Application No. |
Environmental Impact Assessment Report |
Applicant |
Status |
EIA-309/2024 |
Development of Tseung Kwan O Area 137 and Associated Reclamation Sites |
Civil Engineering and Development Department |
Under Consideration |
EIA-308/2024 |
Provision of Crematorium at Wo Hop Shek Cemetery |
Food and Environmental Hygiene Department |
- Applicant was informed on 21 October 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2024 to 23 Nov 2024.
|
EIA-307/2024 |
Development of Integrated Waste Management Facilities Phase 2 (I·PARK2) |
Waste Infrastructure Division of Environmental Protection Department |
- Applicant was informed on 10 September 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Sep 2024 to 11 Oct 2024.
|
EIA-306/2024 |
Proposed Comprehensive Development with Wetland Enhancement (CDWE) at Nam Sang Wai and Lut Chau |
Nam Sang Wai Development Company Limited |
- Application was withdrawn by applicant on 17 Sep 2024.
|
EIA-305/2024 |
Engineering and Technical Feasibility Study for Proposed Extension of Yuen Long Industrial Estate |
Hong Kong Science and Technology Parks Corporation |
- Application was withdrawn by applicant on 10 Jul 2024.
|
EIA-304/2024 |
Ngau Tam Mei Water Treatment Works Extension |
Water Supplies Department |
- Applicant was informed on 19 July 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jul 2024 to 28 Aug 2024.
- Approved without conditions on 26 Sep 2024.
|
EIA-303/2023 |
Construction of Annex Block at Hong Kong Observatory Headquarters, Tsim Sha Tsui |
Hong Kong Observatory |
- Applicant was informed on 19 January 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Jan 2024 to 22 Feb 2024.
- Approved without conditions on 19 Mar 2024.
|
EIA-302/2023 |
San Tin / Lok Ma Chau Development Node |
Civil Engineering and Development Department |
- Applicant was informed on 30 Jan 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 Feb 2024 to 2 Mar 2024.
- Approved with conditions on 17 May 2024.
|
EIA-301/2023 |
Northern Link |
MTR Corporation Limited |
- Applicant was informed on 24 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Dec 2023 to 11 Jan 2024.
- Approved with conditions on 9 Feb 2024.
|
EIA-300/2023 |
Widening of Yuen Long Highway (Section between Lam Tei and Tong Yan San Tsuen) |
Highways Department |
- Applicant was informed on 20 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Nov 2023 to 29 Dec 2023.
- Approved without conditions on 25 Jan 2024.
|
EIA-299/2023 |
Improvement to So Kwun Po Interchange |
Civil Engineering and Development Department |
- Applicant was informed on 9 October 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Oct 2023 to 15 Nov 2023.
- Approved without conditions on 14 Dec 2023.
|
EIA-298/2023 |
Tuen Mun Bypass |
Highways Department |
- Applicant was informed on 22 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Oct 2023 to 4 Nov 2023.
- Approved without conditions on 1 Dec 2023.
|
EIA-297/2023 |
Route 11 (Section between Yuen Long and North Lantau) |
Highways Department |
- Applicant was informed on 15 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Sep 2023 to 28 Oct 2023.
- Approved without conditions on 24 Nov 2023.
|
EIA-296/2023 |
Widening of Tsuen Wan Road and the associated junction improvement works |
Highways Department |
- Applicant was informed on 24 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2023 to 28 Sep 2023.
- Approved without conditions on 25 Oct 2023.
|
EIA-295/2023 |
Airport Tung Chung Link Project |
Airport Authority Hong Kong |
- Applicant was informed on 21 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Aug 2023 to 29 Sep 2023.
Approved with conditions on 26 Oct 2023.
|
EIA-294/2023 |
Drainage Improvement Works in Mui Wo |
Drainage Services Department |
- Applicant was informed on 13 Jun 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jun 2023 to 29 Jul 2023.
Approved without conditions on 22 Aug 2023.
|
EIA-293/2023 |
Traffic Improvement Scheme in Tuen Mun - Widening and Addition of Slip roads at Lung Fu Road / Tuen Mun Road / Wong Chu Road / Hoi Wing Road |
Highways Department |
- Applicant was informed on 12 May 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 May 2023 to 16 Jun 2023.
Approved without conditions on 23 June 2023.
|
EIA-292/2022 |
Revitalisation of Tai Wai Nullah |
Drainage Services Department |
- Applicant was informed on 15 Feb 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Feb 2023 to 22 Mar 2023.
Approved without conditions on 19 Apr 2023.
|
EIA-291/2022 |
Establishment of Fish Culture Zone at Po Toi (Southeast) |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on 16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
EIA-290/2022 |
Establishment of Fish Culture Zone at Mirs Bay |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on 16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023. |
EIA-289/2022 |
Establishment of Fish Culture Zone at Outer Tap Mun |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on 16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023. |
EIA-288/2022 |
Establishment of Fish Culture Zone at Wong Chuk Kok Hoi |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on 16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
EIA-287/2022 |
Revitalisation of Fo Tan Nullah |
Drainage Services Department |
- Applicant was informed on 3 Oct 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Oct 2022 to 9 Nov 2022.
Approved without conditions on 25 Nov 2022. |
EIA-286/2022 |
Upgrading of Tai Po Sewage Treatment Works |
Drainage Services Department |
- Applicant was informed on 15 Sep 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Sep 2022 to 22 Oct 2022.
Approved without conditions on 5 Dec 2022. |
EIA-285/2022 |
Improvement of Lion Rock Tunnel |
Highways Department |
- Applicant was informed on 5 Aug 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Aug 2022 to 13 Sep 2022.
Approved with conditions on 15 Nov 2022. |
EIA-284/2022 |
New Contaminated Sediment Disposal Facility to the West of Lamma Island |
Civil Engineering and Development Department |
- Applicant was informed on 27 Jul 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Aug 2022 to 24 Sep 2022.
Approved without conditions on 21 Oct 2022. |
EIA-283/2022 |
Drainage Improvement Works in Ta Kwu Ling |
Drainage Services Department |
- Applicant was informed on 20 Jun 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jun 2022 to 26 Jul 2022.
Approved without conditions on 10 Aug 2022. |
EIA-282/2022 |
Technical Study on Partial Development of Fanling Golf Course Site – Feasibility Study |
Civil Engineering and Development Department |
- Applicant was informed on 17 May 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 May 2022 to 18 Jun 2022.
- DEP requested for information under section 8(1) of the Ordinance on 31 Aug 2022. [PDF]
- Additional information submitted under section 8.(1) of the Ordinance
[PDF]
- Approved with conditions on 11 May 2023.
|
EIA-281/2022 |
Hung Shui Kiu Effluent Polishing Plant |
Drainage Services Department |
- Applicant was informed on 1 Jun 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jun 2022 to 14 Jul 2022.
Approved with conditions on 19 Oct 2022. |
EIA-280/2022 |
Cycle Track between Tsuen Wan and Tuen Mun (Tuen Mun to So Kwun Wat) |
Civil Engineering and Development Department |
- Applicant was informed on 4 May 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 May 2022 to 18 Jun 2022.
Approved with conditions on 31 Aug 2022. |
EIA-279/2022 |
Tuen Mun South Extension |
MTR Corporation Limited |
- Applicant was informed on 26 Apr 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2022 to 15 Jun 2022.
Approved without conditions on 12 Jul 2022. |
EIA-278/2022 |
Yuen Long South Effluent Polishing Plant |
Drainage Services Department |
- Applicant was informed on 25 Mar 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Apr 2022 to 5 May 2022.
Approved with conditions on 25 Jul 2022. |
EIA-277/2021 |
Tung Chung Line Extension |
MTR Corporation Limited |
- Applicant was informed on 24 Jan 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Feb 2022 to 11 Mar 2022 and 23 Mar 2022 to 1 Apr 2022.
Approved with conditions on 12 Jul 2022. |
EIA-276/2021 |
Re-provision of Open Cycle Gas Turbines at Lamma Power Station |
The Hong Kong Electric Company Limited |
- Applicant was informed on 10 Dec 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Dec 2021 to 19 Jan 2022.
