EIA-308/2024 |
Provision of Crematorium at Wo Hop Shek Cemetery
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D Visualization]
[EM&A Manual] [PDF] | [HTML]
|
Food and Environmental Hygiene Department |
- Applicant was informed on 21 October 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2024 to 23 Nov 2024. During the period, 1 Public Comment was received.
- Approved without conditions on 19 Dec 2024.
- Register No.: AEIAR-264/2024
Link to other related information
|
EIA-307/2024 |
Development of Integrated Waste Management Facilities Phase 2 (I·PARK2)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D Visualization]
[EM&A Manual] [PDF] | [HTML] |
Waste Infrastructure Division of Environmental Protection Department |
- Applicant was informed on 10 September 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Sep 2024 to 11 Oct 2024. During the period, 9 Public Comments were received.
- Approved with conditions on 9 Dec 2024.
- Register No.: AEIAR-263/2024
Link to other related information
|
EIA-304/2024 |
Ngau Tam Mei Water Treatment Works Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 19 July 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jul 2024 to 28 Aug 2024. During the period, 1 Public Comment was received.
- Approved without conditions on 26 Sep 2024.
- Register No.: AEIAR-262/2024
Link to other related information
|
EIA-303/2023 |
Construction of Annex Block at Hong Kong Observatory Headquarters, Tsim Sha Tsui
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Hong Kong Observatory |
- Applicant was informed on 19 January 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Jan 2024 to 22 Feb 2024. During the period, 2 Public Comments were received.
- Approved without conditions on 19 Mar 2024.
- Register No.: AEIAR-260/2024
Link to other related information
|
EIA-302/2023 |
San Tin / Lok Ma Chau Development Node
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 30 Jan 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 Feb 2024 to 2 Mar 2024. During the period, 50 Public Comments were received.
- Approved with conditions on 17 May 2024.
- Register No.: AEIAR-261/2024
Link to other related information
|
EIA-301/2023 |
Northern Link
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 24 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Dec 2023 to 11 Jan 2024. During the period, 9 Public Comments were received.
- Approved with conditions on 9 Feb 2024.
- Register No.: AEIAR-259/2024
Link to other related information
|
EIA-300/2023 |
Widening of Yuen Long Highway (Section between Lam Tei and Tong Yan San Tsuen)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 20 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Nov 2023 to 29 Dec 2023. During the period, 1 Public Comments were received.
- Approved without conditions on 25 Jan 2024.
- Register No.: AEIAR-258/2024
Link to other related information
|
EIA-299/2023 |
Improvement to So Kwun Po Interchange
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 9 October 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Oct 2023 to 15 Nov 2023. During the period, 1 Public Comment was received.
- Approved without conditions on 14 Dec 2023.
- Register No.: AEIAR-257/2023
Link to other related information
|
EIA-298/2023 |
Tuen Mun Bypass
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 22 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Oct 2023 to 4 Nov 2023. During the period, 11 Public Comments were received.
- Approved without conditions on 1 Dec 2023.
- Register No.: AEIAR-256/2023
Link to other related information
|
EIA-297/2023 |
Route 11 (Section between Yuen Long and North Lantau)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 15 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Sep 2023 to 28 Oct 2023. During the period, 16 Public Comments were received.
- Approved without conditions on 24 Nov 2023.
- Register No.: AEIAR-255/2023
Link to other related information
|
EIA-296/2023 |
Widening of Tsuen Wan Road and the associated junction improvement works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 24 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2023 to 28 Sep 2023. During the period, Nil Public Comments were received.
- Approved without conditions on 25 Oct 2023.
- Register No.: AEIAR-253/2023
Link to other related information
|
EIA-295/2023 |
Airport Tung Chung Link Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[3D visualization]
[EM&A Manual] [PDF] | [HTML] |
Airport Authority Hong Kong |
- Applicant was informed on 21 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Aug 2023 to 29 Sep 2023. During the period, 1 set of written comment were received from members of the public.
- Approved without conditions on 26 Oct 2023.
- Register No.: AEIAR-254/2023
Link to other related information
|
EIA-294/2023 |
Drainage Improvement Works in Mui Wo
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 13 Jun 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jun 2023 to 29 Jul 2023. During the period, 3 sets of written comment were received from members of the public.
- Approved without conditions on 22 Aug 2023.
- Register No.: AEIAR-252/2023
Link to other related information
|
EIA-293/2023 |
Traffic Improvement Scheme in Tuen Mun - Widening and Addition of Slip roads at Lung Fu Road / Tuen Mun Road / Wong Chu Road / Hoi Wing Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 12 May 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 May 2023 to 16 Jun 2023. During the period, one set of written comment were received from members of the public.
- Approved without conditions on 23 June 2023.
- Register No.: AEIAR-251/2023
Link to other related information
|
EIA-292/2022 |
Revitalisation of Tai Wai Nullah
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 15 Feb 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Feb 2023 to 22 Mar 2023. During the period, 6 sets of written comment were received from members of the public.
- Approved without conditions on 19 Apr 2023.
- Register No.: AEIAR-249/2023
Link to other related information
|
EIA-291/2022 |
Establishment of Fish Culture Zone at Po Toi (Southeast)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022. During the period, 4 sets of written comment were received from members of the public.
- Approved with conditions on 31 Mar 2023.
- Register No.: AEIAR-248/2023
Link to other related information
|
EIA-290/2022 |
Establishment of Fish Culture Zone at Mirs Bay
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 31 Mar 2023.
- Register No.: AEIAR-247/2023
Link to other related information
|
EIA-289/2022 |
Establishment of Fish Culture Zone at Outer Tap Mun
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 31 Mar 2023.
- Register No.: AEIAR-246/2023
Link to other related information
|
EIA-288/2022 |
Establishment of Fish Culture Zone at Wong Chuk Kok Hoi
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 31 Mar 2023.
- Register No.: AEIAR-245/2023
Link to other related information
|
EIA-287/2022 |
Revitalisation of Fo Tan Nullah
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 3 Oct 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 11 Oct 2022 to 9 Nov 2022. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 25 Nov 2022.
- Register No.: AEIAR-243/2022
Link to other related information
|
EIA-286/2022 |
Upgrading of Tai Po Sewage Treatment Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 15 Sep 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 23 Sep 2022 to 22 Oct 2022. During the period, 3 sets of written comment were received from members of the public.
- Approved without conditions on 5 Dec 2022.
- Register No.: AEIAR-244/2022
Link to other related information
|
EIA-285/2022 |
Improvement of Lion Rock Tunnel
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 5 Aug 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 15 Aug 2022 to 13 Sep 2022. During the period, 61 sets of written comment were received from members of the public.
- Approved with conditions on 15 Nov 2022
- Register No.: AEIAR-242/2022
Link to other related information
|
EIA-284/2022 |
New Contaminated Sediment Disposal Facility to the West of Lamma Island
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 27 Jul 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 26 Aug 2022 to 24 Sep 2022. During the period, 34 sets of written comment were received from members of the public.
- Approved without conditions on 21 Oct 2022.
- Register No.: AEIAR-241/2022
Link to other related information
|
EIA-283/2022 |
Drainage Improvement Works in Ta Kwu Ling
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 20 Jun 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 27 Jun 2022 to 26 Jul 2022. During the period, 4 sets of written comment were received from members of the public.
- Approved without conditions on 10 Aug 2022
- Register No.: AEIAR-238/2022
Link to other related information
|
EIA-282/2022 |
Technical Study on Partial Development of Fanling Golf Course Site – Feasibility Study
|
Civil Engineering and Development Department |
The High Court ordered on 2 Dec 2024 that the decision of the Director made on 11 May 2023 approving the EIA report be quashed.
Link to other related information
|
EIA-281/2022 |
Hung Shui Kiu Effluent Polishing Plant
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 1 Jun 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 15 Jun 2022 to 14 Jul 2022. During the period, Nil Public Comments were received.
- Approved with conditions on 19 Oct 2022
- Register No.: AEIAR-240/2022
Link to other related information
|
EIA-280/2022 |
Cycle Track between Tsuen Wan and Tuen Mun (Tuen Mun to So Kwun Wat)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 4 May 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 20 May 2022 to 18 Jun 2022. During the period, 3 sets of written comment were received from members of the public.
- Approved with conditions on 31 Aug 2022
- Register No.: AEIAR-239/2022
Link to other related information
|
EIA-279/2022 |
Tuen Mun South Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 26 Apr 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 May 2022 to 15 Jun 2022. During the period, 8 sets of written comment were received from members of the public.
- Approved without conditions on 12 Jul 2022
- Register No.: AEIAR-236/2022
Link to other related information
|
EIA-278/2022 |
Yuen Long South Effluent Polishing Plant
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 25 Mar 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 6 Apr 2022 to 5 May 2022. During the period, 16 sets of written comment were received from members of the public.
- Approved with conditions on 25 Jul 2022
- Register No.: AEIAR-237/2022
Link to other related information
|
EIA-277/2021 |
Tung Chung Line Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 24 Jan 2022 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 10 Feb 2022 to 11 Mar 2022 and 23 Mar 2022 to 1 Apr 2022. During the period, 317 sets of written comment were received from members of the public.
- Approved with conditions on 12 Jul 2022
- Register No.: AEIAR-235/2022
Link to other related information
|
EIA-276/2021 |
Re-provision of Open Cycle Gas Turbines at Lamma Power Station
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
The Hong Kong Electric Company Limited |
- Applicant was informed on 10 Dec 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 21 Dec 2021 to 19 Jan 2022. During the period, Nil Public Comments were received.
- Approved without conditions on 1 Apr 2022.
- Register No.: AEIAR-234/2022
Link to other related information
|
EIA-274/2021 |
Mai Po Nature Reserve Infrastructure Upgrade Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
World Wide Fund For Nature Hong Kong |
- Applicant was informed on 2 Nov 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 19 Nov 2021 to 18 Dec 2021. During the period, no public comment received.
