.2         Legislation, Standards and Guidelines                                  12-2

12.3         Landscape and Visual Assessment Methodology                 12-4

12.4         Key Development Components                                          12-14

12.5         Review of Planning and Development Control

                Framework                                                                          12-15

12.6         Baseline Condition                                                              12-19

12.7         Identification and Evaluation of Environmental Impact     12-58

12.8         Cumulative Impacts                                                            12-91

12.9         Mitigation of Landscape and Visual Impact                       12-92

12.10       Programme and Funding Arrangement for Landscape

                and Visual Mitigation Measures                                       12-103

12.11       Evaluation of Residual Impact                                          12-109

12.12       Environmental Monitoring and Audit                               12-134

12.13       Conclusion                                                                         12-134

 

13          Environmental Monitoring and Auditing Requirements                13-1

13.1         Introduction                                                                           13-1

13.2         Project Organisation                                                              13-1

13.3         EM&A Manual                                                                      13-1

13.4         Environmental Mitigation Implementation Schedule           13-2

13.5         EM&A Programme                                                               13-3

13.6         EM&A Requirement                                                             13-3

 

14          Summary of Environmental Outcomes                                             14-1

14.1         General                                                                                  14-1

14.2         Environmental Friendly Options Considered

                and Incorporated to Avoid Environmental Impact                14-1

14.3         Environmental Designs Recommended to Minimise

                and Mitigate Environmental Impacts                                    14-2

14.4         Summary of Key Environmental Problems Avoided

                and Sensitive Areas Protected                                               14-6

14.5         Estimated Population Protected from Various

                Environmental Impacts                                                         14-7

14.6         Environmental Benefits of Environmental Protection Measures Recommended           14-7

 

15          Conclusion                                                                                            15-1

15.1         General                                                                                  15-1

15.2         Air Quality                                                                             15-2

15.3         Hazard to Life                                                                        15-3

15.4         Noise                                                                                      15-3

15.5         Water Quality                                                                        15-4

15.6         Waste Management Implication                                           15-5

15.7         Land Contamination                                                              15-5

15.8         Landfill Gas Hazards                                                             15-6

15.9         Ecological Impact                                                                  15-7

15.10       Fisheries Impact                                                                    15-8

15.11       Landscape and Visual Impact                                               15-9

 

Figures

 

Figure 1.1

Location of Project

Figure 2.1

Project Layout (Tentative)

Figure 2.2

Indicative Illustration of Site Formation and Landscape Planting in Phases

Figure 2.3

Layout Comparison

Figure 2.4

Locations of Concurrent Projects

Figure 3.1

Locations of Concerned PATH Grids

Figure 3.2

Key Representative Air Sensitive Receivers

Figure 3.2a

Proposed 3m High Hoarding Extent

Figure 3.3a

Contours of Cumulative Unmitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.3b

Contours of Cumulative Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.3c

Contours of Cumulative Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.3d

Contours of Cumulative Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.3e

Contours of Cumulative Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.3f

Contours of Cumulative Unmitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.3g

Contours of Cumulative Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.3h

Contours of Cumulative Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.3i

Contours of Cumulative Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.3j

Contours of Cumulative Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.3k

Contours of Cumulative Unmitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.3l

Contours of Cumulative Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.3m

Contours of Cumulative Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.3n

Contours of Cumulative Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.3o

Contours of Cumulative Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.4a

Contours of Cumulative Mitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.4b

Contours of Cumulative Mitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.4c

Contours of Cumulative Mitigated Annual RSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.4d

Contours of Cumulative Mitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2021)

Figure 3.4e

Contours of Cumulative Mitigated Annual FSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.4f

Contours of Cumulative Mitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2022

Figure 3.4g

Contours of Cumulative Mitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.4h

Contours of Cumulative Mitigated Annual RSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.4i

Contours of Cumulative Mitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.4j

Contours of Cumulative Mitigated Annual FSP concentrations at 1.5m Above Ground (Year 2022)

Figure 3.4k

Contours of Cumulative Mitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.4l