Approved without conditions on 1 Apr 2022. |
EIA-275/2021 |
Cycle Track between Tsuen Wan and Tuen Mun (Tuen Mun to So Kwun Wat) |
Civil Engineering and Development Department |
- Application was withdrawn by applicant on 13 Dec 2021.
|
EIA-274/2021 |
Mai Po Nature Reserve Infrastructure Upgrade Project |
World Wide Fund For Nature Hong Kong |
- Applicant was informed on 2 Nov 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2021 to 18 Dec 2021.
Approved with conditions on 16 Feb 2022. |
EIA-273/2021 |
Revised Trunk Road T4 in Sha Tin |
Civil Engineering and Development Department |
- Applicant was informed on 26 Aug 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sep 2021 to 9 Oct 2021.
Approved without conditions on 8 Nov 2021. |
EIA-272/2021 |
Improvement of Lion Rock Tunnel |
Highways Department |
- Application was withdrawn by applicant on 26 Aug 2021.
|
EIA-271/2021 |
Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns |
Water Supplies Department |
- Applicant was informed on 13 Jul 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jul 2021 to 25 Aug 2021.
Approved without conditions on 16 Nov 2021. |
EIA-270/2021 |
Sai O Trunk Sewer Sewage Pumping Station |
Drainage Services Department |
- Applicant was informed on 31 Mar 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Apr 2021 to 19 May 2021.
Approved without conditions on 4 June 2021. |
EIA-269/2021 |
Yuen Long Barrage Scheme |
Drainage Services Department |
- Applicant was informed on 16 Mar 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2021 to 27 Apr 2021.
Approved without conditions on 24 May 2021. |
EIA-268/2020 |
Drainage Improvement Works Near Four Villages in Yuen Long - Sung Shan New Village, Tai Wo, Lin Fa Tei and Ha Che |
Drainage Services Department |
- Applicant was informed on 21 Jan 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Feb 2021 to 23 Mar 2021.
Approved with conditions on 3 June 2021. |
EIA-267/2020 |
Revised Austin Road Flyover |
West Kowloon Cultural District Authority |
- Applicant was informed on 14 Dec 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Dec 2020 to 21 Jan 2021.
- Application was withdrawn by applicant on 27 Jul 2023.
|
EIA-266/2020 |
A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area |
Hospital Authority |
- Applicant was informed on 20 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Oct 2020 to 26 Nov 2020.
Approved without conditions on 17 Dec 2020. |
EIA-265/2020 |
Pier Improvement at Tung Ping Chau |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020.
Approved with conditions on 29 December 2020. |
EIA-264/2020 |
Pier Improvement at Lai Chi Wo |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020.
Approved with conditions on 29 December 2020. |
EIA-263/2020 |
Development at San Hing Road and Hong Po Road, Tuen Mun |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Oct 2020 to 21 Nov 2020.
Approved with conditions on 30 December 2020. |
EIA-262/2020 |
Improvement of Yuen Long Town Nullah (Town Centre Section) |
Drainage Services Department |
- Applicant was informed on 7 Apr 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Apr 2020 to 21 May 2020.
Approved with conditions on 31 July 2020.
|
EIA-261/2019 |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road |
Highways Department |
- Applicant was informed on 31 Jan 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Feb 2020 to 14 Mar 2020.
Approved with conditions on 27 May 2020.
|
EIA-260/2019 |
Shuen Wan Golf Course |
Sha Lo Tung Development Company Limited |
- Applicant was informed on 28 Mar 2019 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Apr 2019 to 3 May 2019.
Approved with conditions on 5 Jul 2019.
|
EIA-259/2018 |
Yuen Long Effluent Polishing Plant |
Drainage Services Department |
- Applicant was informed on 19 Feb 2019 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Feb 2019 to 29 Mar 2019.
Approved with conditions on 25 Apr 2019. |
EIA-258/2018 |
Lei Yue Mun Waterfront Enhancement Project |
Civil Engineering and Development Department |
- Applicant was informed on 17 July 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jul 2018 to 25 Aug 2018.
Approved with conditions on 26 Oct 2018. |
EIA-257/2018 |
Intermodal Transfer Terminal - Bonded Vehicular Bridge and Associated Roads |
Airport Authority Hong Kong |
- Applicant was informed on 9 July 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Jul 2018 to 11 Aug 2018.
Approved without conditions on 23 August 2018. |
EIA-256/2018 |
Hong Kong Offshore LNG Terminal |
CLP Power Hong Kong Limited |
- Applicant was informed on 13 Jun 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jun 2018 to 14 Jul 2018.
Approved with conditions on 5 Oct 2018. |
EIA-255/2018 |
Proposed Interim Sewage Treatment Plant and Effluent Reuse Facility at Wo Shang Wai, Yuen Long |
Profit Point Enterprises Limited |
- Applicant was informed on 6 July 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Jul 2018 to 18 Aug 2018.
Approved without conditions on 3 Sep 2018. |
EIA-254/2017 |
Housing Sites in Yuen Long South |
Civil Engineering and Development Department |
- Applicant was informed on 27 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Aug 2017 to 6 Sep 2017.
Approved with conditions on 30 Nov 2017. |
EIA-253/2017 |
Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017. |
EIA-252/2017 |
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017. |
EIA-251/2017 |
Improvement Dredging for Lamma Power Station Navigation Channel |
The Hong Kong Electric Company Limited |
- Applicant was informed on 24 May 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 9 Jun 2017 to 8 Jul 2017.
Approved with conditions on 10 Oct 2017. |
EIA-250/2017 |
Mui Wo Lai Chi Yuen Cemetery Extension |
Food and Environmental Hygiene Department |
- Applicant was informed on 24 Mar 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Apr 2017 to 17 May 2017.
Approved without conditions on 15 Jun 2017. |
EIA-249/2016 |
A Rooftop Helipad at the Proposed New Block of Queen Mary Hospital |
Food and Health Bureau |
- Applicant was informed on 18 Jan 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Feb 2017 to 4 Mar 2017.
Approved without conditions on 22 Mar 2017. |
EIA-248/2016 |
Hung Shui Kiu New Development Area |
Civil Engineering and Development Department |
|
EIA-247/2016 |
Kai Tak Multi-purpose Sports Complex |
Architectural Services Department |
|
EIA-246/2016 |
Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works |
Drainage Services Department |
- Applicant was informed on
25 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Nov 2016 to 17 Dec 2016.
- Approved with condition on 24 Apr 2017. |
EIA-245/2016 |
Expansion of Sha Tau Kok Sewage Treatment Works |
Drainage Services Department |
|
EIA-244/2016 |
Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O |
Drainage Services Department |
|
EIA-243/2016 |
Outlying Islands Sewerage Stage 2 - Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
- Applicant was informed on 19 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2016 to 28 Dec 2016.
- Approved with condition on 29 Mar 2017. |
EIA-242/2016 |
Proposed Low-rise and Low-density Residential Development at Various Lots and their Adjoining Government Land in D.D. 104, East of Kam Pok Road, Mai Po, Yuen Long. N.T. |
Glory Queen Limited |
|
EIA-241/2016 |
Elevated Pedestrian Corridor in Yuen Long Town Connecting with Long Ping Station |
Highways Department |
|
EIA-240/2016 |
Sha Tin Cavern Sewage Treatment Works |
Drainage Services Department |
|
EIA-239/2016 |
Police Facilities in Kong Nga Po |
Civil Engineering and Development Department |
|
EIA-238/2016 |
New Wang Tong River Bridge |
Highways Department |
|
EIA-237/2016 |
Additional Gas-fired Generation Units Project |
Castle Peak Power Company Limited |
|
EIA-236/2016 |
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery |
Civil Engineering and Development Department |
|
EIA-235/2015 |
Development of Anderson Road Quarry site - Road Improvement Works |
Civil Engineering and Development Department |
|
EIA-234/2015 |
Development of Anderson Road Quarry site - Rock Cavern Developments |
Civil Engineering and Development Department |
|
EIA-233/2015 |
Tung Chung New Town Extension |
Civil Engineering and Development Department |
|
EIA-232/2015 |
Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project |
Dragages Hong Kong Ltd. |
|
EIA-231/2015 |
Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project |
Dragages Hong Kong Ltd. |
- Application was withdrawn by applicant on 4 Aug 2015.