- Approved with conditions on 16 Feb 2022
- Register No.: AEIAR-233/2022
Link to other related information
|
EIA-273/2021 |
Revised Trunk Road T4 in Sha Tin
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 26 Aug 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 10 Sep 2021 to 9 Oct 2021. During the period, 857 sets of written comment were received from members of the public.
- Approved without conditions on 8 Nov 2021.
- Register No.: AEIAR-231/2021
Link to other related information
|
EIA-271/2021 |
Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 13 Jul 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 27 Jul 2021 to 25 Aug 2021. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 16 Nov 2021.
- Register No.: AEIAR-232/2021
Link to other related information
|
EIA-270/2021 |
Sai O Trunk Sewer Sewage Pumping Station
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 31 Mar 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 20 Apr 2021 to 19 May 2021. During the period, 1074 sets of written comment were received from members of the public.
- Approved without conditions on 4 June 2021.
- Register No.: AEIAR-230/2021
Link to other related information
|
EIA-269/2021 |
Yuen Long Barrage Scheme
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 16 Mar 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 29 Mar 2021 to 27 Apr 2021. During the period, 10 sets of written comment were received from members of the public.
- Approvedwithout conditions on 24 May 2021
- Register No.: AEIAR-228/2021
Link to other related information
|
EIA-268/2020 |
Drainage Improvement Works Near Four Villages in Yuen Long - Sung Shan New Village, Tai Wo, Lin Fa Tei and Ha Che
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 21 Jan 2021 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 22 Feb 2021 to 23 Mar 2021. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 3 June 2021
- Register No.: AEIAR-229/2021
Link to other related information
|
EIA-266/2020 |
A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Hospital Authority |
- Applicant was informed on 20 Oct 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 28 Oct 2020 to 26 Nov 2020. During the period, no public comment received.
- Approvedwithout conditions on 17 Dec 2020
- Register No.: AEIAR-224/2020
Link to other related information
|
EIA-265/2020 |
Pier Improvement at Tung Ping Chau
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 29 Dec 2020
- Register No.: AEIAR-226/2020
Link to other related information
|
EIA-264/2020 |
Pier Improvement at Lai Chi Wo
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020. During the period, 3 sets of written comment were received from members of the public.
- Approved with conditions on 29 Dec 2020
- Register No.: AEIAR-225/2020
Link to other related information
|
EIA-263/2020 |
Development at San Hing Road and Hong Po Road, Tuen Mun
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 6 Oct 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 23 Oct 2020 to 21 Nov 2020. During the period, 6 sets of written comment were received from members of the public.
- Approved with conditions on 30 Dec 2020.
- Register No.: AEIAR-227/2020
Link to other related information
|
EIA-262/2020 |
Improvement of Yuen Long Town Nullah (Town Centre Section)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 7 Apr 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 22 Apr 2020 to 21 May 2020. During the period, 25 sets of written comment were received from members of the public.
- Approved with conditions on 31 Jul 2020
- Register No.: AEIAR-223/2020
Link to other related information
|
EIA-261/2019 |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 31 Jan 2020 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 14 Feb 2020 to 14 Mar 2020. During the period, 3 sets of written comment were received from members of the public.
- Approved with conditions on 27 May 2020
- Register No.: AEIAR-222/2020
Link to other related information
|
EIA-260/2019 |
Shuen Wan Golf Course
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Sha Lo Tung Development Company Limited |
- Applicant was informed on 28 Mar 2019 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 4 Apr 2019 to 3 May 2019. During the period, 14 sets of written comment were received from members of the public.
- Approved with conditions on 5 Jul 2019.
- Register No.: AEIAR-221/2019
Link to other related information
|
EIA-259/2018 |
Yuen Long Effluent Polishing Plant
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 19 Feb 2019 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 28 Feb 2019 to 29 Mar 2019. During the period, 6 sets of written comment were received from members of the public.
- Approved with conditions on 25 Apr 2019.
- Register No.: AEIAR-220/2019
Link to other related information
|
EIA-258/2018 |
Lei Yue Mun Waterfront Enhancement Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 17 July 2018 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 27 Jul 2018 to 25 Aug 2018. During the period, no public comment received.
- Approved with conditions on 26 Oct 2018.
- Register No.: AEIAR-219/2018
Link to other related information
|
EIA-257/2018 |
Intermodal Transfer Terminal - Bonded Vehicular Bridge and Associated Roads
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Airport Authority Hong Kong |
- Applicant was informed on 9 July 2018 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 13 Jul 2018 to 11 Aug 2018. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 23 Aug 2018.
- Register No.: AEIAR-216/2018
Link to other related information
|
EIA-256/2018 |
Hong Kong Offshore LNG Terminal
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
CLP Power Hong Kong Limited |
- Applicant was informed on 13 Jun 2018 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 15 Jun 2018 to 14 Jul 2018. During the period, 51 sets of written comment were received from members of the public.
- Approved with conditions on 5 Oct 2018.
- Register No.: AEIAR-218/2018
Link to other related information
|
EIA-255/2018 |
Proposed Interim Sewage Treatment Plant and Effluent Reuse Facility at Wo Shang Wai, Yuen Long
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Profit Point Enterprises Limited |
- Applicant was informed on 6 Jul 2018 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 20 Jul 2018 to 18 Aug 2018. During the period, no public comment received.
- Approved without conditions on 3 Sep 2018.
- Register No.: AEIAR-217/2018
Link to other related information
|
EIA-254/2017 |
Housing Sites in Yuen Long South
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 27 Jul 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 8 Aug 2017 to 6 Sep 2017. During the period, 11 sets of written comment were received from members of the public.
- Approved with conditions on 30 Nov 2017.
- Register No.: AEIAR-215/2017
Link to other related information
|
EIA-253/2017 |
Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017. During the period, 8 sets of written comment were received from members of the public.
- Approved with condition on 29 Nov 2017.
- Register No.: AEIAR-214/2017
Link to other related information
|
EIA-252/2017 |
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017. During the period, 6 sets of written comment were received from members of the public.
- Approved with condition on 29 Nov 2017.
- Register No.: AEIAR-213/2017
Link to other related information
|
EIA-251/2017 |
Improvement Dredging for Lamma Power Station Navigation Channel
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
The Hong Kong Electric Company Limited |
- Applicant was informed on 24 May 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 9 Jun 2017 to 8 Jul 2017. During the period, 4 sets of written comment were received from members of the public.
- Approved with conditions on 10 Oct 2017.
- Register No.: AEIAR-212/2017
Link to other related information
|
EIA-250/2017 |
Mui Wo Lai Chi Yuen Cemetery Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Food and Environmental Hygiene Department |
- Applicant was informed on 24 Mar 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 18 Apr 2017 to 17 May 2017. During the period, no public comment received.
- Approved without conditions on 15 Jun 2017.
- Register No.: AEIAR-211/2017
Link to other related information
|
EIA-249/2016 |
A Rooftop Helipad at the Proposed New Block of Queen Mary Hospital
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Food and Health Bureau |
- Applicant was informed on 18 Jan 2017 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 3 Feb 2017 to 4 Mar 2017. During the period, 3 sets of written comment were received from members of the public.
- Approved without conditions on 22 Mar 2017.
- Register No.: AEIAR-208/2017
Link to other related information
|
EIA-248/2016 |
Hung Shui Kiu New Development Area
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 26 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 5 Sep 2016 to 4 Oct 2016. During the period, 13 sets of written comment were received from members of the public.
- Approved with condition on 15 Dec 2016.
- Register No.: AEIAR-203/2016
Link to other related information
|
EIA-247/2016 |
Kai Tak Multi-purpose Sports Complex
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Architectural Services Department |
- Applicant was informed on 23 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 1 Sep 2016 to 30 Sep 2016. During the period, 3 sets of written comment were received from members of the public.
- Approved with condition on 6 Jan 2017.
- Register No.: AEIAR-204/2017
Link to other related information
|
EIA-246/2016 |
Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 25 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 18 Nov 2016 to 17 Dec 2016. During the period, 4 sets of written comment were received from members of the public.
- Approved with condition on 24 Apr 2017.
- Register No.: AEIAR-210/2017
Link to other related information
|
EIA-245/2016 |
Expansion of Sha Tau Kok Sewage Treatment Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 24 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 2 Sep 2016 to 1 Oct 2016. During the period, no public comment received.
- Approved with condition on 14 Feb 2017.
- Register No.: AEIAR-207/2017
Link to other related information
|
EIA-244/2016 |
Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 19 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 15 Sep 2016 to 14 Oct 2016. During the period, 4 sets of written comment were received from members of the public.
- Approved with condition on 27 Jan 2017.
- Register No.: AEIAR-206/2017
Link to other related information
|
EIA-243/2016 |
Outlying Islands Sewerage Stage 2 - Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 19 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 29 Nov 2016 to 28 Dec 2016. During the period, 1 set of written comment was received from members of the public.
- Approved with condition on 29 Mar 2017.
- Register No.: AEIAR-209/2017
Link to other related information
|
EIA-242/2016 |
Proposed Low-rise and Low-density Residential Development at Various Lots and their Adjoining Government Land in D.D. 104, East of Kam Pok Road, Mai Po, Yuen Long. N.T.
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Glory Queen Limited |
- Applicant was informed on 19 Aug 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 26 Aug 2016 to 24 Sep 2016. During the period, 2 sets of written comment were received from members of the public.
- Approved with condition on 10 Jan 2017.
- Register No.: AEIAR-205/2017
Link to other related information
|
EIA-241/2016 |
Elevated Pedestrian Corridor in Yuen Long Town Connecting with Long Ping Station
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 28 Jul 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 5 Aug 2016 to 3 Sep 2016. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 19 Oct 2016.
- Register No.: AEIAR-200/2016
Link to other related information
|
EIA-240/2016 |
Sha Tin Cavern Sewage Treatment Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 21 Jul 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 5 Aug 2016 to 3 Sep 2016. During the period, 2 sets of written comment were received from members of the public.
- Approved with condition on 28 Nov 2016.
- Register No.: AEIAR-202/2016
Link to other related information
|
EIA-239/2016 |
Police Facilities in Kong Nga Po
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 28 Jul 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 4 Aug 2016 to 2 Sep 2016. During the period, 3 sets of written comment were received from members of the public.