Contours of Cumulative Mitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.4m

Contours of Cumulative Mitigated Annual RSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.4n

Contours of Cumulative Mitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.4o

Contours of Cumulative Mitigated Annual FSP concentrations at 1.5m Above Ground (Year 2023)

Figure 3.5

Locations of Industrial Emissions

Figure 3.6

Locations of Open Road and Marine Emissions

Figure 3.7

Locations of Odour Sources

Figure 3.8a

Contours of Cumulative 19th High 1-hour NO2 concentrations at 1.5m Above Ground (Year 2024)

Figure 3.8b

Contours of Cumulative Annual NO2 concentrations at 1.5m Above Ground (Year 2024)

Figure 3.8c

Contours of Cumulative 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2024)

Figure 3.8d

Contours of Cumulative Annual RSP concentrations at 1.5m Above Ground (Year 2024)

Figure 3.8e

Contours of Cumulative 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2024)

Figure 3.8f

Contours of Cumulative Annual FSP concentrations at 1.5m Above Ground (Year 2024)

Figure 3.9

Contours of Cumulative 5-second Maximum Odour Concentrations at 1.5m Above Ground

Figure 4.1

Societal Risks Criteria

Figure 4.2

Locations of Project Site, Tai Po Gas Production Plant and its Consultation Zone

Figure 5.1

Locations of Noise Sensitive Receivers

Figure 6.1a

Locations of EPD Monitoring Stations

Figure 6.1b

Locations of Representative Water Sensitive Receivers

Figure 6.2

Proposed Location of Outfall during Extreme/ Prolonged Rainfall

Figure 8.1

Photo Records of the Site Survey (Sheet 1 of 7)

Figure 8.1a

Photo Records of the Site Survey (Sheet 2 of 7)

Figure 8.1b

Photo Records of the Site Survey (Sheet 3 of 7)

Figure 8.1c

Photo Records of the Site Survey (Sheet 4 of 7)

Figure 8.1d

Photo Records of the Site Survey (Sheet 5 of 7)

Figure 8.1e

Photo Records of the Site Survey (Sheet 6 of 7)

Figure 8.1f

Photo Records of the Site Survey (Sheet 7 of 7)

Figure 9.1

Landfill Gas Consultation Zone of Shuen Wan Restored Landfill

Figure 10.1a

Fauna Sampling Locations

Figure 10.1b & c

Photos of Vantage Points for surveys on Collared Crow and Black Kite

Figure 10.2

Recognised Site of Conservation Importance

Figure 10.3

Habitat Map and Locations of Species of Conservation Importance (Sheet 1 of 4)

Figure 10.3a

Habitat Map and Locations of Species of Conservation Importance (Sheet 2 of 4)

Figure 10.3b

Habitat Map and Locations of Species of Conservation Importance (Sheet 3 of 4)

Figure 10.3c

Habitat Map and Locations of Species of Conservation Importance (Sheet 4 of 4)

Figure 10.4

Photos of Habitats and Species of Conservation Importance

Figure 10.5a, b & c

Collared Crow Night Roost Locations

Figure 10.6a, b & c

Black Kite Night Roost Locations

Figure 10.7a

Analysis of Roost Habitat Use – Collared Crow

Figure 10.7b

Analysis of Roost Habitat Use – Black Kite

Figure 10.7c

Analysis of Roost Habitat Use – High Use Areas

Figure 10.8

Project Layout Plan Overlaid Habitat Map

Figure 10.9

Locations of Preserved plantation and New planting trees

Figure 10.10

Locations with Restricted Hours for Powered Mechanical Equipment

Figure 11.1

Location of the Project Site and Sites of Fisheries Importance within the Assessment Area

Figure 11.2

Distribution of Fisheries Production (Source: AFCD 2018)

Figure 11.3a

Distribution of Fishing Vessel Operation (Sampans) (Source: AFCD 2018)

Figure 11.3b

Distribution of Fishing Vessel Operation (Other types of Vessels) (Source: AFCD 2018)