|
EIA-230/2015 |
Chai Wan Government Complex and Vehicle Depot |
Hong Kong Police Force |
|
EIA-229/2015 |
Desalination Plant at Tseung Kwan O |
Water Supplies Department |
|
EIA-228/2015 |
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road |
Civil Engineering and Development Department |
|
EIA-227/2015 |
Comprehensive Development and Wetland Protection near Yau Mei San Tsuen |
Asia King Development Limited |
|
EIA-226/2014 |
Alternative Ground Decontamination Works at the Proposed Kennedy Town Comprehensive Development Area Site |
Civil Engineering and Development Department |
|
EIA-225/2014 |
Decommissioning of West Portion of The Middle ASH Lagoon at Tsang Tsui, Tuen Mun |
Food and Environmental Hygiene Department |
|
EIA-224/2014 |
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works |
Water Supplies Department |
|
EIA-223/2014 |
Expansion of Hong Kong International Airport into a Three-Runway System |
Airport Authority Hong Kong |
|
EIA-222/2014 |
Development of Anderson Road Quarry |
Civil Engineering and Development Department |
|
EIA-221/2014 |
Tai Shue Wan Development at Ocean Park |
Ocean Park Corporation |
|
EIA-220/2014 |
Proposed Residential Cum Passive Recreation Development within "Recreation" Zone and "Residential (Group C)" Zone at Various Lots in DD 104, Yuen Long, N.T. |
Capital Chance Ltd |
|
EIA-219/2013 |
Outlying Island Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
|
EIA-218/2013 |
Development of Organic Waste Treatment Facilities, Phase 2 |
Environmental Protection Department |
|
EIA-217/2013 |
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1 |
Highways Department |
|
EIA-216/2013 |
Reprovisioning of FEHD Sai Yee Street Environmental Hygiene Offices-cum-vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area |
Food and Environmental Hygiene Department |
|
EIA-215/2013 |
West Kowloon Cultural District |
West Kowloon Cultural District Authority |
|
EIA-214/2013 |
Trunk Road T2 |
Civil Engineering and Development Department |
|
EIA-213/2013 |
North East New Territories New Development Areas |
New Territories North and West Development Office, Civil Engineering and Development Department |
|
EIA-212/2013 |
Development of Lok Ma Chau Loop |
Civil Engineering and Development Department |
|
EIA-211/2013 |
Outlying Islands Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
- Application was withdrawn by applicant on 26 Apr 2013.
|
EIA-210/2013 |
Tseung Kwan O – Lam Tin Tunnel and Associated Works |
Civil Engineering and Development Department |
|
EIA-209/2013 |
Cross Bay Link, Tseung Kwan O |
Civil Engineering and Development Department |
|
EIA-208/2013 |
Central Kowloon Route |
Major Works Project Management Office,
Highways Department |
|
EIA-207/2012 |
Kai Tak Development – Roads D3A & D4A |
Civil Engineering and Development Department |
|
EIA-206/2012 |
Drainage Improvement Works at Ngong Ping |
Drainage Services Department |
|
EIA-205/2012 |
Construction of Cycle Tracks and the associated Supporting Facilities at Nam Sang Wai, Yuen Long |
New Territories North and West Development Office, Civil Engineering and Development Department |
- Application was withdrawn by applicant on 1 Apr 2016.
|
EIA-204/2012 |
Construction of Cycle Tracks and the associated Supporting Facilities at Nam Sang Wai, Yuen Long |
New Territories North and West Development Office, Civil Engineering and Development Department |
- Application was withdrawn by applicant on 21 Nov 2012.
|
EIA-203/2012 |
Pilot Project for Public - Private Partnership Conservation Scheme, Sha Lo Tung Valley, Tai Po |
Sha Lo Tung Development Company Ltd |
- Application was withdrawn by applicant on 19 Jan 2017.
|
EIA-202/2012 |
EMSD Hong Kong Workshop at Sheung On Street, Chai Wan |
EMSD |
|
EIA-201/2011 |
Development of the Integrated Waste Management Facilities Phase 1 |
Environmental Protection Department |
|
EIA-200/2011 |
Shatin to Central Link - Tai Wai to Hung Hom Section |
MTR Corporation Limited |
|
EIA-199/2011 |
Shatin to Central Link - Hung Hom to Admiralty Section |
MTR Corporation Limited |
|
EIA-198/2011 |
Shatin to Central Link - Mong Kok East to Hung Hom Section |
MTR Corporation Limited |
|
EIA-197/2011 |
Shatin to Central Link - Stabling Sidings at Hung Hom Freight Yard |
MTR Corporation Limited |
|
EIA-196/2011 |
Shatin to Central Link - Hung Hom to Admiralty Section |
MTR Corporation Limited |
- Application was withdrawn by applicant on 21 Apr 2011.
|
EIA-195/2011 |
Shatin to Central Link - Mong Kok East to Hung Hom Section |
MTR Corporation Limited |
- Application was withdrawn by applicant on 21 Apr 2011.
|
EIA-194/2011 |
Shatin to Central Link - Tai Wai to Hung Hom Section |
MTR Corporation Limited |
- Application was withdrawn by applicant on 21 Apr 2011.
|
EIA-193/2011 |
Development of the Integrated Waste Management Facilities Phase 1 |
Environmental Protection Department |
- Applicant was informed on 9 Feb 2011 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 11 May 2011.
|
EIA-192/2010 |
Pilot Project for Public - Private Partnership Conservation Scheme, Sha Lo Tung Valley, Tai Po |
Sha Lo Tung Development Company Ltd |
- Applicant was informed on 24 Feb 2011 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 16 May 2011.
|
EIA-191/2010 |
Central Police Station Conservation and Revitalisation Project |
The Jockey Club CPS Limited |
- Applicant was informed on 17 Jan 2011 of the suitability of the report for public inspection.
|
EIA-190/2010 |
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works |
Civil Engineering and Development Department |
- Applicant was informed on 15 Dec 2010 of the suitability of the report for public inspection.
|
EIA-189/2010 |
Regulation of Shenzhen River Stage IV |
Drainage Services Department |
- Applicant was informed on 14 Dec 2010 of the suitability of the report for public inspection.
|
EIA-188/2010 |
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp |
The Hong Kong Federation of Youth Groups |
- Applicant was informed on 26 Oct 2010 of the suitability of the report for public inspection.
|
EIA-187/2010 |
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter |
MTR Corporation Limited |
- Applicant was informed on 24 Nov 2010 of the suitability of the report for public inspection.
|
EIA-186/2010 |
Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works |
Water Supplies Department |
- Applicant was informed on 24 Nov 2010 of the suitability of the report for public inspection.
|
EIA-185/2010 |
South Island Line (East) |
MTR Corporation Limited |
- Applicant was informed on 4 Aug 2010 of the suitability of the report for public inspection.
|
EIA-184/2010 |
Kwun Tong Line Extension |
MTR Corporation Limited |
- Applicant was informed on 24 Jun 2010 of the suitability of the report for public inspection.
|
EIA-183/2010 |
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel |
Civil Engineering and Development Department |
- Applicant was informed on 23 Jun 2010 of the suitability of the report for public inspection.
|
EIA-182/2010 |
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development |
The Hong Kong and China Gas Company Limited
|
- Applicant was informed on 14 June 2010 of the suitability of the report for public inspection.
|
EIA-181/2010 |
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel |
Civil Engineering and Development Department |
- Application was withdrawn by applicant on 16 Apr 2010.
|
EIA-180/2010 |
Improvement of Fresh Water Supply to Cheung Chau |
Water Supplies Department |
- Applicant was informed on 16 March 2010 of the suitability of the report for public inspection.
|
EIA-179/2010 |
South Island Line (East) |
MTR Corporation Limited |
- Application was withdrawn by applicant on 25 Feb 2010.
|
EIA-178/2009 |
Black Point Gas Supply Project |
Castle Peak Power Co. Ltd. |
- Applicant was informed on 10 February 2010 of the suitability of the report for public inspection.
|
EIA-177/2009 |
Development of a 100MW Offshore Wind Farm in Hong Kong |
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 26 January 2010 of the suitability of the report for public inspection.
|
EIA-176/2009 |
Organic Waste Treatment Facilities, Phase I |
Environmental Protection Department |
- Applicant was informed on 23 December 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2009 to 27 Jan 2010.