- Approved with condition on 20 Oct 2016.
- Register No.: AEIAR-201/2016
Link to other related information
|
EIA-238/2016 |
New Wang Tong River Bridge
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 15 Jul 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 3 Aug 2016 to 1 Sep 2016. During the period, 3 sets of written comment were received from members of the public.
- Approved without conditions on 23 Sep 2016.
- Register No.: AEIAR-199/2016
Link to other related information
|
EIA-237/2016 |
Additional Gas-fired Generation Units Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Castle Peak Power Company Limited |
- Applicant was informed on 13 Apr 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 20 Apr 2016 to 19 May 2016. During the period, 51 sets of written comment were received from members of the public.
- Approved without conditions on 7 Jun 2016.
- Register No.: AEIAR-197/2016
Link to other related information
|
EIA-236/2016 |
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 21 Mar 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 5 Apr 2016 to 4 May 2016. During the period, 4 sets of written comment were received from members of the public.
- Approved with condition on 8 Aug 2016.
- Register No.: AEIAR-198/2016
Link to other related information
|
EIA-235/2015 |
Development of Anderson Road Quarry site - Road Improvement Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 20 Jan 2016 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 4 Feb 2016 to 4 Mar 2016. During the period, no public comment received.
- Approved without conditions on 22 Mar 2016.
- Register No.: AEIAR-195/2016
Link to other related information
|
EIA-234/2015 |
Development of Anderson Road Quarry site - Rock Cavern Developments
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 18 Dec 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 22 Jan 2016 to 20 Feb 2016. During the period, no public comment received.
- Approved without conditions on 15 Mar 2016.
- Register No.: AEIAR-194/2016
Link to other related information
|
EIA-233/2015 |
Tung Chung New Town Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 1 Dec 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 4 Dec 2015 to 2 Jan 2016. During the period, 2306 sets of written comment were received from members of the public.
- Approved with condition on 8 Apr 2016.
- Register No.: AEIAR-196/2016
Link to other related information
|
EIA-232/2015 |
Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Dragages Hong Kong Ltd. |
- Applicant was informed on 16 Sep 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 24 Sep 2015 to 23 Oct 2015. During the period, 34 sets of written comment were received from members of the public.
- Approved without conditions on 12 Nov 2015.
- Register No.: AEIAR-193/2015
Link to other related information
|
EIA-230/2015 |
Chai Wan Government Complex and Vehicle Depot
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Hong Kong Police Force |
- Applicant was informed on 20 Jul 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 31 Jul 2015 to 29 Aug 2015. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 5 Oct 2015.
- Register No.: AEIAR-191/2015
Link to other related information
|
EIA-229/2015 |
Desalination Plant at Tseung Kwan O
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 17 Jul 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 30 Jul 2015 to 28 Aug 2015. During the period, 2 sets of written comment were received from members of the public.
- Approved with condition on 4 Nov 2015.
- Register No.: AEIAR-192/2015
Link to other related information
|
EIA-228/2015 |
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 11 Jun 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 25 Jun 2015 to 24 Jul 2015. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 3 Aug 2015.
- Register No.: AEIAR-190/2015
Link to other related information
|
EIA-227/2015 |
Comprehensive Development and Wetland Protection near Yau Mei San Tsuen
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Asia King Development Limited |
- Applicant was informed on 17 Mar 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 25 Mar 2015 to 23 Apr 2015. During the period, 10 sets of written comment were received from members of the public.
- Approved without conditions on 6 Jul 2015.
- Register No.: AEIAR-189/2015
Link to other related information
|
EIA-226/2014 |
Alternative Ground Decontamination Works at the Proposed Kennedy Town Comprehensive Development Area Site
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 20 Jan 2015 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 29 Jan 2015 to 27 Feb 2015. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 1 Apr 2015.
- Register No.: AEIAR-188/2015
Link to other related information
|
EIA-225/2014 |
Decommissioning of West Portion of The Middle ASH Lagoon at Tsang Tsui, Tuen Mun
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Food and Environmental Hygiene Department |
- Applicant was informed on 3 Dec 2014 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 17 Dec 2014 to 15 Jan 2015. During the period, 1 set of written comment was received from member of the public.
- Approved without conditions on 28 Jan 2015.
- Register No.: AEIAR-186/2015
Link to other related information
|
EIA-224/2014 |
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 28 Nov 2014 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 9 Dec 2014 to 7 Jan 2015. During the period, 3 sets of written comments were received from members of the public.
- Approved without conditions on 28 Jan 2015.
- Register No.: AEIAR-187/2015
Link to other related information
|
EIA-223/2014 |
Expansion of Hong Kong International Airport into a Three-Runway System
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Airport Authority Hong Kong |
- Applicant was informed on 12 Jun 2014 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 20 Jun 2014 to 19 Jul 2014. During the period, 29,133 sets of written comments were received from members of the public.
- Approved on 7 Nov 2014.
- Register No.: AEIAR-185/2014
Link to other related information
|
EIA-222/2014 |
Development of Anderson Road Quarry
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 3 Jun 2014 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Jun 2014 to 12 Jul 2014. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 28 Jul 2014.
- Register No.: AEIAR-183/2014
Link to other related information
|
EIA-221/2014 |
Tai Shue Wan Development at Ocean Park
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Ocean Park Corporation |
- Applicant was informed on 13 May 2014 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 May 2014 to 18 Jun 2014. During the period, 2 sets of written comment was received from members of the public.
- Approved with condition on 27 Aug 2014.
- Register No.: AEIAR-184/2014
Link to other related information
|
EIA-220/2014 |
Proposed Residential Cum Passive Recreation Development within "Recreation" Zone and "Residential (Group C)" Zone at Various Lots in DD 104, Yuen Long, N.T.
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Capital Chance Ltd |
- Applicant was informed on 13 Mar 2014 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Mar 2014 to 19 Apr 2014. During the period, 9 sets of written comment was received from members of the public.
- Approved with condition on 15 Jul 2014.
- Register No.: AEIAR-182/2014
Link to other related information
|
EIA-219/2013 |
Outlying Island Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 9 Oct 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Oct 2013 to 28 Nov 2013. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 12 Dec 2013.
- Register No.: AEIAR-181/2013
Link to other related information
|
EIA-218/2013 |
Development of Organic Waste Treatment Facilities, Phase 2
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 25 Sep 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Oct 2013 to 2 Nov 2013. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 3 Dec 2013.
- Register No.: AEIAR-180/2013
Link to other related information
|
EIA-217/2013 |
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordiance] [PDF]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 28 August 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sep 2013 to 9 Oct 2013. During the period, 3 sets of written comments were received from members of the public.
- Approved without conditions on 25 Nov 2013.
- Register No.: AEIAR-179/2013
Link to other related information
|
EIA-216/2013 |
Reprovisioning of FEHD Sai Yee Street Environmental Hygiene Offices-cum-vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Food and Environmental Hygiene Department |
- Applicant was informed on 20 Aug 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Sep 2013 to 16 Oct 2013. During the period, 20 sets of written comments were received from members of the public.
- Approved without conditions on 12 Nov 2013.
- Register No.: AEIAR-177/2013
Link to other related information
|
EIA-215/2013 |
West Kowloon Cultural District
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
West Kowloon Cultural District Authority |
- Applicant was informed on 16 Jul 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Jul 2013 to 21 Aug 2013. During the period, 2 sets of written comments were received from members of the public.
- Approved with condition on 18 Nov 2013.
- Register No.: AEIAR-178/2013
Link to other related information
|
EIA-214/2013 |
Trunk Road T2
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 10 Jul 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Jul 2013 to 22 Aug 2013. During the period, no comments were received from members of the public.
- Approved without conditions on 19 Sep 2013.
- Register No.: AEIAR-174/2013
Link to other related information
|
EIA-213/2013 |
North East New Territories New Development Areas
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
New Territories North and West Development Office, Civil Engineering and Development Department |
- Applicant was informed on 27 Jun 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Jul 2013 to 3 Aug 2013. During the period, 941 sets of written comments were received from members of the public.
- Approved with conditions on 18 Oct 2013.
- Register No.: AEIAR-175/2013
Link to other related information
|
EIA-212/2013 |
Development of Lok Ma Chau Loop
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 17 Jun 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Jul 2013 to 3 Aug 2013. During the period, 39 sets of written comments were received from members of the public.
- Approved with conditions on 25 Oct 2013.
- Register No.: AEIAR-176/2013
Link to other related information
|
EIA-210/2013 |
Tseung Kwan O – Lam Tin Tunnel and Associated Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 26 Mar 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Apr 2013 to 2 May 2013. During the period, 13 sets of written comments were received from members of the public.
- Approved with conditions on 11 Jul 2013.
- Register No.: AEIAR-173/2013
Link to other related information
|
EIA-209/2013 |
Cross Bay Link, Tseung Kwan O
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 26 Mar 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Apr 2013 to 2 May 2013. During the period, 9 sets of written comments were received from members of the public.
- Approved with conditions on 11 Jul 2013.
- Register No.: AEIAR-172/2013
Link to other related information
|
EIA-208/2013 |
Central Kowloon Route
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 14 Mar 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Mar 2013 to 23 Apr 2013. During the period, 680 sets of written comments were received from members of the public.
- Approved with conditions on 11 Jul 2013.
- Register No.: AEIAR-171/2013
Link to other related information
|
EIA-207/2012 |
Kai Tak Development – Roads D3A & D4A
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 25 Feb 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 05 Mar 2013 to 03 Apr 2013. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 3 May 2013.
- Register No.: AEIAR-170/2013
Link to other related information
|
EIA-206/2012 |
Drainage Improvement Works at Ngong Ping
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 29 Jan 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Feb 2013 to 22 Mar 2013. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 21 Apr 2013.
- Register No.: AEIAR-169/2013
Link to other related information
|
EIA-202/2012 |
EMSD Hong Kong Workshop at Sheung On Street, Chai Wan
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
EMSD |
- Applicant was informed on 22 May 2012 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Jun 2012 to 30 Jun 2012. During the period, no comments were received from members of the public.
