Environmental Impact Assessment Ordinance

EP-482/2013/A - Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

disclaimers
  copyright

Condition No.

Document Title

2.7

DocumentAPS Commissioning Test Plan

2.8

DocumentAPS Commissioning Test Report

2.9

DocumentAir Quality Monitoring Plan

2.12

DocumentAs built drawings of noise and visual mitigation measures for Slip Road 8

2.12

DocumentAs-built Drawings of Noise and Visual Mitigation Measures

2.7

DocumentSubmission of Revised Air Purification System (APS) Commissioning Test Plan

2.8

DocumentPartial Submission of revised Air Purification System (APS) Commissioning Test Report

2.9

DocumentInvestigation Report for Breakdown of Tunnel Ventilation System at East Ventilation Building

2.8

DocumentRevised Air Purification System (APS) Commissioning Test Report - 2nd Stage

Last revision date: xxx