- Approved with conditions
on 24 Feb 2010.
|
EIA-175/2009 |
Road Works at West Kowloon |
MTR Corporation Limited |
- Applicant was informed on 14 August 2009 of the suitability of the report for public inspection.
- Approved with conditions
on 23 Sep 2009.
|
EIA-174/2009 |
Tuen Mun - Chek Lap Kok Link |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
EIA-173/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
EIA-172/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
EIA-171/2009 |
West New Territories (WENT) Landfill Extension |
Environmental Protection Department |
- Applicant was informed on 5 August 2009 of the suitability of the report for public inspection.
EIA-170/2009 |
Provision of a Poultry Slaughtering Centre in Sheung Shui |
Architectural Services Department |
- Applicant was informed on 17 July 2009 of the suitability of the report for public inspection.
EIA-169/2009 |
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link |
MTR Corporation Limited |
- Applicant was informed on 15 July 2009 of the suitability of the report for public inspection.
|
|
EIA-168/2009 |
Road Works at West Kowloon |
MTR Corporation Limited |
- Application was withdrawn by applicant on 17 July 2009.
|
EIA-167/2009 |
Hong Kong Offshore Wind Farm in Southeastern Waters |
HK Offshore Wind Limited |
- Applicant was informed on 22 May 2009 of the suitability of the report for public inspection.
|
|
EIA-166/2009 |
Decommissioning of the Co-Combustion Pilot Plant at Tap Shek Kok |
Green Island Cement Company Limited |
- Applicant was informed on 4 May 2009 of the suitability of the report for public inspection.
|
|
EIA-165/2009 |
Phased Reprovisioning of Cape Collinson Crematorium |
Food and Environmental Hygiene Department |
- Applicant was informed on 20 Apr 2009 of the suitability of the report for public inspection.
|
|
EIA-164/2009 |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road |
Highways Department |
- Applicant was informed on 28 Apr 2009 of the suitability of the report for public inspection.
|
|
EIA-163/2008 |
Hang Hau Tsuen Channel at Lau Fau Shan |
New Territories North and West Development Office, Civil Engineering and Development Department |
- Applicant was informed on 3 Feb 2009 of the suitability of the report for public inspection.
|
EIA-162/2008 |
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir |
Water Supplies Department |
- Applicant was informed on 6 Feb 2009 of the suitability of the report for public inspection.
|
EIA-161/2008 |
Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road |
Secretary for Security |
- Applicant was informed on 23 Jan 2009 of the suitability of the report for public inspection.
|
EIA-160/2008 |
Improvement to Pok Oi Interchange |
Highways Department |
- Applicant was informed on 13 Jan 2009 of the suitability of the report for public inspection.
|
EIA-159/2008 |
Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River |
Civil Engineering and Development Department |
- Applicant was informed on 2 Jan 2009 of the suitability of the report for public inspection.
|
EIA-158/2008 |
Traffic Improvements to Tuen Mun Road Town Centre Section |
Highways Department |
- Applicant was informed on 12 Dec 2008 of the suitability of the report for public inspection.
|
EIA-157/2008 |
Kai Tak Development |
Civil Engineering and Development Department |
- Applicant was informed on 26 Nov 2008 of the suitability of the report for public inspection.
|
EIA-156/2008 |
Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate |
ASB Biodiesel (Hong Kong) Limited |
- Applicant was informed on 3 Dec 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009.
- Approved without conditions on 26 Feb 2009.
|
EIA-155/2008 |
Sludge Treatment Facilities |
Environmental Protection Department |
- Applicant was informed on 28 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009.
- Approved with conditions
on 19 Feb 2009.
|
EIA-154/2008 |
Tsim Sha Tsui Station Northern Subway |
MTR Corporation Limited |
- Applicant was informed on 10 Nov 2008 of the suitability of the report for public inspection.
|
EIA-153/2008 |
West Island Line |
MTR Corporation Limited |
- Applicant was informed on 30 Sep 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Oct 2008 to 12 Nov 2008.
|
EIA-152/2008 |
Tsuen Wan Bypass, widening of Tsuen Wan Road between Tsuen Tsing Interchange and Kwai Tsing Interchange, and associated junction improvement works |
Civil Engineering and Development Department |
- Applicant was informed on 30 Sep 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Oct 2008 to 11 Nov 2008.
- Approved without conditions on 8 Dec 2008. |
EIA-151/2008 |
Kai Tak Development |
Civil Engineering and Development Department |
- Application was withdrawn by applicant on 21 Aug 2008.
|
EIA-150/2008 |
Tuen Mun Area 54 Sewage Pumping Station |
Land Works Division, Civil Engineering Office, Civil Engineering and Development Department |
- Applicant was informed on 19 Aug 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Sep 2008 to 18 Oct 2008.
- Approved without conditions on 12 Nov 2008.
|
EIA-149/2008 |
Proposed
Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in D.D.123 |
Mutual Luck
Investment Limited |
- Applicant was informed on 14 July 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Aug 2008 to 6 Sep 2008.
- Approved with conditions
on 27 Nov 2009.
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A |
Drainage Services Department |
- Applicant was informed on 18 June 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Aug 2008 to 10 Sep 2008.
- Approved without conditions on 30 Oct 2008.
|
EIA-147/2008 |
West Island Line |
MTR Corporation Limited |
- Applicant was informed on 7 May 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 May 2008 to 14 Jun 2008.
- Application was withdrawn by applicant on 19 Jun 2008.
|
EIA-146/2008 |
Provision of Cremators at Wo Hop Shek Crematorium |
Food and Environmental
Hygiene Department |
- Applicant was informed on 9 Apr 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 May 2008 to 31 May 2008.
- Approved without conditions on 24 Jun 2008.
|
EIA-145/2008 |
Upgrading of Pillar Point Sewage Treatment Works |
Drainage Services Department |
- Applicant was informed on 3 Apr 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
- Approved without conditions on 10 Jun 2008.
|
EIA-144/2008 |
Proposed
Comprehensive Development at Wo Shang Wai, Yuen Long |
Profit Point Enterprises Limited
|
- Applicant was informed on 26 Mar 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
- Approved with conditions
on 31 Jul 2008.
|
EIA-143/2007 |
South East New Territories
(SENT)
Landfill Extension |
Environmental Protection Department |
- Applicant was informed on 31 Jan 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Feb 2008 to 26 Mar 2008.
- Approved with conditions
on 6 May 2008.
|
EIA-142/2007 |
Provision of
Additional Interchange connecting Tuen Mun Road and Castle Peak Road near Sam
Shing Estate and Widening of Tuen Mun Road at Tsing Tin Interchange |
Highways Department |
- Applicant was informed on
11 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Dec 2007 to 12 Jan 2008.
- Approved without conditions on 23 Jan 2008.
|
EIA-141/2007 |
Wan Chai Development Phase II and Central-Wan Chai Bypass |
Civil Engineering and Development Department
|
- Applicant was informed on 17 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Dec 2007 to 18 Jan 2008.
- Approved with conditions
on 11 Dec 2008.
|
EIA-140/2007 |
Development of a Bathing Beach at Lung Mei, Tai Po |
Civil Engineering and Development Department
|
- Applicant was informed on 12 Nov 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2007 to 22 Dec 2007.
- Approved with conditions
on 21 Nov 2008.
|
EIA-139/2007 |
Decommissioning of the Former Kai Tak Airport Other than the North Apron |
Civil Engineering and Development Department
|
- Applicant was informed on 12 Oct 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov 2007.
- Approved with conditions
on 19 Dec 2007.
|
EIA-138/2007 |
Dredging Works for Proposed Cruise Terminal at Kai Tak |
Civil Engineering and Development Department
|
- Applicant was informed on 12 Oct 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov 2007.