Figure 11.4a

Distribution of Fisheries Production (Sampans) (Source: AFCD 2018)

Figure 11.4b

Distribution of Fisheries Production (Other types of Vessels) (Source: AFCD 2018)

Figure 11.5

Location of Project Site and Fish Culture Zones (Source: AFCD 2018)

Figure 12.1

Review of Planning and Development Control Framework (Scenario 1 and Scenario 2)

Figure 12.2

Landscape Resources (Scenario 1 and Scenario 2)

Figure 12.3.1

Photographs of Landscape Resources –Sheet 1 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.2

Photographs of Landscape Resources –Sheet 2 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.3

Photographs of Landscape Resources –Sheet 3 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.4

Photographs of Landscape Resources –Sheet 4 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.5

Photographs of Landscape Resources –Sheet 5 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.6

Photographs of Landscape Resources –Sheet 6 of 7 (Scenario 1 and Scenario 2)

Figure 12.3.7

Photographs of Landscape Resources –Sheet 7 of 7 (Scenario 1 and Scenario 2)

Figure 12.4

Landscape Character Areas (Scenario 1 and Scenario 2)

Figure 12.5

Photographs of Landscape Character Areas (Scenario 1 and Scenario 2)

Figure 12.6.1

Visual Envelope and Visually Sensitive Receivers (Scenario 1)

Figure 12.6.2

Visual Envelope and Visually Sensitive Receivers (Scenario 2)

Figure 12.7.1

Visual Context of Visually Sensitive Receivers – Sheet 1 of 7 (Scenario 1 and Scenario 2)

Figure 12.7.2.1

Visual Context of Visually Sensitive Receivers – Sheet 2 of 7 (Scenario 1)

Figure 12.7.2.2

Visual Context of Visually Sensitive Receivers – Sheet 2 of 7 (Scenario 2)

Figure 12.7.3

Visual Context of Visually Sensitive Receivers – Sheet 3 of 7 (Scenario 1 and Scenario 2)

Figure 12.7.4.1

Visual Context of Visually Sensitive Receivers – Sheet 4 of 7 (Scenario 1)

Figure 12.7.4.2

Visual Context of Visually Sensitive Receivers – Sheet 4 of 7 (Scenario 2)

Figure 12.7.5.1

Visual Context of Visually Sensitive Receivers – Sheet 5 of 7 (Scenario 1)

Figure 12.7.5.2

Visual Context of Visually Sensitive Receivers – Sheet 5 of 7 (Scenario 2)

Figure 12.7.6.1

Visual Context of Visually Sensitive Receivers – Sheet 6 of 7 (Scenario 1)

Figure 12.7.6.2

Visual Context of Visually Sensitive Receivers – Sheet 6 of 7 (Scenario 2)

Figure 12.7.7

Visual Context of Visually Sensitive Receivers – Sheet 7 of 7 (Scenario 1 and Scenario 2)

Figure 12.8.1

Impact on Landscape Resources (Scenario 1)

Figure 12.8.2

Impact on Landscape Resources (Scenario 2)

Figure 12.9.1

Impact on Landscape Character Areas (Scenario 1)

Figure 12.9.2

Impact on Landscape Character Areas (Scenario 2)

Figure 12.10.1

Visual Impacts (Scenario 1)

Figure 12.10.2

Visual Impacts (Scenario 2)

Figure 12.11.1.1

Recommendation Landscape and Visual Mitigation Plan – Master Plan (Scenario 1)

Figure 12.11.1.2

Recommendation Landscape and Visual Mitigation Plan – Master Plan (Scenario 2)

Figure 12.11.2

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)

Figure 12.11.3

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)

Figure 12.11.4

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)

Figure 12.11.5

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)

Figure 12.11.6.1

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1)

Figure 12.11.6.2

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 2)

Figure 12.11.7.1

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 1)

Figure 12.11.7.2

Recommendation Landscape and Visual Mitigation Plan – Sections (Scenario 2)

