TABLE OF CONTENTS
1.4 Recommended
Outline Development Plan (RODP)
1.5 Designated
Project under EIAO
1.7 Objectives
of this EIA Study
1.8 Structure
of the EIA Report
List of Tables
Table 1.1 Schedule 2 Designated
Projects in this Project
Table 1.2 Summary of Non-Designated
Projects
List of Figures
Project Location
Plan |
|
Location of
Designated Projects (Sheet 1 of 2) |
|
Location of
Designated Projects (Sheet 2 of 2) |
|
|
|
|
|
1: An urban development or redevelopment project, which covers an area
more than 50 ha.
Table 1.1 Schedule 2 Designated Projects in
this Project
Ref.
No. |
Schedule
2 Designated Project |
Work
Component /Reference in RODP |
|
DP1 |
A.8 |
A
carriageway bridge for motor vehicles, or a railway bridge, the length
between abutments for which is more than 100 m, with bridge piers over the
sea supporting the bridge |
A
carriageway bridge in form of viaduct structure for motor vehicles with a
minimum length of about 700 m between abutments and supported by piers over
the sea, will be constructed near TKO-LTT to provide a direct and convenient
connection to the proposed facilities at TKO 132. |
DP2 |
C.1 |
Reclamation
works (including associated dredging works) more than 5 ha in size |
Around
20 ha of land will be formed by reclamation at TKO 137. |
C.2 |
Reclamation
works (including associated dredging works) that are of more than 1 ha in
size, and a boundary of which is (c) less than 100 m from the nearest
boundary of an existing residential area |
Project
boundary of the reclamation works (around 19 ha) at TKO 132 is around 30 m
from the nearest boundary of On Luen Village (location of existing government
land licences). |
|
DP3 |
F.1 |
Sewage
treatment works with an installed capacity of more than 15,000 m3
per day |
Construction
and operation of an EPP with an installed capacity of approx. 54,000 m3
per day at TKO 137. The EPP is around
100 m from the planned residential area and around 60 m from the planned
educational institution at TKO 137. |
F.2 |
Sewage
treatment works (a) with an installed capacity of more than 5,000 m3
per day; and (b) a boundary of which is less than 200m from the nearest
boundary of an existing or planned (i) residential area and (iii) educational
institution |
||
DP4 |
G.2 |
A refuse transfer station |
Construction and operation of a RTS at formed land off TKO 132 |
DP5 |
G.5 |
A
facility for the treatment of construction waste (a) with a designed capacity
of more than 500 tonnes per day; and (b) a boundary of which is less than 200
m from the nearest boundary of an existing or planned (i) residential area |
Construction
and operation of a Construction Waste Handling Facility with handling
capacity of around 3,000 tonnes per day at formed land off TKO 132. |
DP6 |
H.1 |
A
400kV electricity substation and transmission line |
Construction
and operation of Electricity Facilities (EFs) at formed land off TKO
132. EFs are planned to house
equipment up to 400kV. |
Note:
1
Application of Environmental Permit (EP) will be
supported by this EIA Study.
2
Application of EP will be supported by a separate
Schedule 2 EIA Study or separate Direct Application of EP to be conducted by the
respective project proponent.
3
There is no design
information for EFs provided from the operator at the time of assessment. The assumption of a 400 kV electricity
substation, a Schedule 2 DP under EIAO, is considered in this EIA study.
Table 1.2 Summary of Non-Designated Projects
Non-Designated
Project |
Sub-Element |
TKO 132 |
|
Other
Specified Uses (OU) |
Public
Fill Transfer Facility (OU(PFTF)) |
Concrete
Batching Plant (OU(CBP)) |
|
Sewage
Pumping Station (OU(SPS)) |
|
Amenity
(A) |
Roadside
amenity |
Roads |
Local
roads |
TKO 137 |
|
Residential
Development |
Public
Housing Site (RSc) |
Private
Housing - Zone 1 (R1) |
|
Private
Housing - Zone 2 (R2) |
|
Public
Transport Interchange |
|
Social
Welfare Facilities |
|
Government,
Institutional or Community (G/IC) |
Divisional
Police Station |
Sub-divisional
Fire Station cum Ambulance Depot |
|
Sports
centre and Government Reserve |
|
Government
Complex (includes Swimming Pool Complex, Sports Centre, Public Market,
Community Hall, Health Centre, Recycling Store, Refuse Collection Point) |
|
Education
(E) |
Schools |
Open
Space (O) |
Recreational
Facilities and Landscaping |
Other
Specified Uses (OU) |
Electrical
Substation (OU(ESS)) |
Green
Fuel Station (OU(GFS)) |
|
Salt Water
Service Reservoir (OU(SWSR)) |
|
Fresh
Water Service Reservoir (OU(FWSR)) |
|
Roads |
Local
roads |
(a)
Should
the change(s) involve a DP item under Schedule 2 of the EIAO, the requirements
under the EIAO will be complied with; and
(b)
Should
the change(s) not involve any DP items under Schedule 2 of the EIAO, prevailing
planning mechanisms and standards will be followed and relevant EIA findings
will be conformed to.