- Approved without conditions on 19 Dec 2007.
|
EIA-137/2007 |
Development of a Bathing Beach at Lung Mei, Tai Po |
Civil Engineering and Development Department
|
- Application was withdrawn by
applicant on 17 Sep 2007. |
EIA-136/2007 |
Proposed
Comprehensive Development at Wo Shang Wai, Yuen Long |
Profit Point Enterprises Limited
|
- Application was withdrawn by
applicant on 8 Aug 2007. |
EIA-135/2007 |
Landslide Preventive Works at Po
Shan, Mid-levels - Natural Terrain Risk Mitigation Measures |
Geotechnical Engineering Office,
Civil Engineering and Development Department |
- Applicant was informed on
15 Aug 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Aug 2007 to 26 Sep 2007.
- Approved with conditions
on 22 Oct 2007. |
EIA-134/2007 |
Harbour Area Treatment Scheme (HATS)
- Provision of Disinfection Facilities at Stonecutters Island Sewage Treatment
Works |
Drainage Services Department |
- Applicant was informed on 19 Jul 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2007 to 14 Sep 2007.
- Approved with conditions
on 8 Nov 2007. |
EIA-133/2007 |
North East New Territories (NENT)
Landfill Extension |
Environmental Protection Department |
- Applicant was informed on 1 Jun 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jun 2007 to 24 Jul 200 7.
- Approved with conditions
on 20 Sep 2007. |
EIA-132/2007 |
Proposed
Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in D.D.123 |
Mutual Luck
Investment Limited |
- Application was withdrawn by
applicant on 30 May 2007.
|
EIA-131/2007 |
Laying of
Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai
Ying Pun |
Water Supplies Department |
- Applicant was informed on 25 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Jun 2007 to 3 Jul 2007.
- Approved without conditions on 31 Jul 2007. |
EIA-130/2007 |
Drainage
Improvement in Sha Tin and Tai Po |
Drainage Services Department |
- Applicant was informed on 8 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2007 to 15 Jun 2007.
- Approved with conditions
on 9 Aug 2007. |
EIA-129/2007 |
Northeast New Territories (NENT)
Landfill Extension |
Environmental Protection Department |
- Application was withdrawn by
applicant on 4 May 2007.
|
EIA-128/2007 |
Drainage Improvement in Northern
New Territories - Package C |
Drainage Services Department |
- Applicant was informed on 25 Apr 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 May 2007 to 1 Jun 2007.
- Approved without conditions on 9 Jul 2007. |
EIA-127/2006 |
Permanent Aviation Fuel Facility for Hong Kong International Airport |
Airport Authority Hong Kong |
- Applicant was informed on 16 Feb 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Feb 2007 to 24 Mar 200 7.
- Approved with conditions
on 30 May 2007. |
EIA-126/2006 |
Relocation of Yiu Lian Floating Dock
No. 3 |
Yiu Lian Dockyards Limited |
- Applicant was informed on 19 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2006 to 27 Jan 200 7.
- Approved with conditions
on 23 Feb 2007.
|
EIA-125/2006 |
Liquefied Natural Gas (LNG) Receiving
Terminal and Associated Facilities |
Castle Peak Power Company Limited |
- Applicant was informed on 15 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Dec 2006 to 25Jan 200 7.
- Approved with conditions
on 3 Apr 2007.
|
EIA-124/2006 |
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau |
Castle Peak Power Company Limited |
- Applicant was informed on 1 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 14 Dec 2006 to 12 Jan 200 7.
- Approved with conditions
on 12 Mar 2007.
|
EIA-123/2006 |
Emissions
Control Project at Castle Peak Power Station "B" Units |
Castle Peak Power Company Limited |
- Applicant was informed on 15 Aug 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 19 Aug 2006 to 17 Sep 2006.
- Approved without conditions on 25 Oct 2006.
|
EIA-122/2006 |
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13 |
Drainage Services Department |
- Applicant was informed on 2 Aug 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 22 Aug 2006 to 20 Sep 2006.
- Approved without conditions on 24 Oct 2006.
|
EIA-121/2006 |
Repositioning and Long Term Operation Plan of Ocean Park |
Ocean Park Corporation |
- Applicant was informed on 29 May 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Jun 2006 to 30 Jun 2006.
- Approved without conditions on 12 Jul 2006.
|
EIA-120/2006 |
Hong Kong Convention and Exhibition Centre, Atrium Link Extension |
Hong Kong Trade Development Council |
- Applicant was informed on 17 Mar 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Mar 2006 to 16 Apr 2006.
- Approved without conditions on 21 Apr 2006. |
EIA-119/2005 |
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project |
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 13 Feb 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2006 to 18 Mar 2006.
- Approved without conditions on 24 Mar 2006. |
EIA-118/2005 |
Main Arena of the 2008 Olympic Equestrian Event |
The Hong Kong Jockey Club |
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006.
- Approved without conditions on 24 Mar 2006. |
EIA-117/2005 |
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13 |
Drainage Services Department
|
- Application was withdrawn by applicant on 6 Feb 2006.
|
EIA-116/2005 |
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun |
HGH Limited
|
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006.
- Approved without conditions on 2 Mar 2006.
|
EIA-115/2005 |
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel |
Drainage Services Department
|
- Applicant was informed on 26 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Feb 2006 to 14 Mar 2006.
- Approved without conditions on 7
Apr 2006.
|
EIA-114/2005 |
Helipad at Yung Shue Wan, Lamma Island |
Civil Engineering and Development Department
|
- Applicant was informed on 14 Nov 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2005 to 22 Dec 2005.
|
EIA-113/2005 |
Expansion of Heliport Facilities at Macau Ferry Terminal |
Civil Aviation Department, the Government of the HKSAR
|
- Applicant was informed on 28 Oct 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Nov 2005 to 30 Nov 2005.
|
EIA-112/2005 |
Proposed Extension of Public Golf Course at Kau Sai Chau Island, Sai Kung |
The Hong Kong Jockey Club
|
- Applicant was informed on 1 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Sep 2005 to 5 Oct 2005.
- Approved without conditions on 14 Nov 2005. |
EIA-111/2005 |
Further Development of Tseung Kwan O Feasibility Study |
Civil Engineering and Development Department
|
- Applicant was informed on 30 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Oct 2005 to 13 Nov 2005.
- Approved without conditions on 8 Dec 2005. |
EIA-110/2005 |
Drainage Improvements in Southern Lantau |
Drainage Services Department
|
- Applicant was informed on 15 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Sep 2005 to 25 Oct 2005.
- Approved without conditions on 5 Dec 2005. |
EIA-109/2005 |
Road P1 Advance Works at Yam O on Lantau Island |
Civil Engineering and Development Department
|
- Applicant was informed on 30 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005.
- Approved without conditions on 6 Sep 2005. |
EIA-108/2005 |
Drainage Improvement in Tsuen Wan, Kwai Chung and Tsing Yi, Tsuen Wan Drainage Tunnel |
Drainage Services Department
|
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 July 2005 to 31 July 2005.
- Approved without conditions on 29 Aug 2005. |
EIA-107/2005 |
Peng Chau Helipad |
Civil Engineering and Development Department
|
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005.
- Approved without conditions on 25 Aug 2005. |
EIA-106/2005 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area |
Civil Engineering and Development Department
|
- Applicant was informed on 19 May 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 May 2005 to 25 June 2005.
- Approved without conditions on 1 Sep 2005. |
EIA-105/2005 |
Tonggu Channel of Shenzhen Port |
Shenzhen Port Tonggu Channel Development Office
|
-Applicant was informed on 20 May 2005 that the report submitted on 24 March 2005 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-104/2005 |
Development of an EcoPark in Tuen Mun Area 38 |
Environmental Protection Department
|
- Applicant was informed on 27 April 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 April 2005 to28 May 2005.
- Approved without conditions on 29 June 2005. |
EIA-103/2004 |
Trunk Road T4 in Sha Tin |
Civil Engineering and Development Department
|
- Applicant was informed on 25 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 March 2005 to 6 April 2005.