Figure 12.12.1

Photomontages – Vantage Point A – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.2

Photomontages – Vantage Point A – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.3

Photomontages – Vantage Point B – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.4

Photomontages – Vantage Point B – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.5.1

Photomontages – Vantage Point C – Sheet 1 of 2 (Scenario 1)

Figure 12.12.5.2

Photomontages – Vantage Point C – Sheet 1 of 2 (Scenario 2)

Figure 12.12.6.1

Photomontages – Vantage Point C – Sheet 2 of 2 (Scenario 1)

Figure 12.12.6.2

Photomontages – Vantage Point C – Sheet 2 of 2 (Scenario 2)

Figure 12.12.7.1

Photomontages – Vantage Point D – Sheet 1 of 2 (Scenario 1)

Figure 12.12.7.2

Photomontages – Vantage Point D – Sheet 1 of 2 (Scenario 2)

Figure 12.12.8.1

Photomontages – Vantage Point D – Sheet 2 of 2 (Scenario 1)

Figure 12.12.8.2

Photomontages – Vantage Point D – Sheet 2 of 2 (Scenario 2)

Figure 12.12.9

Photomontages – Vantage Point E – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.10

Photomontages – Vantage Point E – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.11.1

Photomontages – Vantage Point F – Sheet 1 of 2 (Scenario 1)

Figure 12.12.11.2

Photomontages – Vantage Point F – Sheet 1 of 2 (Scenario 2)

Figure 12.12.12.1

Photomontages – Vantage Point F – Sheet 2 of 2 (Scenario 1)

Figure 12.12.12.2

Photomontages – Vantage Point F – Sheet 2 of 2 (Scenario 2)

Figure 12.12.13

Photomontages – Vantage Point G – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.14

Photomontages – Vantage Point G – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.15

Photomontages – Vantage Point H – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.16

Photomontages – Vantage Point H – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.17

Photomontages – Vantage Point I – Sheet 1 of 2 (Scenario 1 and Scenario 2)

Figure 12.12.18

Photomontages – Vantage Point I – Sheet 2 of 2 (Scenario 1 and Scenario 2)

Figure 12.13.1.1

Artist Impression of the Golf Course – Sheet 1 of 2 (Scenario 1)

Figure 12.13.1.2

Artist Impression of the Golf Course – Sheet 1 of 2 (Scenario 2)

Figure 12.13.2.1

Artist Impression of the Golf Course – Sheet 2 of 2 (Scenario 1)

Figure 12.13.2.2

Artist Impression of the Golf Course – Sheet 2 of 2 (Scenario 2)

 

 

Appendices

 

Appendix 2.1

Monthly Means of Rainfall Statistics for Tai Po (2000 – 2018)

Appendix 2.2

Construction Programme

Appendix 2.3

Engineering Drawings

Appendix 3.1

Construction Programme

Appendix 3.2

Calclations of Dust Emissions

Appendix 3.3

Surface Characteristic Parameters

Appendix 3.4

Vehicular Emission Factors (Construction Phase)

Appendix 3.5

Detailed Construction Dust Assessment Results (Unmitigated Scenario)

Appendix 3.6

Justification of Watering Efficiency

Appendix 3.7

Detailed Construction Dust Assessment Results (Mitigated Scenario)

Appendix 3.8

Traffic Forecast

Appendix 3.9

EMFAC-HK Model Assumptions

Appendix 3.10

Vehicular Emission Factor (Operational Phase)

