1.1 Project Background
1.2 Objectives of the EIA Study
1.3 Consideration of Environmental Impact Assessment Ordinance
2.1 Site Location and Study Area
2.2 Project Requirements, Scope and Benefits
2.3 Works Programme
2.4 Related Projects
2.5 Interrelationship between the WDII, CRIII and CWB&IECL
Projects
3.1 Introduction
3.2 Air Quality Impacts
3.3 Noise Impacts
3.4 Hydrodynamics, Water and Sediment Quality Impacts
3.5 Waste Management
3.6 Land Contamination
3.7 Terrestrial Ecology
3.8 Marine Ecology
3.9 Landscape and Visual Impacts
3.10 Biogas
3.11 Environmental Monitoring and Audit
3.12 Environmental Benefits, Designs, Key Protection Measures and
Enhancements
LIST OF FIGURES
Figure
1 Site Plan
Figure
2 Designated
Projects
Figure 3 Road Layout & Land Use Proposals (Sheet 1 of 2)
Figure 4 Road Layout & Land Use Proposals (Sheet 2 of 2)
Figure 5 Reclamation Stages
Figure 6 Interrelationship between CRIII, WDII and CWB&IECL Projects
Figure 7 Locations of Key Sensitive Receivers for Air, Noise and Water
Figure 8 Master Landscape Plan