- Approved without conditions on 3 May 2005. |
EIA-102/2004 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area |
Civil Engineering and Development Department
|
- Application was withdrawn by applicant on 31 Jan 2005. |
EIA-101/2004 |
Drainage Improvements in Sai Kung |
Drainage Services Department
|
- Applicant was informed on 16 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Mar 2005 to 30 Mar 2005.
- Approved with conditions on 20 Apr2005. |
EIA-100/2004 |
Siu Ho Wan Water Treatment Works Extension |
Water Supplies Department
|
- Applicant was informed on 15 Oct 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2004 to 23 Nov 2004.
- Approved without conditions on 15 Dec 2004. |
EIA-099/2004 |
Renewable Energy by a Wind Turbine System on Lamma Island |
The Hongkong Electric Co. Ltd.
|
- Applicant was informed on 6 Sep 2004 of the suitability of the report for public inspection..
- Report was exhibited for public to comment from 10 Sept 2004 to 09 Oct 2004.
- Approved without conditions on 27 Oct 2004. |
EIA-098/2004 |
Kowloon Southern Link |
Kowloon-Canton Railway Corporation
|
- Applicant was informed on 7 Sep 2004 of the suitability of the report for public inspection..
- Report was exhibited for public to comment from 18 Jan 2005 to 16 Feb 2005.
- Approved with conditions on 30 Mar 2005. |
EIA-097/2004 |
Tai Po Sewage Treatment Works Stage V |
Drainage Services Department
|
- Applicant was informed on 26 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 03 Sept 2004 to 02 Oct 2004.
- Approved without conditions on 28 Oct 2004. |
EIA-096/2004 |
Peng Chau Sewage Treatment Works Upgrade |
Drainage Services Department
|
- Applicant was informed on 24 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Sept 2004 to 30 Sept 2004.
- Approved without conditions on 29 Oct 2004. |
EIA-095/2004 |
Kowloon Southern Link |
Kowloon-Canton Railway Corporation
|
- Superseded by EIA-098/2004
- Application was withdrawn by applicant on 21 April 2004. |
EIA-094/2004 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 2 |
Drainage Services Department
|
- Applicant was informed on 17 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Apr 2004 to 22 May 2004.
- Approved without conditions on 17 Jun 2004. |
EIA-093/2004 |
Improvements to San Tin Interchange |
Highways Department
|
- Applicant was informed on 1 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Mar 2004 to 7 Apr 2004.
- Approved without conditions on 3 May 2004. |
EIA-092/2003 |
Reprovisioning of Diamond Hill Crematorium |
Architectural Services Department
|
- Applicant was informed on 5 Jan 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Jan 2004 to 10 Feb 2004.
- Approved with conditions on 30 Mar 2004. |
EIA-091/2003 |
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities |
Drainage Services Department
|
- Applicant was informed on 23 Jun 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2003 to 20 Sep 2003.
- Approved with conditions on 25 Oct 2003. |
EIA-090/2003 |
Tung Chung - Ngong Ping Cable Car Project |
MTR Corporation Limited
|
- Applicant was informed on 27 Mar 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2003 to 27 Apr 2003.
- Approved with conditions on 09 Jun 2003. |
EIA-089/2003 |
The Proposed Submarine Gas Pipelines from Cheng Tou Jiao Liquefied Natural Gas Receiving Terminal, Shenzhen to Tai Po Gas Production Plant, Hong Kong |
The Hongkong and China Gas Company Limited
|
- Applicant was informed on 27 Feb 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Mar 2003 to 3 Apr 2003.
- Approved without conditions on 23 Apr 2003. |
EIA-088/2002 |
Lamma Power Station Navigation Channel Improvement |
The Hongkong Electric Co., Ltd.
|
- Applicant was informed on 18 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jan 2003 to 23 Feb 2003.
- Approved without conditions on 11 Mar 2003. |
EIA-087/2002 |
Cement Silos addition work in Tai Po Cement Depot |
K.WAH MATERIALS LTD.
|
- Applicant was informed on 14 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Jan 2003 to 15 Feb 2003.
- Approved with conditions on 13 May 2003. |
EIA-086/2002 |
Upgrading and expansion of San Wai Sewage Treatement Works and expansion of Ha Tsuen Pumping Station |
Drainage Services Department
|
- Applicant was informed on 23 Dec 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Feb 2003 to 26 Mar 2003.
- Approved without conditions on 12 May 2003. |
EIA-085/2002 |
Proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun |
Architectural Services Department
|
- Applicant was informed on 30 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2002 to 18 Dec 2002.
- Approved with conditions on 14 Mar 2003. |
EIA-084/2002 |
Lamma Power Station Navigation Channel Improvement |
The Hongkong Electric Co., Ltd.
|
- Application was withdrawn by applicant on 8 October 2002. |
EIA-083/2002 |
Feasibility Study for Housing Development at Whitehead & Lee On in Man On Shan |
Territory Development Department
|
- Applicant was informed on 18 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Oct 2002 to 29 Nov 2002.
- Approved without conditions on 18 Dec 2002. |
EIA-082/2002 |
Shenzhen Western Corridor |
Highways Department
|
- Applicant was informed on 9 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Sep 2002 to 10 Oct 2002.
- Approved with conditions on 4 Nov 2002.
|
EIA-081/2002 |
Construction of Lung Kwu Chau Jetty |
Civil Engineering Department
|
- Applicant was informed on 19 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2002 to 27 Oct 2002.
- Approved with conditions on 1 Nov 2002.
|
EIA-080/2002 |
Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau |
Hong Kong Island & Islands Development Office, Territority Development Department
|
- Applicant was informed on 25 Sep 2002 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 20 December 2002.
|
EIA-079/2002 |
Ngong Ping Sewage Treatment Works and Sewerage |
Drainage Services Department
|
- Applicant was informed on 29 Aug 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Aug 2002 to 28 Sep 2002.
- Approved without conditions on 12 Nov 2002. |
EIA-078/2002 |
Deep Bay Link |
Highways Department
|
- Applicant was informed on 10 Jul 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Jul 2002 to 21 Aug 2002.
- Approved with conditions on 13 Sep 2002. |
EIA-077/2002 |
Permanent Aviation Fuel Facility for Hong Kong International Airport |
Airport Authority Hong Kong
|
The Court of Final Appeal ordered on 17 Jul 2006 that
the decision of the Director made on 2 Aug 2002 approving the EIA report be quashed. |
EIA-076/2002 |
Fill Bank at Tseung Kwan O Area 137 |
Civil Engineering Department |
- Applicant was informed on 8 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 16 May 2002 to 14 Jun 2002.
- Approved without conditions on 27 Jun 2002. |
EIA-075/2002 |
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha |
Highways Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 May 2002 to 12 Jun 2002.
- Approved with conditions on 4 Jul 2002. |
EIA-074/2002 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 1 Packages 1A-1T and 1B-1T - Kam Tin Trunk Sewerage Phase I and II |
Drainage Services Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Jun 2002 to 10 Jul 2002.
- Approved with conditions on 26 Aug 2002. |
EIA-073/2001 |
Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay |
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002.
- Approved with conditions on 8 Apr 2002. |
EIA-072/2001 |
Decommissioning of Cheoy Lee Shipyard at Penny's Bay |
Civil Engineering Department |
- Applicant was informed on 9 Feb 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 21 Feb 2002 to 22 Mar 2002.
- Approved without conditions on 24 April 2002.
|
EIA-071/2001 |
Sheung Shui to Lok Ma Chau Spur Line |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 2 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Jan 2002 to 5 Feb 2002.
- Approved with conditions on 11 Mar 2002. |
EIA-070/2001 |
Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay |
Maunsell Consultants Asia Limited |
- Application was withdrawn by applicant on 30 Nov 2001. |
EIA-069/2001 |
Reclamation of Yau Tong Bay |
Maunsell Consultants Asia Limited |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002.
- Approved with conditions on 8 Apr 2002. |
EIA-068/2001 |
Planning and Engineering Feasibility Study for Sham Tseng Development |
Civil Engineering Department |
- Applicant was informed on 10 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jan 2002 to 23 Feb 2002.
