Site Map

Road maintenance and repairing works are usually required to be carried out at the less busy night hours to avoid causing serious interruption to heavily trafficked roads during daytime. Quieter equipment or methods for night-time works are needed to minimise the construction noise impact.

The data show that the sound pressure level of noise generated using quieter equipment and methods is significantly lower than that of using traditional equipment and methods

 

Noise reduction for some mitigation measures for reference.

Noise reduction

Mitigation Measures

Noise enclosure for underground construction works

Use of acoustic enclosure for stationary plant can achieve a noise reduction up to 20dB(A) easily.

(Wilson Acoustic) Noise barrier

An effective way of reducing noise is to install a purpose-built barrier between the noisy equipment and the noise sensitive receiver.