Appendix 3.11

Calculations of Industrial Emissions

Appendix 3.11a

Sensitivity Test with Maximum SP Emission Rates for Non-SP Chimneys

Appendix 3.12

Calculations of Marine Emissions

Appendix 3.13

Calculations of Odour Emissions

Appendix 3.14

Detailed Operational Air Quality Assessment Results

Appendix 5.1

Photos of the Representative Existing NSRs

Appendix 5.2

SWL of PME

Appendix 5.3

Detailed PME Inventory

Appendix 5.4

Locations of Workfronts and Phases of Construction

Appendix 5.5

Unmitigated Construction Noise Impacts at Selected NSRs

Appendix 5.6

Sketch of Typical Temporary Noise Barrier

Appendix 5.7

Mitigated Construction Noise Impacts at Selected NSRs

Appendix 5.8

Locations of Fixed Noise Sources in the Project

Appendix 5.8a

Catalogue of Tractor, Aerator and Mower

Appendix 5.9

Predicted Fixed Noise Sources Impacts at Selected NSRs

Appendix 5.10

Section Drawings for Staff Quarters and Overnight Accommodation

Appendix 5.11

Sketch of Absorptive Noise Barrier

Appendix 5.12

Predicted Fixed Noise Sources Impacts at Selected NSRs (Mitigated)

Appendix 6.1

Detailed Calculation of Criteria for Fungicides and Insecticides

Appendix 6.2

Analysis of Stormwater Bypass

Appendix 6.2a

Preliminary Sewage Flow Estimation

Appendix 6.2b

Peak Sewerage Flow of Proposed and Existing Sewerage Catchments

Appendix 6.2c

Hydraulic Performance of the Downstream Sewerage System

Appendix 6.3

Detailed Calculation of Residual Concentrations of Fungicides, Insecticides, TIN and TP

Appendix 6.4

Detailed Calculation of TIN and TP Loading to Tolo Harbour

Appendix 8.1

Historical Aerial Photographs

Appendix 8.2

Site Walkover Checklist

Appendix 8.3

Correspondences with FSD and EPD

Appendix 9.1

Not Used

Appendix 9.2

Not Used

Appendix 9.3

Not Used

Appendix 9.4

Monitoring Data for Shuen Wan Restored Landfill

Appendix 9.5

Preliminary Plan for Settlement Monitoring

Appendix 9.6

Mitigation Measures on LFG Hazards

Appendix 9.7

Air Change Rate Calculation

Appendix 9.8

LFG Controls by Gas-proof Membrane and Compacted High Density Concrete

Appendix 10.1

Plant Species Recorded within the Assessment Area

Appendix 10.2

Mammal Species Recorded within the Assessment Area

Appendix 10.3a

Bird Species Recorded within the Assessment Area

Appendix 10.3b

Number of Collared Crow recorded during the Roosting Surveys

Appendix 10.3c

Number of Black Kite recorded during Roosting Surveys

Appendix 10.4

Reptile Species Recorded within the Assessment Area

Appendix 10.5

Amphibian Species Recorded within the Assessment Area

Appendix 10.6

Dragonfly Species Recorded within the Assessment Area

Appendix 10.7

Butterfly Species Recorded within the Assessment Area

Appendix 10.8

Aquatic fauna recorded in the watercourse within the Assessment Area during wet season

Appendix 10.9

Aquatic fauna recorded in the watercourse within the Assessment Area during dry season

Appendix 10.10

Intertidal organisms recorded in the qualitative survey within the Assessment Area during wet season

Appendix 10.11

Intertidal organisms recorded in the qualitative survey within the Assessment Area during dry season

Appendix 10.12

Intertidal organisms recorded in the quantitative survey within the Assessment Area during wet season

Appendix 10.13

Intertidal organisms recorded in the quantitative survey within the Assessment Area during dry season

Appendix 10.14

Abundance of subtidal benthos species recorded at each sampling location within the Assessment Area during wet season

Appendix 10.15

Biomass of subtidal benthos species recorded at each sampling location within the Assessment Area during wet season

Appendix 10.16

Abundance of subtidal benthos species recorded at each sampling location within the Assessment Area during dry season

Appendix 10.17

Biomass of subtidal benthos species recorded at each sampling location within the Assessment Area during dry season

Appendix 10.18

Construction Programme

Appendix 12.1

Group Tree Survey

Appendix 15.1

Key Assessment Assumptions and Limitation of Assessment Methodologies

Appendix 15.2

Summary of environmental impacts associated with the Project