- Approved with conditions on 2 May 2002. |
EIA-067/2001 |
Widening of Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange |
Highways Department |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002.
- Approved with conditions on 22 May 2002. |
EIA-066/2001 |
The Decommissioning of Underground Fuel Tanks at Tsuen Wan No.1 Pumping Station |
Water Supplies Department |
- Applicant was informed on 13 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 22 Dec 2001 to 20 Jan 2002.
- Approved with conditions on 9 Feb 2002. |
EIA-065/2001 |
132 KV Supply Circuit from Pui O via Chi Ma Wan Peninsula via Sea Crossing towards Cheung Chau |
CLP Power Hong Kong Limited |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002.
- Approved with conditions on 28 Feb 2002. |
EIA-064/2001 |
Demolition of Buildings and Structures in the Proposed Kennedy Town Comprehensive Development Area Site |
Civil Engineering Department |
- Applicant was informed on 20 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Dec 2001 to 5 Jan 2002.
- Approved with conditions on 16 Apr 2002. |
EIA-063/2001 |
Replacement of Cremators at Fu Shan Crematorium |
Architectural Services Department |
- Applicant was informed on 9 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 Nov 2001 to 23 Dec 2001.
- Approved with conditions on 4 Jan 2002. |
EIA-062/2001 |
Demolition of Kwai Chung Incineration Plant |
Civil Engineering Department |
- Applicant was informed on 13 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Nov 2001 to 19 Dec 2001.
- Approved with conditions on 9 Jan 2002. |
EIA-061/2001 |
Tseung Kwan O Roads D1, D8 and D10 |
Territory Development Department |
- Applicant was informed on 11 Oct 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 18 Oct 2001 to 16 Nov 2001.
- Approved with conditions on 23 Nov 2001. |
EIA-060/2001 |
Proposed Headquarters and Bus Maintenance Depot in Chai Wan |
Citybus Limited |
- Applicant was informed on 11 Aug 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 16 Aug 2001 to 14 Sep 2001.
- Approved with conditions on 26 Sep 2001. |
EIA-059/2001 |
Comprehensive Feasibility Study for The Revised Scheme of South East Kowloon Development |
Territory Development Department |
- Applicant was informed on 30 Jul 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 31 July 2001 to 29 Aug 2001.
- Approved with conditions on 25 Sep 2001. |
EIA-058/2001 |
Wanchai Development phase II |
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 Jul 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-057/2001 |
Central - Wan Chai Bypass and Island Eastern Corridor Link |
Highways Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 Jul 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-056/2001 |
Lei Yue Mun Road Underpass, Modification at Junction with Yau Tong Road and Associated Improvement Works - Feasibility Study |
Highways Department |
- Applicant was informed on 6 Aug 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 28 Sep 2001 to 27 Oct 2001.
- Approved with conditions on 21 Feb 2002. |
EIA-055/2001 |
Central Reclamation Phase III - Studies, Site Investigation, Design and Construction |
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 Jul 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-054/2001 |
Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam |
Highways Department |
- Applicant was informed on 31 Jul 2001 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 Aug 2001 to 15 Sep 2001.
- Approved with conditions on 5 Dec 2001. |
EIA-053/2001 |
Modifications to MTRC Tsim Sha Tsui Station |
MTR Corporation Limited |
- Applicant was informed on 12 Jul 2001 of the suitability of the report for public inspection.
- Report was informed for public to comment from 20 July 2001 to 18 Aug 2001.
- Approved with conditions on 12 Sep 2001. |
EIA-052/2001 |
Tseung Kwan O Development Contract No. TK44 Dualling of Hang Hau Road |
Territory Development Department |
- Applicant was informed on 18 Apr 2001 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 19 February 2002. |
EIA-051/2000 |
Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun |
Architectural Services Department |
-
Application was withdrawn by applicant on 22 Jan 2001. |
EIA-050/2000 |
Lantau North-South Road Link between Tai Ho Wan and Mui Wo |
Highways Department |
-Applicant was informed on 13 Nov 2000 that the report submitted on 15 Sep 2000 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-049/2000 |
West Kowloon Reclamation Contract No. WK30-Remaining Roadworks Stage 4, Link Roads G & L |
Kowloon Development Office, Territory Development Department |
- Applicant was informed on 31 Oct 2000 of the suitability of the report for public inspection.
-Report is exhibited for the public to comment from 15 Nov 2000 to 14 Dec 2000
- Approved with conditions on 10 Jan 2001. |
EIA-048/2000 |
Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay |
Maunsell Consultants Asia Limited |
-Applicant was informed on 20 Sep 2000 that the report submitted on 25 Jul 2000 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-047/2000 |
Proposed RMC concrete batching plant at Telegraph Bay for Cyberport Development |
Cyber-Port Limited |
- Applicant was informed on 21 Oct 2001 of the suitability of the report for public inspection.
-Report is exhibited for the public to comment from 14 Nov 2000 to 13 Dec 2000
- Approved with conditions on 15 Jan 2001. |
EIA-046/2000 |
Yau Tong Bay Development - Reclamation of Yau Tong Bay |
Maunsell Consultants Asia Limited |
-Applicant was informed on 20 Sep 2000 that the report submitted on 29 Aug 2000 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-045/2000 |
Choi Hung Road Widening Feasibility Study - Environmental Impact Assessment |
Highways Department |
- Applicant was informed on 20 Jul 2000 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 4 January 2001. |
EIA-044/2000 |
Sheung Shui to Lok Ma Chau Spur Line - Environmental Impact Assessment |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 7 June 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 12 June 2000 to 11 July 2000.
- The ACE EIA sub-committee and ACE were consulted on 27 June, 6 July, 11 July and 17 July 2000.
- Applicant was informed on 16 October 2000 that the report was rejected. (reasons) |
EIA-043/2000 |
Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling - Environmental Impact Assessment |
Highways Department |
- Applicant was informed on 17 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 May 2000 to 24 Jun 2000.
- Approved with conditions on 14 Jul 2000. |
EIA-042/2000 |
Tai O Sheltered Boat Anchorage - Environmental & Drainage Impact Assessment - Environmental Impact Assessment |
Civil Engineering Department |
- Applicant was informed on 08 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 May 2000 to 22 Jun 2000.
- Approved with conditions on 12 Jul 2000. |
EIA-041/2000 |
Construction of an International Theme Park in Penny's Bay of North Lantau together with its Essential Associated Infrastructures - Environmental Impact Assessment |
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000. |
EIA-040/2000 |
Northshore Lantau Development Feasibility Study - Environmental Impact Assessment |
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000. |
EIA-039/2000 |
Shenzhen River Regulation Project Stage III - Environmental Impact Assessment |
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Apr 2000 to 10 May 2000.
- Approved with conditions on 8 Jun 2000. |
EIA-038/2000 |
Tuen Mun Sewerage - Eastern coastal Sewerage Extension - Environmental Impact Assessment |
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Apr 2000 to 12 May 2000.
- Approved with conditions on 7 Jun 2000. |
EIA-037/2000 |
Sheung Shui to Lok Ma Chau Spur Line - Environmental Impact Assessment |
Kowloon-Canton Railway Corporation |
- Application was withdrawn by applicant on 23 Mar 2000. |
EIA-036/1999 |
East Rail Extension - Hung Hom to Tsim Sha Tsui - Environmental Impact Assessment |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 27 Jan 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Feb 2000 to 23 Mar 2000.
- Approved with conditions on 24 May 2000. |
EIA-035/1999 |
Lantau North-South Road Link between Tai Ho Wan and Mui Wo |
Highways Department |
-Applicant was informed on 22 Dec 1999 that the report submitted on 2 Nov 1999 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-034/1999 |
New World First Bus Permanent Depot at Chai Wan |
New World First Bus Services Limited |
- Applicant was informed on 09 Dec 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Dec 1999 to 12 Jan 2000.
- Approved with conditions on 25 Jan 2000. |
EIA-033/1999 |
Route 10 North Lantau to Yuen Long Highway Investigation and Preliminary Design (Southern Section) |
Highways Department |
- Applicant was informed on 23 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Nov 1999 to 29 Dec 1999.