- Approved without conditions on 12 Jul 2012.
- Register No.: AEIAR-168/2012
Link to other related information
|
EIA-201/2011 |
Development of the Integrated Waste Management Facilities Phase 1
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 10 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Nov 2011 to 17 Dec 2011. During the period, 268 sets of written comments were received from members of the public.
- Approved with conditions on 17 Jan 2012.
- Register No.: AEIAR-163/2012
Link to other related information
|
EIA-200/2011 |
Shatin to Central Link - Tai Wai to Hung Hom Section
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 21 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Nov 2011 to 23 Dec 2011. During the period, 9 sets of written comments were received from members of the public.
- Approved with conditions on 17 Feb 2012.
- Register No.: AEIAR-167/2012
Link to other related information
|
EIA-199/2011 |
Shatin to Central Link - Hung Hom to Admiralty Section
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 21 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Nov 2011 to 23 Dec 2011. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 17 Feb 2012.
- Register No.: AEIAR-166/2012
Link to other related information
|
EIA-198/2011 |
Shatin to Central Link - Mong Kok East to Hung Hom Section
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 21 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Nov 2011 to 23 Dec 2011. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 17 Feb 2012.
- Register No.: AEIAR-165/2012
Link to other related information
|
EIA-197/2011 |
Shatin to Central Link - Stabling Sidings at Hung Hom Freight Yard
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 21 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Nov 2011 to 23 Dec 2011. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 17 Feb 2012.
- Register No.: AEIAR-164/2012
Link to other related information
|
EIA-191/2011 |
Central Police Station Conservation and Revitalisation Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
The Jockey Club CPS Limited |
- Applicant was informed on 17 Jan 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Jan 2011 to 24 Feb 2011. During the period, 40 sets of written comments were received from members of the public.
- Approved with conditions on 18 Apr 2011.
- Register No.: AEIAR-162/2011
Link to other related information
|
EIA-190/2010 |
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 15 Dec 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Dec 2010 to 16 Jan 2011. During the period, 7 sets of written comments were received from members of the public.
- Approved with conditions on 24 Mar 2011.
- Register No.: AEIAR-161/2011
Link to other related information
|
EIA-189/2010 |
Regulation of Shenzhen River Stage IV
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 14 Dec 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Dec 2010 to 16 Jan 2011. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions on 22 Mar 2011.
- Register No.: AEIAR-160/2011
Link to other related information
|
EIA-188/2010 |
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
The Hong Kong Federation of Youth Groups |
- Applicant was informed on 16 Oct 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Oct 2010 to 27 Nov 2010. During the period, no comments were received from members of the public.
- Approved without conditions on 17 Dec 2010.
- Register No.: AEIAR-157/2010
Link to other related information
|
EIA-187/2010 |
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 24 Nov 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 08 Dec 2010 to 06 Jan 2011. During the period, no comments were received from members of the public.
- Approved without conditions on 25 Feb 2011.
- Register No.: AEIAR-159/2011
Link to other related information
|
EIA-186/2010 |
Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 24 Nov 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 08 Dec 2010 to 06 Jan 2011. During the period, 1 comment was received from members of the public.
- Approved without conditions on 13 Jan 2011.
- Register No.: AEIAR-158/2011
Link to other related information
|
EIA-185/2010 |
South Island Line (East)
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 04 Aug 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Aug 2010 to 08 Sep 2010. During the period, 45 sets of written comments were received from members of the public.
- Approved with conditions on 26 Oct 2010.
- Register No.: AEIAR-155/2010
Link to other related information
|
EIA-184/2010 |
Kwun Tong Line Extension
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 24 June 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 07 Jul 2010 to 05 Aug 2010. During the period, 1 set of written comments were received from members of the public.
- Approved without conditions on 19 Aug 2010.
- Register No.: AEIAR-154/2010
Link to other related information
|
EIA-183/2010 |
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 23 Jun 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Jul 2010 to 26 Aug 2010. During the period, 4 set of written comments were received from members of the public.
- Approved with conditions on 28 Oct 2010.
- Register No.: AEIAR-156/2010
Link to other related information
|
EIA-182/2010 |
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
The Hong Kong and China Gas Company Limited |
- Applicant was informed on 14 June 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Jun 2010 to 22 Jul 2010. During the period, no comments were received from members of the public.
- Approved without conditions on 2 Aug 2010.
- Register No.: AEIAR-153/2010
Link to other related information
|
EIA-180/2010 |
Improvement of Fresh Water Supply to Cheung Chau
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 16 March 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Mar 2010 to 28 Apr 2010. During the period, no comments were received from members of the public.
- Approved without conditions on 4 May 2010.
- Register No.: AEIAR-151/2010
Link to other related information
|
EIA-178/2009 |
Black Point Gas Supply Project
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Castle Peak Power Co. Ltd. |
- Applicant was informed on 10 Feb 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Feb 2010 to 13 Mar 2010. During the period, no comments were received from members of the public.
- Approved with conditions on 27 Apr 2010.
- Register No.: AEIAR-150/2010
Link to other related information
|
EIA-177/2009 |
Development of a 100MW Offshore Wind Farm in Hong Kong
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 26 Jan 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Feb 2010 to 9 Mar 2010. During the period, 7 sets of written comments were received from members of the public.
- Approved with conditions on 14 May 2010.
- Register No.: AEIAR-152/2010
Link to other related information
|
EIA-176/2009 |
Organic Waste Treatment Facilities, Phase I
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 23 Dec 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2009 to 27 Jan 2010. During the period, no comments were received from members of the public.
- Approved with conditions on 24 Feb 2010.
- Register No.: AEIAR-149/2010
Link to other related information
|
EIA-175/2009 |
Road Works at West Kowloon
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 14 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Aug 2009 to 16 Sep 2009. During the period, 2 sets of written comment were received from members of the public.
- Approved with conditions on 23 Sep 2009.
- Register No.: AEIAR-141/2009
Link to other related information
|
EIA-174/2009 |
Tuen Mun - Chek Lap Kok Link
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 13 Aug 2009 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. During the period, 1377 sets of written comments were received from members of the public.
- Approved with conditions on 23 Oct 2009.
- Register No.: AEIAR-146/2009
Link to other related information
|
EIA-173/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordiance] [PDF]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. During the period, 1353 sets of written comments were received from members of the public.
- Approved with conditions on 23 Oct 2009.
- The Court of Appeal in the High Court allowed the Director's appeal on 27 Sep 2011.
- Register No.: AEIAR-145/2009
Link to other related information
|
EIA-172/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordiance] [PDF]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. During the period, 1362 sets of written comments were received from members of the public.
- Approved with conditions on 23 Oct 2009.
- The Court of Appeal in the High Court allowed the Director's appeal on 27 Sep 2011.
- Register No.: AEIAR-144/2009
Link to other related information
|
EIA-171/2009 |
West New Territories (WENT) Landfill Extensions
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 5 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Aug 2009 to 23 Sep 2009. During the period, 84 sets of written comments were received from members of the public.
- Approved with conditions on 20 Nov 2009.
- Register No.: AEIAR-147/2009
Link to other related information
|
EIA-170/2009 |
Provision of a Poultry Slaughtering Centre in Sheung Shui
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Architectural Services Department |
- Applicant was informed on 17 July 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 July 2009 to 20 Aug 2009. During the period, no comments were received from members of the public.
- Approved with conditions on 16 Sep 2009.
- Register No.: AEIAR-142/2009
Link to other related information
|
EIA-169/2009 |
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 15 July 2009 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 21 July 2009 to 19 Aug 2009. During the period, 53 sets of written comment were received from members of the public.
- Approved with conditions on 28 Sep 2009.
- Register No.: AEIAR-143/2009
- Amended Pages submitted by the applicant to fulfil the approval conditions
Link to other related information
|
EIA-167/2009 |
Hong Kong Offshore Wind Farm in Southeastern Waters
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
HK Offshore Wind Limited |
- Applicant was informed on 22 May 2009 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 3 Jun 2009 to 2 Jul 2009. During the period, 508 sets of written comment were received from members of the public.
- Approved with conditions on 3 Aug 2009.
- Register No.: AEIAR-140/2009
Link to other related information
|
EIA-166/2009 |
Decommissioning of the Co-Combustion Pilot Plant at Tap Shek Kok
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Green Island Cement Company Limited |
- Applicant was informed on 4 May 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 May 2009 to 13 Jun 2009. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 23 Jun 2009.
- Register No.: AEIAR-138/2009
Link to other related information
|
EIA-165/2009 |
Phased Reprovisioning of Cape Collinson Crematorium
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Food and Environmental Hygiene Department |
- Applicant was informed on 20 Apr 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Apr 2009 to 29 May 2009. During the period, 2 sets of written comment were received from members of the public.
- Approved without conditions on 8 Jun 2009.
- Register No.: AEIAR-137/2009
Link to other related information
|
EIA-164/2009 |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 28 Apr 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 May 2009 to 6 Jun 2009. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 26 Jun 2009.
- Register No.: AEIAR-139/2009
Link to other related information
|
EIA-163/2008 |
Hang Hau Tsuen Channel at Lau Fau Shan
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
New Territories North and West Development Office, Civil Engineering and Development Department |
- Applicant was informed on 3 Feb 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Feb 2009 to 6 Mar 2009. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 1 Apr 2009.
- Register No.: AEIAR-134/2009
Link to other related information
|
EIA-162/2008 |
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 6 Feb 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Feb 2009 to 21 Mar 2009. During the period, 1 set of written comment was received from members of the public.
- Approved with conditions on 15 Apr 2009.
- Register No.: AEIAR-135/2009
- Amended Pages submitted by the applicant to fulfil the approval conditions
Link to other related information
|
EIA-161/2008 |
Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Secretary for Security |
- Applicant was informed on 23 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 Feb 2009 to 3 Mar 2009. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 8 Apr 2009.