(a)
the
overall acceptability of any adverse environmental consequences that are likely
to arise as a result of the Project;
(b)
the
conditions and requirements for the detailed design, construction and operation
of the Project to mitigate against adverse environmental consequences wherever
practicable; and
(c)
the
acceptability of residual impacts after the proposed mitigation measures are
implemented.
(a)
to
describe the Project and associated works together with the requirements and
environmental benefits for carrying out the Project;
(b)
to
identify and describe the elements of the community and environment likely to
be affected by the Project and/or likely to cause adverse impacts to the
Project, including both the natural and man-made environment and the associated
environmental constraints;
(c)
to
identify and quantify emission sources and determine the significance of
impacts on sensitive receivers and potential affected uses, and to propose
measures to mitigate these impacts;
(d)
to
identify and quantify any potential impacts from point and non-point pollution
sources on the identified water systems and sensitive receivers and to propose
measures to mitigate these impacts;
(e)
to
identify and quantify potential waste management requirements and to propose
measures to mitigate these impacts;
(f)
to
identify and quantify contaminated land within the Project area, and to propose
measures to avoid disposal in the first instance;
(g)
to
identify, evaluate and address any potential ecological impacts arising from
the Project and to propose measures to mitigate these impacts;
(h)
to
identify and quantify the fisheries impacts and to propose measures to mitigate
these impacts;
(i)
to
identify any potential landscape and visual impacts and to propose measures to
mitigate these impacts;
(j)
to
identify any negative impacts on cultural heritage and to propose measures to
mitigate these impacts;
(k)
to
identify potential hazard to life impacts and to propose mitigation measures to
mitigate these impacts;
(l)
to
assess and propose safety and precautionary measures for minimising risks due
to landfill gas migration or leachate contamination;
(m)
to
identify any impacts from electric and magnetic fields and to propose measures
to mitigate these impacts;
(n)
to
propose the provision of infrastructure or mitigation measures so as to
minimize pollution, environmental disturbance and nuisance during the
construction and operation stages of the Project;
(o)
to
investigate the feasibility, practicability, effectiveness and implications of
the proposed mitigation measures;
(p)
to
identify, predict and evaluate the residual environmental impacts (i.e. after
practicable mitigation) and the cumulative effects expected to arise during the
construction and operation phases of the Project in relation to the sensitive
receivers and potential affected uses;
(q)
to
identify, assess and specify methods, measures and standards, to be included in
the detailed design, construction and operation of the Project which are
necessary to mitigate these residual environmental impacts and cumulative
effects and reduce them to acceptable levels;
(r)
to
investigate the extent of the secondary environmental impacts that may arise
from the proposed mitigation measures and to identify constraints associated
with the mitigation measures recommended in the EIA study, as well as the
provision of any necessary modification;
(s)
to
design and specify the environmental monitoring and audit requirements;
(t)
to
identify any additional studies necessary to implement the mitigation measures
and proposals recommended in the EIA report; and
(u)
to
identify DP(s) listed under Schedule 2 of the EIAO as part of the Project for
assessment under the EIA study.
·
Section
3: Air Quality Impact
·
Section
4: Noise Impact
·
Section
5: Water Quality Impact
·
Section
6: Sewerage and Sewage Treatment
Implications
·
Section
7: Waste Management Implications
·
Section
8: Land Contamination
·
Section
9: Ecological Impact (Terrestrial
and Marine)
·
Section
10: Fisheries
·
Section
11: Landscape and Visual Impact
·
Section
12: Impact of Cultural Heritage
·
Section
13: Hazard to Life
·
Section
14: Landfill Gas Hazard
·
Section
15: Electric and Magnetic Fields