- Approved with conditions on 02 Feb 2000. |
EIA-032/1999 |
East Rail Extension - Hung Hom to Tsim Sha Tsui - Environmental Impact Assessment |
Kowloon Canton Railway Corporation |
-Applicant was informed on 08 Nov 1999 that the report submitted on 28 Sep 1999 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-031/1999 |
Light Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone and Grade Separation of the LRT with Pui To Road and Tsing Lung Road in Tuen Mun |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999.
- Approved with conditions on 06 Jan 2000. |
EIA-030/1999 |
Tin Shui Wai Phase 4 Rail Extension |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999.
- Approved with conditions on 06 Jan 2000. |
EIA-029/1999 |
132 kV Overhead Pole Line & Underground Cable from the Existing Po Lam Substation to the Existing Tui Min Hoi Substation - Circuit No.2 |
CLP Power Hong Kong Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 05 Nov 1999 to 04 Dec 1999.
- Approved with conditions on 22 Dec 1999. |
EIA-028/1999 |
Hebe Haven Yacht Club Development - Phase 2 Environmental Impact Assessment Study |
Halcrow China Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 1999 to 14 Dec 1999.
- Approved with conditions on 03 Jan 2000. |
EIA-027/1999 |
East Rail Extensions - Tai Wai to Ma On Shan |
Kowloon Canton Railway Corporation |
- Applicant was informed on 19 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Oct 1999 to 18 Nov 1999.
- Approved with conditions on 15 Jan 2000. |
EIA-026/1999 |
Essential Public Infrastructure Works Yuen Long, Tin Shui Wai, Tuen Mun Centre and the Eastern Access Road |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 30 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 02 Oct 1999 to 31 Oct 1999.
- Approved with conditions on 28 Dec 1999. |
EIA-025/1999 |
Route 9 between Tsing Yi and Cheung Sha Wan |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Aug 1999 to 21 Sep 1999.
- Approved with conditions on 19 Oct 1999. |
EIA-024/1999 |
Widening and Reconstruction of Tai Po Road (Sha Tin Section) |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 09 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Sep 1999 to 14 Oct 1999.
- Approved with conditions on 19 Nov 1999. |
EIA-023/1999 |
Tseung Kwan O Development - Contract F: Grade Separated Interchange T1/P1/P2 |
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 31 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999.
- Approved with conditions on 20 Oct 1999. |
EIA-022/1999 |
Sha Tin Sewage Treatment Works, Stage III Extension - Environmental Impact Assessment Study |
Drainage Services Department |
- Applicant was informed on 03 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 17 Sep 1999 to 16 Oct 1999.
- Approved with conditions on 05 Nov 1999. |
EIA-021/1999 |
Feasibility Study on the Alternative Alignment for the Western Coast Road, Tseung Kwan O |
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 01 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999.
- Approved with conditions on 20 Oct 1999. |
EIA-020/1999 |
Route 16 Investigation Assignment from West Kowloon to Sha Tin - Alternative Alignment Environmental Impact Assessment |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 30 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 03 Sep 1999 to 02 Oct 1999.
- Approved with conditions on 05 Nov 1999. |
EIA-019/1999 |
132 kV Overhead Pole Line & Underground Cable from the Existing Po Lam Substation to the Existing Tui Min Hoi Substation - Circuit No. 2 |
CLP Power Hong Kong Limited |
- Application was withdrawn by applicant on 13 Jul 1999. |
EIA-018/1999 |
Sai Sha Road Widening between Kam Ying Road and proposed Road T7 Junction |
Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 27 Aug 1999 to 25 Sep 1999.
- Approved with conditions on 19 Oct 1999. |
EIA-017/1999 |
Essential Public Infrastructure Works Associated with West Rail Stations in Yuen Long, Tin Shui Wai and Tuen Mun Centre |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 22 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jun 1999 to 24 Jul 1999.
- Approved with conditions on 20 Aug 1999. |
EIA-016/1999 |
EIA for Salisbury Road Underpass and Associated Road Improvement Works (including Middle Road Circulation System) |
Highways Department |
- Applicant was informed on 21 Jun 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Jun 1999 to 29 Jul 1999.
- Approved with conditions on 26 Aug 1999. |
EIA-015/1999 |
Planning and Development Study of Potential Housing Site in Area 54, Tuen Mun |
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 24 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 09 Jul 1999 to 08 Aug 1999.
- Approved with conditions on 03 Sep 1999. |
EIA-014/1999 |
Main Drainage Channels and Poldered Village Protection Schemes for San Tin, NWNT EIA Study |
N.T. North Development Office, Territory Development Department |
- Applicant was informed on 04 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Jun 1999 to 13 Jul 1999.
- Approved with conditions on 14 Sep 1999. |
EIA-013/1999 |
Tang Lung Chau Dangerous Goods Anchorage |
N.T.West Development Office, Territory Development Department |
- Applicant was informed on 20 May 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 01 Jun 1999 to 30 Jun 1999.
- Approved with conditions on 17 Jul 1999. |
EIA-012/1999 |
Route 9 between Tsing Yi and Cheung Sha Wan |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 07 May 1999 of the suitability of the report for public inspection.
- It was superseded by another submission by the applicant on 21 Jul 1999.
- Application was withdrawn by applicant on 21 July 1999. |
EIA-011/1999 |
Infrastructural Works for the Proposed Development at Telegraph Bay - Engineering Feasibility Study |
Information Technology and Broadcasting Bureau of the Government for the Hong Kong Special Administrative Region Department |
- Applicant was informed on 09 Mar 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Mar 1999 to 10 Apr 1999.
- Approved with conditions on 26 Apr 1999. |
EIA-010/1999 |
Feasibility Study for South East Kowloon Development |
Territory Development Department |
- Application was withdrawn by applicant on 17 March 1999. |
EIA-009/1998 |
1,800 MW Gas-fired Power Station at Lamma Extension |
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 19 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 05 Mar 1999 to 03 Apr 1999.
- Approved with conditions on 05 May 1999. |
EIA-008/1998 |
Planning and Engineering Feasibility Study for Development near Choi Wan Road and Jordan Valley |
Civil Engineering Department |
- Applicant was informed on 09 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Feb 1999 to 15 Mar 1999.
- Approved with conditions on 20 Apr 1999.
Environmental Review Report for Proposed Road G1 Realignment |
EIA-007/1998 |
Footbridge and Improvement to Ap Lei Chau Bridge Road and Ap Lei Chau Drive |
Highways Department |
- Applicant was informed on 04 Jan 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 08 Jan 1999 to 06 Feb 1999.
- Approved with conditions on 24 Feb 1999 |
EIA-006/1998 |
Dredging an Area of Kellett Bank for Reprovisioning of Six Government Mooring Buoys |
Civil Engineering Department |
- Applicant was informed on 28 Nov 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 8 Jan 1999.
- Approved without conditions on 01 Mar 1999. |
EIA-005/1998 |
Planning and Engineering Feasibility Study for Development at Anderson Road |
Civil Engineering Department |
- Applicant was informed on 04 Dec 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 08 Jan 1999.
- Approved with conditions on 02 Mar 1999. |
EIA-004/1998 |
Yuen Long Bypass Floodway - Feasibility Study |
Territory Development Department |
- Applicant was informed on 31 July 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 14 Aug 1998 to 12 Sep 1998.
- Approved without condition on 10 Oct 1998. |
EIA-003/1998 |
Kai Tak Airport North Apron Decomissioning |
Territory Development Department |
- Applicant was informed on 25 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 03 Jul 1998 to 02 Aug 1998.
- Approved with conditions on 04 Sep 1998. |
EIA-002/1998 |
Tsuen Wan Bay Further Reclamation, Area 35, Tsuen Wan Engineering, Planning and Environmental Investigation |
N.T. West Development Office |
- Applicant was informed on 15 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 25 Sep 1998 to 24 Oct 1998.
- Approved with conditions on 24 Nov 1998. |
EIA-001/1998 |
Pak Shek Kok Development |
Maunsell Consultants Asia Ltd. |
- Applicant was informed on 15 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 19 Jun 1998 to 18 Jul 1998.
- Approved with conditions on 10 Aug 1998. |