- Register No.: AEIAR-136/2009
Link to other related information
|
EIA-160/2008 |
Improvement to Pok Oi Interchange
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 13 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Jan 2009 to 20 Feb 2009. During the period, no comments were received from members of the public.
- Approved without conditions on 17 Mar 2009.
- Register No.: AEIAR-132/2009
Link to other related information
|
EIA-159/2008 |
Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 2 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jan 2009 to 13 Feb 2009. During the period, 5 sets of written comment were received from members of the public.
- Approved without conditions on 12 Mar 2009.
- Register No.: AEIAR-133/2009
Link to other related information
|
EIA-158/2008 |
Traffic Improvements to Tuen Mun Road Town Centre Section
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Highways Department |
- Applicant was informed on 12 Dec 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Dec 2008 to 22 Jan 2009. During the period, 22 sets of written comment were received from members of the public.
- Approved without conditions on 17 Feb 2009.
- Register No.: AEIAR-128/2009
Link to other related information
|
EIA-157/2008 |
Kai Tak Development
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 26 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 9 Dec 2008 to 7 Jan 2009. During the period, 4 sets of written comment were received from members of the public.
- Approved without conditions on 4 Mar 2009.
- Register No.: AEIAR-130/2009
Link to other related information
|
EIA-156/2008 |
Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
ASB Biodiesel (Hong Kong) Limited |
- Applicant was informed on 3 Dec 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 26 Feb 2009.
- Register No.: AEIAR-131/2009
Link to other related information
|
EIA-155/2008 |
Sludge Treatment Facilities
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 28 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009. During the period, 6 sets of written comment were received from members of the public.
- Approved with conditions on 19 Feb 2009.
- Register No.: AEIAR-129/2009
Link to other related information
|
EIA-154/2008 |
Tsim Sha Tsui Station Northern Subway
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 10 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2008 to 18 Dec 2008. During the period, 1 set of written comment was received from members of the public.
- Approved with conditions on 31 Dec 2008.
- Register No.: AEIAR-127/2008
Link to other related information
|
EIA-153/2008 |
West Island Line
[Executive Summary] | [PDF] | [HTML]
[EIA Report - Main Text] [PDF] | [HTML]
[EIA Report - Appendix] [PDF] | [HTML]
[EIA Report- Drawings] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
MTR Corporation Limited |
- Applicant was informed on 30 Sep 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Oct 2008 to 12 Nov 2008. During the period, 33 sets of comments comprising 273 nos. of submissions were received from members of the public.
- Approved with conditions on 23 Dec 2008.
- Register No.: AEIAR-126/2008
Link to other related information
|
EIA-152/2008 |
Tsuen Wan Bypass, widening of Tsuen Wan Road between Tsuen Tsing Interchange and Kwai Tsing Interchange, and associated junction improvement works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 30 Sep 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Oct 2008 to 11 Nov 2008. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 8 Dec 2008.
- Register No.: AEIAR-124/2008
Link to other related information
|
EIA-150/2008 |
Tuen Mun Area 54 Sewage Pumping Station
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Land Works Division, Civil Engineering Office, Civil Engineering and Development Department |
- Applicant was informed on 19 Aug 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Sep 2008 to 18 Oct 2008. During the period, no comments were received from members of the public.
- Approved without conditions on 12 Nov 2008.
- Register No.: AEIAR-122/2008
Link to other related information
|
EIA-149/2008 |
Proposed Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in D.D.123
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[EM&A Manual] [PDF] | [HTML] |
Mutual Luck Investment Limited |
- Applicant was informed on 14 Jul 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Aug 2008 to 6 Sep 2008. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 27 Nov 2009.
- Register No.: AEIAR-148/2009
Link to other related information
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Drainage Services Department |
- Applicant was informed on 18 June 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Aug 2008 to 10 Sep 2008. During the period, 1 set of written comments were received from members of the public.
- Approved without conditions on 30 Oct 2008.
- Register No.: AEIAR-121/2008
Link to other related information
|
EIA-146/2008 |
Provision of Cremators at Wo Hop Shek Crematorium
|
Food and Environmental Hygiene Department |
- Applicant was informed on 9 Apr 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 May 2008 to 31 May 2008. During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 24 Jun 2008.
- Register No.: AEIAR-119/2008
Link to other related information
|
EIA-145/2008 |
Upgrading of Pillar Point Sewage Treatment Works
|
Drainage Services Department |
- Applicant was informed on 3 Apr 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 10 Jun 2008.
- Register No.: AEIAR-118/2008
Link to other related information
|
EIA-144/2008 |
Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
|
Profit Point Enterprises Limited |
- Applicant was informed on 26 Mar 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008. During the period, 480 sets of written comments were received from members of the public.
- Approved with conditions on 31 Jul 2008.
- Register No.: AEIAR-120/2008
Link to other related information
|
EIA-143/2007 |
South East New Territories (SENT) Landfill Extension
|
Environmental Protection Department |
- Applicant was informed on 31 Jan 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Feb 2008 to 26 Mar 2008. During the period, 1001 sets of written comments were received from members of the public.
- Approved with conditions on 6 May 2008.
- Register No.: AEIAR-117/2008
Link to other related information
|
EIA-142/2007 |
Widening of Tuen Mun Road at Tsing Tin Interchange
|
Highways Department |
- Applicant was informed on 11 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Dec 2007 to 12 Jan 2008. During the period, no comments were received from members of the public.
- Approved without conditions on 23 Jan 2008.
- Register No.: AEIAR-116/2008
Link to other related information
|
EIA-141/2007 |
Wan Chai Development Phase II and Central-Wan Chai Bypass
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[Electronic visualization]
|
Civil Engineering and Development Department |
- Applicant was informed on 17 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Dec 2007 to 18 Jan 2008. During the period, 3 sets of written comments was received from members of the public.
- Approved with conditions on 11 Dec 2008.
- Register No.: AEIAR-125/2008
Link to other related information
|
EIA-140/2007 |
Development of a Bathing Beach at Lung Mei, Tai Po
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Nov 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2007 to 22 Dec 2007. During the period, 93 sets of written comments was received from members of the public.
- Approved with conditions on 21 Nov 2008.
- Register No.: AEIAR-123/2008
Link to other related information
|
EIA-139/2007 |
Decommissioning of the Former Kai Tak Airport Other than the North Apron
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov 2007. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 19 Dec 2007.
- Register No.: AEIAR-114/2007
Link to other related information
|
EIA-138/2007 |
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov 2007. During the period, 1 set of written comment was received from members of the public.
- Approved without conditions on 19 Dec 2007.
- Register No.: AEIAR-115/2007
Link to other related information
|
EIA-135/2007 |
Landslide Preventive Works at Po Shan, Mid-levels - Natural Terrain Risk Mitigation Measures
|
Geotechnical Engineering Office, Civil Engineering and Development Department |
- Applicant was informed on 15 Aug 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Aug 2007 to 26 Sep 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 22 Oct 2007.
- Register No.: AEIAR-112/2007
Link to other related information
|
EIA-134/2007 |
Harbour Area Treatment Scheme (HATS) - Provision of Disinfection Facilities at Stonecutters Island Sewage Treatment Works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[PDF]
|
Drainage Services Department |
- Applicant was informed on 19 Jul 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2007 to 14 Sep 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 8 Nov 2007.
- Register No.: AEIAR-113/2007
Link to other related information
|
EIA-133/2007 |
North East New Territories (NENT) Landfill Extension
|
Environmental Protection Department |
- Applicant was informed on 1 Jun 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jun 2007 to 24 Jul 2007. During the period, 227 sets of written comments were received from members of the public.
- Approved with conditions on 20 Sep 2007.
- Register No.: AEIAR-111/2007
Link to other related information
|
EIA-131/2007 |
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun
|
Water Supplies Department |
- Applicant was informed on 25 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Jun 2007 to 3 Jul 2007. During the period, no comments were received from members of the public.
- Approved without conditions on 31 Jul 2007.
- Register No.: AEIAR-109/2007
Link to other related information
|
EIA-130/2007 |
Drainage Improvement in Sha Tin and Tai Po
|
Drainage Services Department |
- Applicant was informed on 8 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2007 to 15 Jun 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 9 Aug 2007.
- Register No.: AEIAR-110/2007
Link to other related information
|
EIA-128/2007 |
Drainage Improvement in Northern New Territories - Package C
|
Drainage Services Department |
- Applicant was informed on 25 Apr 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 May 2007 to 1 Jun 2007. During the period, 3 sets of written comments were received from members of the public.
- Approved without conditions on 9 Jul 2007.
- Register No.: AEIAR-108/2007
Link to other related information
|
EIA-127/2006 |
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Airport Authority Hong Kong |
- Applicant was informed on 16 Feb 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Feb 2007 to 24 Mar 2007. During the period, 2658 sets of written comments were received from members of the public.
- Approved with conditions on 30 May 2007.
- Register No.: AEIAR-107/2007
Link to other related information
|
EIA-126/2006 |
Relocation of Yiu Lian Floating Dock No. 3
|
Yiu Lian Dockyards Limited |
- Applicant was informed on 19 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2006 to 27 Jan 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 23 Feb 2007.
- Register No.: AEIAR-104/2007
Link to other related information
|
EIA-125/2006 |
Liquefied Natural Gas (LNG) Receiving Terminal and Associated Facilities
|
Castle Peak Power Company Limited |
- Applicant was informed on 15 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Dec 2006 to 25 Jan 2007. During the period, 16392 sets of written comments were received from members of the public.
- Approved with conditions on 3 Apr 2007.
- Register No.: AEIAR-106/2007
Link to other related information
|
EIA-124/2006 |
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau
|
Castle Peak Power Company Limited |
- Applicant was informed on 1 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Dec 2006 to 12 Jan 2007. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 12 Mar 2007.
- Register No.: AEIAR-105/2007
Link to other related information
|
EIA-123/2006 |
Emissions Control Project at Castle Peak Power Station "B" Units
|
Castle Peak Power Company Limited |
- Applicant was informed on 15 Aug 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Aug 2006 to 17 Sep 2006. During the period, no comments were received from members of the public.
- Approved without conditions on 25 Oct 2006.
- Register No.: AEIAR-102/2006
Link to other related information
|
EIA-122/2006 |
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13
|
Drainage Services Department |
- Applicant was informed on 2 Aug 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2006 to 20 Sep 2006. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 24 Oct 2006.
- Register No.: AEIAR-103/2006
Link to other related information
|
EIA-121/2006 |
Repositioning and Long Term Operation Plan of Ocean Park
|
Ocean Park Corporation |
- Applicant was informed on 29 May 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Jun 2006 to 30 Jun 2006. During the period, no comments were received from members of the public.
- Approved without conditions on 12 Jul 2006.
|
EIA-120/2006 |
Hong Kong Convention and Exhibition Centre, Atrium Link Extension
|
Hong Kong Trade Development Council |
- Applicant was informed on 17 Mar 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Mar 2006 to 16 Apr 2006. During the period, no comments were received from members of the public.
- Approved without conditions on 21 Apr 2006.
|
EIA-119/2005 |
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
|
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 13 Feb 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2006 to 18 Mar 2006. During the period, no comments were received from members of the public.
- Approved without conditions on 24 Mar 2006.
|
EIA-118/2005 |
Main Arena of the 2008 Olympic Equestrian Event
|
The Hong Kong Jockey Club |
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006. During the period, 5 sets of written comments were received from members of the public.
- Approved without conditions on 24 Mar 2006.
|
EIA-116/2005 |
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun
[Executive Summary][PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
HGH Limited |
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 2 Mar 2006.
|
EIA-115/2005 |
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel
[Executive Summary][PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
Drainage Services Department |
- Applicant was informed on 26 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Feb 2006 to 14 Mar 2006. During the period, no comments were received from members of the public.
- Approved without conditions on 7 Apr 2006.
- Register No.: AEIAR-099/2006
Link to other related information
|
EIA-114/2005 |
Helipad at Yung Shue Wan, Lamma Island
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Civil Engineering and Development Department |
- Applicant was informed on 14 Nov 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2005 to 22 Dec 2005. During the period, 2 sets of written comments were received from members of the public.
|
EIA-113/2005 |
Expansion of Heliport Facilities at Macau Ferry Terminal
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Civil Aviation Department |
- Applicant was informed on 28 Oct 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Nov 2005 to 30 Nov 2005. During the period, 181 sets of written comments were received from members of the public.
|
EIA-112/2005 |
Proposed Extension of Public Golf Course at Kau Sai Chau Island, Sai Kung
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
The Hong Kong Jockey Club |
- Applicant was informed on 1 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Sep 2005 to 5 Oct 2005. During the period, 6 sets of written comments were received from members of the public.
- Approved without conditions on 14 Nov 2005.
- Register No.: AEIAR-091/2005
Link to other related information
|
EIA-111/2005 |
|
Civil Engineering and Development Department |
- Applicant was informed on 30 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Oct 2005 to 13 Nov 2005. During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 8 Dec 2005.
- Register No.: AEIAR-092/2005
Link to other related information
|
EIA-110/2005 |
Drainage Improvements in Southern Lantau
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Drainage Services Department |
- Applicant was informed on 15 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Sep 2005 to 25 Oct 2005. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 5 Dec 2005.
- Register No.: AEIAR-093/2005
Link to other related information
|
EIA-109/2005 |
Road P1 Advance Works at Yam O on Lantau Island
[Executive Summary] [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
Civil Engineering and Development Department |
- Applicant was informed on 30 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 6 Sep 2005.
- Register No.: AEIAR-090/2005
Link to other related information
|
EIA-108/2005 |
Drainage Improvement in Tsuen Wan, Kwai Chung and Tsing Yi, Tsuen Wan Drainage Tunnel
[Executive Summary] [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
Drainage Services Department |
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 July 2005 to 31 July 2005. During the period, no comments were received from members of the public.
- Approved without conditions on 29 Aug 2005.
- Register No.: AEIAR-088/2005
Link to other related information
|
EIA-107/2005 |
Peng Chau Helipad
[Executive Summary] [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
Civil Engineering and Development Department |
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005. During the period, no comments were received from members of the public.
- Approved without conditions on 25 Aug 2005.
- Register No.: AEIAR-087/2005
Link to other related information
|
EIA-106/2005 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area
[Executive Summary] [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 19 May 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 May 2005 to 25 June 2005. During the period, 7 sets of written comments were received from members of the public.
- Approved without conditions on 1 Sep 2005.
- Register No.: AEIAR-089/2005
Link to other related information
|
EIA-104/2005 |
Development of an EcoPark in Tuen Mun Area 38
[Executive Summary] [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Environmental Protection Department |
- Applicant was informed on 27 April 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 April 2005 to 28 May 2005. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 29 June 2005.
- Register No.: AEIAR-086/2005
Link to other related information
|
EIA-103/2004 |
Trunk Road T4 in Sha Tin
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML] |
Civil Engineering and Development Department |
- Applicant was informed on 25 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 March 2005 to 6 April 2005. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 3 May 2005.
- Register No.: AEIAR-084/2005
Link to other related information
|
EIA-101/2004 |
Drainage Improvements in Sai Kung
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 16 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 March 2005 to 30 March 2005. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 20 Apr 2005.
- Register No.: AEIAR-085/2005
Link to other related information
|
EIA-100/2004 |
Siu Ho Wan Water Treatment Works Extension
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Water Supplies Department |
- Applicant was informed on 15 Oct 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2004 to 23 Nov 2004. During the period, no comments were received from members of the public.
- Approved without conditions on 15 Dec 2004.
- Register No.: AEIAR-082/2004
Link to other related information
|
EIA-099/2004 |
Renewable Energy by a Wind Turbine System on Lamma Island
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
The Hongkong Electric Co. Ltd. |
- Applicant was informed on 6 Sep 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sept 2004 to 9 Oct 2004. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 27 Oct 2004.
- Register No.: AEIAR-080/2004
Link to other related information
|
EIA-098/2004 |
Kowloon Southern Link
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 7 Sep 2004 of the suitability of the report for public inspection..
- Report was exhibited for public to comment from 18 Jan 2005 to 16 Feb 2005. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 30 Mar 2005.
- Register No.: AEIAR-083/2005
Link to other related information
|
EIA-097/2004 |
Tai Po Sewage Treatment Works Stage V
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 26 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 03 Sept 2004 to 02 Oct 2004. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 28 Oct 2004.
- Register No.: AEIAR-081/2004
Link to other related information
|
EIA-096/2004 |
Peng Chau Sewage Treatment Works Upgrade
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 24 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Sept 2004 to 30 Sept 2004. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 29 Oct 2004.
- Register No.: AEIAR-079/2004
Link to other related information
|
EIA-094/2004 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 2
[Executive Summary][PDF] | [HTML]
[EIA Report][PDF] | [HTML]
[EM&A Manual][PDF] | [HTML] |
Drainage Services Department |
- Applicant was informed on 17 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Apr 2004 to 22 May 2004. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 17 Jun 2004.
- Register No.: AEIAR-078/2004
Link to other related information
|
EIA-093/2004 |
Improvements to San Tin Interchange
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Highways Department |
- Applicant was informed on 1 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Mar 2004 to 7 Apr 2004. During the period, no comments were received from members of the public.
- Approved without conditions on 3 May 2004.
- Register No.: AEIAR-077/2004
Link to other related information
|
EIA-092/2003 |
Reprovisioning of Diamond Hill Crematorium
[Executive Summary][HTML] | [PDF]
[EIA Report] [HTML] | [PDF]
[EM&A Manual] [HTML] | [PDF] |
Architectural Services Department |
- Applicant was informed on 5 Jan 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Jan 2004 to 10 Feb 2004. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions on 30 Mar 2004.
- Register No.: AEIAR-076/2004
Link to other related information
|
EIA-091/2003 |
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities
[Executive Summary][HTML] | [PDF]
[EIA Report] [HTML] | [PDF]
[EM&A Manual] [HTML] | [PDF] |
Drainage Services Department |
- Applicant was informed on 23 Jun 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2003 to 20 Sep 2003. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 25 Oct 2003.
- Register No.: AEIAR-075/2003
Link to other related information
|
EIA-090/2003 |
Tung Chung - Ngong Ping Cable Car Project
[Executive Summary]
[EIA Report]
[EM&A Manual] |
MTR Corporation Limited |
- Applicant was informed on 27 Mar 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2003 to 27 Apr 2003. During the period, 11 sets of written comments were received from members of the public.
- Approved with conditions on 9 Jun 2003.
- Register No.: AEIAR-074/2003
Link to other related information
|
EIA-089/2003 |
The Proposed Submarine Gas Pipelines from Cheng Tou Jiao Liquefied Natural Gas Receiving Terminal, Shenzhen to Tai Po Gas Production Plant, Hong Kong
[Executive Summary]
[EIA Report]
[EM&A Manual] |
The Hong Kong and China Gas Company Limited |
- Applicant was informed on 27 Feb 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Mar 2003 to 3 Apr 2003. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 23 Apr 2003.
- Register No.: AEIAR-071/2003
Link to other related information
|
EIA-088/2002 |
Lamma Power Station Navigation Channel Improvement
[Executive Summary] (html) | (pdf)
[EIA Report] (html) | (pdf)
[EM&A Manual] (html) | (pdf) |
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 18 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jan 2003 to 23 Feb 2003. During the period, no comments were received from members of the public.
- Approved without conditions on 11 Mar 2003.
- Register No.: AEIAR-069/2003
Link to other related information
|
EIA-087/2002 |
Cement Silos addition work in Tai Po Cement Depot
[Executive Summary] (html) | (pdf)
[EIA Report] (html) | (pdf) |
K.WAH MATERIALS LTD. |
- Applicant was informed on 14 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Jan 2003 to 15 Feb 2003. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 13 May 2003.
- Register No.: AEIAR-073/2003
Link to other related information
|
EIA-086/2002 |
Upgrading and expansion of San Wai Sewage Treatement Works and expansion of Ha Tsuen Pumping Station
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Drainage Services Department |
- Applicant was informed on 23 Dec 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Feb 2003 to 26 Mar 2003. During the period, no comments were received from members of the public.
- Approved without conditions on 12 May 2003.
- Register No.: AEIAR-072/2003
Link to other related information
|
EIA-085/2002 |
Proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun
[Executive Summary] (html) | (pdf)
[EIA Report] (html) | (pdf)
[EM&A Manual] (html) | (pdf) |
Architectural Services Department |
- Applicant was informed on 30 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2002 to 18 Dec 2002. During the period, 1071 sets of written comments were received from members of the public.
- Approved with conditions on 14 Mar 2003.
- Register No.: AEIAR-070/2003
Link to other related information
|
EIA-083/2002 |
Feasibility Study for Housing Development at Whitehead & Lee On in Ma On Shan
[Executive Summary] (html) | (pdf)
[EIA Report] (html) | (pdf)
[EM&A Manual] (html) | (pdf) |
Territory Development Department |
- Applicant was informed on 18 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Oct 2002 to 29 Nov 2002. During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 18 Dec 2002.
- Register No.: AEIAR-068/2002
Link to other related information
|
EIA-082/2002 |
Shenzhen Western Corridor
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Highways Department |
- Applicant was informed on 9 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Sep 2002 to 10 Oct 2002. During the period, 1 set of written comment was received from members of the public.
- Approved with conditions on 4 Nov 2002.
- Register No.: AEIAR-067/2002
Link to other related information
|
EIA-081/2002 |
Construction of Lung Kwu Chau Jetty
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A Manual] [PDF] | [HTML]
|
Civil Engineering Department |
- Applicant was informed on 19 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2002 to 27 Oct 2002. During the period, no comments were received from members of the public.
- Approved with conditions on 1 Nov 2002.
- Register No.: AEIAR-066/2002
Link to other related information
|
EIA-079/2002 |
Ngong Ping Sewage Treatment Works and Sewerage
[Executive Summary] (pdf) | (html)
[EIA Report] (pdf) | (html)
[EM&A Manual] (pdf) | (html) |
Drainage Services Department |
- Applicant was informed on 29 Aug 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2002 to 28 Sep 2002. During the period, 3 sets of written comments were received from members of the public.
- Approved without conditions on 12 Nov 2002.
- Register No.: AEIAR-065/2002
Link to other related information
|
EIA-078/2002 |
Deep Bay Link
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Highways Department |
- Applicant was informed on 10 Jul 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Jul 2002 to 21 Aug 2002. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions on 13 Sep 2002.
- Register No.: AEIAR-064/2002
Link to other related information
|
EIA-077/2002 |
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Airport Authority Hong Kong |
The Court of Final Appeal ordered on 17 Jul 2006 that the decision of the Director made on 2 Aug 2002 approving the EIA report be quashed.
Link to other related information
|
EIA-076/2002 |
Fill Bank at Tseung Kwan O Area 137
[Executive Summary] (pdf) | (html)
[EIA Report] (pdf) | (html)
[EM&A Manual] (pdf) |
Civil Engineering Department |
- Applicant was informed on 8 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 May 2002 to 14 Jun 2002. During the period, no comments were received from members of the public.
- Approved without conditions on 27 Jun 2002.
- Register No.: AEIAR-060/2002
Link to other related information
|
EIA-075/2002 |
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Highways Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 May 2002 to 12 Jun 2002. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 4 Jul 2002.
- Register No.: AEIAR-061/2002
Link to other related information
|
EIA-074/2002 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 1 Packages 1A-1T and 1B-1T - Kam Tin Trunk Sewerage Phase I and II
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Drainage Services Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Jun 2002 to 10 Jul 2002. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 26 Aug 2002.
- Register No.: AEIAR-063/2002
Link to other related information
|
EIA-073/2001 |
Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay
[Executive Summary]
[EIA Report] |
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002. During the period, no comments were received from members of the public.
- Approved with conditions on 8 Apr 2002.
- Register No.: AEIAR-054/2002
Link to other related information
|
EIA-072/2001 |
Decommissioning of Cheoy Lee Shipyard at Penny's Bay
[Executive Summary] (pdf) | (html)
[EIA Report] (pdf) | (html) |
Civil Engineering Department |
- Applicant was informed on 9 Feb 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 21 Feb 2002 to 22 Mar 2002. During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 24 Apr 2002.
- Register No.: AEIAR-055/2002
Link to other related information
|
EIA-071/2001 |
Sheung Shui to Lok Ma Chau Spur Line
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 2 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Jan 2002 to 5 Feb 2002. During the period, 87 sets of written comments were received from members of the public.
- Approved with conditions on 11 Mar 2002.
- Register No.: AEIAR-052/2002
Link to other related information
|
EIA-069/2001 |
Reclamation of Yau Tong Bay
[Executive Summary]
[EIA Report] |
Maunsell Consultants Asia Limited |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002. During the period, no comments were received from members of the public.
- Approved with conditions on 8 Apr 2002.
- Register No.: AEIAR-053/2002
Link to other related information
|
EIA-068/2001 |
Planning and Engineering Feasibility Study for Sham Tseng Development
[Executive Summary]
[EIA Report] |
Civil Engineering Department |
- Applicant was informed on 10 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jan 2002 to 23 Feb 2002. During the period, 184 sets of written comments were received from members of the public.
- Approved with conditions on 2 May 2002.
- Register No.: AEIAR-057/2002
Link to other related information
|
EIA-067/2001 |
Widening of Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 22 May 2002.
- Register No.: AEIAR-059/2002
Link to other related information
|
EIA-066/2001 |
The Decommissioning of Underground Fuel Tanks at Tsuen Wan No.1 Pumping Station
[Executive Summary]
[EIA Report] |
Water Supplies Department |
- Applicant was informed on 13 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 22 Dec 2001 to 20 Jan 2002. During the period, no comments were received from members of the public.
- Approved with conditions on 9 Feb 2002.
- Register No.: AEIAR-050/2002
Link to other related information
|
EIA-065/2001 |
132 KV Supply Circuit from Pui O via Chi Ma Wan Peninsula via Sea Crossing towards Cheung Chau
[Executive Summary]
[EIA Report] |
CLP Power Hong Kong Limited |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 28 Feb 2002.
- Register No.: AEIAR-051/2002
Link to other related information
|
EIA-064/2001 |
Demolition of Buildings and Structures in the Proposed Kennedy Town Comprehensive Development Area Site
[Executive Summary]
[EIA Report] |
Civil Engineering Department |
- Applicant was informed on 20 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Dec 2001 to 5 Jan 2002. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 16 Apr 2002.
- Register No.: AEIAR-058/2002
Link to other related information
|
EIA-063/2001 |
Replacement of Cremators at Fu Shan Crematorium
[Executive Summary]
[EIA Report] |
Architectural Services Department |
- Applicant was informed on 9 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 Nov 2001 to 23 Dec 2001. During the period, no comments were received from members of the public.
- Approved with conditions on 4 Jan 2002.
- Register No.: AEIAR-048/2002
Link to other related information
|
EIA-062/2001 |
Demolition of Kwai Chung Incineration Plant
[Executive Summary]
[EIA Report] |
Civil Engineering Department |
- Applicant was informed on 13 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Nov 2001 to 19 Dec 2001. During the period, no comments were received from members of the public.
- Approved with conditions on 9 Jan 2002.
- Register No.: AEIAR-049/2002
Link to other related information
|
EIA-061/2001 |
Tseung Kwan O Roads D1, D8 and D10
[Executive Summary] (pdf) | (html)
[EIA Report] |
Territory Development Department |
- Applicant was informed on 11 Oct 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2001 to 16 Nov 2001. During the period, no comments were received from members of the public.
- Approved with conditions on 23 Nov 2001.
- Register No.: AEIAR-046/2001
Link to other related information
|
EIA-060/2001 |
Proposed Headquarters and Bus Maintenance Depot in Chai Wan
[Executive Summary]
[EIA Report] |
Citybus Limited |
- Applicant was informed on 11 Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2001 to 14 Sep 2001. During the period, no comments were received from members of the public.
- Approved with conditions on 26 Sep 2001.
- Register No.: AEIAR-045/2001
Link to other related information
|
EIA-059/2001 |
Comprehensive Feasibility Study for The Revised Scheme of South East Kowloon Development
[Executive Summary]
[EIA Report] |
Territory Development Department |
- Applicant was informed on 30 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 July 2001 to 29 Aug 2001. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 25 Sep 2001.
- Register No.: AEIAR-044/2001
Link to other related information
|
EIA-058/2001 |
Wanchai Development phase II
[Executive Summary] (html)
[EIA Report] |
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 31 Aug 2001.
- Register No.: AEIAR-042/2001
Link to other related information
|
EIA-057/2001 |
Central - Wan Chai Bypass and Island Eastern Corridor Link
[Executive Summary] (html)
[EIA Report] |
Highways Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 31 Aug 2001.
- Register No.: AEIAR-041/2001
Link to other related information
|
EIA-056/2001 |
Lei Yue Mun Road Underpass, Modification at Junction with Yau Tong Road and Associated Improvement Works - Feasibility Study
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 6 Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2001 to 27 Oct 2001. During the period, 1236 sets of written comments were received from members of the public.
- Approved with conditions on 21 Feb 2002.
- Register No.: AEIAR-056/2001
Link to other related information
|
EIA-055/2001 |
Central Reclamation Phase III - Studies, Site Investigation, Design and Construction
[Executive Summary] (html)
[EIA Report]
[EM&A Manual] |
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001. During the period, no comments were received from members of the public.
- Approved with conditions on 31 Aug 2001.
- Register No.: AEIAR-040/2001
Link to other related information
|
EIA-054/2001 |
Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 31 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Aug 2001 to 15 Sep 2001. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions on 5 Dec 2001.
- Register No.: AEIAR-047/2001
Link to other related information
|
EIA-053/2001 |
Modifications to MTRC Tsim Sha Tsui Station
[Executive Summary] (html)
[EIA Report]
[EM&A Manual] |
MTR Corporation Limited |
- Applicant was informed on 12 Jul 2001 of the suitability of the report for public inspection.
- Report was informed for public to comment from 20 July 2001 to 18 Aug 2001. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 12 Sep 2001.
- Register No.: AEIAR-043/2001
Link to other related information
|
EIA-049/2000 |
West Kowloon Reclamation Contract No. WK30-Remaining Roadworks Stage 4, Link Roads G & L
[Executive Summary]
[EIA Report] |
Kowloon Development Office, Territory Development Department |
- Applicant was informed on 31 Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 2000 to 14 Dec 2000. During the period, no comments were received from members of the public.
- Approved with conditions on 10 Jan 2001.
- Register No.: AEIAR-038/2001
Link to other related information
|
EIA-047/2000 |
Proposed RMC Concrete Batching Plant at Telegraph Bay for Cyber-Port Development
[Executive Summary] (pdf) | (html)
[EIA Report] |
Cyber-Port Limited |
- Applicant was informed on 21 Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Nov 2000 to 13 Dec 2000. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 15 Jan 2001.
- Register No.: AEIAR-039/2001
Link to other related information
|
EIA-043/2000 |
Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling - Environmental Impact Assessment
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 17 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 May 2000 to 24 Jun 2000. During the period, no comments were received from members of the public.
- Approved with conditions on 14 Jul 2000.
- Register No.: AEIAR-037/2000
Link to other related information
|
EIA-042/2000 |
Tai O Sheltered Boat Anchorage - Environmental & Drainage Impact Assessment - Environmental Impact Assessment
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Civil Engineering Department |
- Applicant was informed on 08 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 May 2000 to 22 Jun 2000. During the period, no comments were received from members of the public.
- Approved with conditions on 12 Jul 2000.
- Register No.: AEIAR-036/2000
Link to other related information
|
EIA-041/2000 |
Construction of an International Theme Park in Penny's Bay of North Lantau together with its Essential Associated Infrastructures - Environmental Impact Assessment
[Executive Summary] (pdf)
[EIA Report] |
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000. During the period, 7 sets of written comments were received from members of the public.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000.
- Register No.: AEIAR-032/2000
Link to other related information
|
EIA-040/2000 |
Northshore Lantau Development Feasibility Study - Environmental Impact Assessment
[Executive Summary] (pdf)
[EIA Report] |
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000. During the period, 5 sets of written comments were received from members of the public.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000.
- Register No.: AEIAR-031/2000
Link to other related information
|
EIA-039/2000 |
Shenzhen River Regulation Project Stage III - Environmental Impact Assessment
[Executive Summary]
[EIA Report] |
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Apr 2000 to 10 May 2000. During the period, no comments were received from members of the public.
- Approved with conditions on 8 Jun 2000.
- Register No.: AEIAR-035/2000
Link to other related information
|
EIA-038/2000 |
Tuen Mun Sewerage - Eastern coastal Sewerage Extension - Environmental Impact Assessment
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Apr 2000 to 12 May 2000. During the period, no comments were received from members of the public.
- Approved with conditions on 7 June 2000.
- Register No.: AEIAR-034/2000
Link to other related information
|
EIA-036/1999 |
East Rail - Extension - Hung Hom To Tsim Sha Tsui - Environmental Impact Assessment
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 27 Jan 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Feb 2000 to 23 Mar 2000. During the period, 6 sets of written comments were received from members of the public.
- Approved with conditions on 24 May 2000.
- Register No.: AEIAR-033/2000
Link to other related information
|
EIA-034/1999 |
New World First Bus Permanent Depot at Chai Wan
[Executive Summary]
[EIA Report] |
New World First Bus Services Limited |
- Applicant was informed on 09 Dec 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Dec 1999 to 12 Jan 2000. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions on 25 Jan 2000.
- Register No.: AEIAR-029/2000
Link to other related information
|
EIA-033/1999 |
Route 10 North Lantau to Yuen Long Highway Investigation and Preliminary Design (Southern Section)
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 23 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Nov 1999 to 29 Dec 1999. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions on 02 Feb 2000.
- Register No.: AEIAR-030/2000
Link to other related information
|
EIA-031/1999 |
Light Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone and Grade Separation of the LRT with Pui To Road and Tsing Lung Road in Tuen Mun
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 06 Jan 2000.
- Register No.: AEIAR-027/1999
Link to other related information
|
EIA-030/1999 |
Tin Shui Wai Phase 4 Rail Extension
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 06 Jan 2000.
- Register No.: AEIAR-026/1999
Link to other related information
|
EIA-029/1999 |
132 kV Overhead Pole Line & Underground Cable from the Existing Po Lam Substation to the Existing Tui Min Hoi Substation - Circuit No.2
[Executive Summary]
[EIA Report] |
CLP Power Hong Kong Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 05 Nov 1999 to 04 Dec 1999. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 22 Dec 1999.
- Register No.: AEIAR-023/1999
Link to other related information
|
EIA-028/1999 |
Hebe Haven Yacht Club Development - Phase 2 Environmental Impact Assessment Study
[Executive Summary]
[EIA Report] |
Halcrow China Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 1999 to 14 Dec 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 03 Jan 2000.
- Register No.: AEIAR-024/1999
Link to other related information
|
EIA-027/1999 |
East Rail Extensions - Tai Wai to Ma On Shan
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 19 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Oct 1999 to 18 Nov 1999. During the period, 11 sets of written comments were received from members of the public.
- Approved with conditions on 15 Jan 2000.
- Register No.: AEIAR-028/1999
Link to other related information
|
EIA-026/1999 |
Essential Public Infrastructure Works with West Rail Stations (the Eastern Access Road)
[Executive Summary]
[EIA Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 30 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 02 Oct 1999 to 31 Oct 1999. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 28 Dec 1999.
- Register No.: AEIAR-025/1999
Link to other related information
|
EIA-025/1999 |
Route 9 between Tsing Yi and Cheung Sha Wan
[Executive Summary]
[EIA Report] |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Aug 1999 to 21 Sep 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 19 Oct 1999.
- Register No.: AEIAR-018/1999
Link to other related information
|
EIA-024/1999 |
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 09 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Sep 1999 to 14 Oct 1999. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 19 Nov 1999.
- Register No.: AEIAR-020/1999
Link to other related information
|
EIA-023/1999 |
Tseung Kwan O Development - Contract F: Grade Separated Interchange T1/P1/P2
[Executive Summary]
[EIA Report] |
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 31 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 20 Oct 1999.
- Register No.: AEIAR-017/1999
Link to other related information
|
EIA-022/1999 |
Sha Tin Sewage Treatment Works, Stage III Extension - Environmental Impact Assessment Study
[Executive Summary]
[EIA Report] |
Drainage Services Department |
- Applicant was informed on 03 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 17 Sep 1999 to 16 Oct 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 05 Nov 1999.
- Register No.: AEIAR-021/1999
Link to other related information
|
EIA-021/1999 |
Feasibility Study on the Alternative Alignment for the Western Coast Road, Tseung Kwan O
[Executive Summary]
[EIA Report] |
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 01 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 20 Oct 1999.
- Register No.: AEIAR-016/1999
Link to other related information
|
EIA-020/1999 |
Route 16 Investigation Assignment from West Kowloon to Sha Tin - Alternative Alignment Environmental Impact Assessment
[Executive Summary]
[EIA Report] |
Major Works Project Management Office, Highways Department |
- Applicant was informed on 30 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 03 Sep 1999 to 02 Oct 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 05 Nov 1999.
- Register No.: AEIAR-022/1999
Link to other related information
|
EIA-018/1999 |
Sai Sha Road Widening between Kam Ying Road and proposed Road T7 Junction
[Executive Summary]
[EIA Report] |
Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 27 Aug 1999 to 25 Sep 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 19 Oct 1999.
- Register No.: AEIAR-014/1999
Link to other related information
|
EIA-017/1999 |
Essential Public Infrastructure Works associated with West Rail Stations in Yuen Long Tin Shui Wai and Tuen Mun Centre
[Executive Summary]
[EIA Report](June 1999)
[EM&A Manual]
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 22 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jun 1999 to 24 Jul 1999. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions on 20 Aug 1999.
- Register No.: AEIAR-012/1999
Link to other related information
|
EIA-016/1999 |
EIA for Salisbury Road Underpass and Associated Road Improvement Works (including Middle Road Circulation System)
[Executive Summary]
[EIA Report](June 1999) |
Highways Department |
- Applicant was informed on 21 Jun 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Jun 1999 to 29 Jul 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 26 Aug 1999.
- Register No.: AEIAR-013/1999
Link to other related information
|
EIA-015/1999 |
Planning and Development Study of Potential Housing Site in Area 54, Tuen Mun
[Executive Summary]
[EIA Report](June 1999) |
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 24 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 09 Jul 1999 to 08 Aug 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 03 Sep 1999.
- Register No.: AEIAR-015/1999
Link to other related information
|
EIA-014/1999 |
Main Drainage Channels and Poldered Village Protection Schemes for San Tin, NWNT EIA Study
[Executive Summary]
[EIA Report](April 1999) |
N.T. North Development Office, Territory Development Department |
- Applicant was informed on 04 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Jun 1999 to 13 Jul 1999. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions on 14 Sep 1999.
- Register No.: AEIAR-019/1999
Link to other related information
|
EIA-013/1999 |
Tang Lung Chau Dangerous Goods Anchorage
[Executive Summary]
[EIA Report] |
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 20 May 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 01 Jun 1999 to 30 Jun 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 17 Jul 1999.
- Register No.: AEIAR-011/1999
Link to other related information
|
EIA-011/1999 |
Infrastructural Works for the Proposed Development at Telegraph Bay - Engineering Feasibility Study
[Executive Summary]
[EIA Report] (March 1999) |
Information Technology and Broadcasting Bureau of the Government for the Hong Kong Special Administrative Region Department |
- Applicant was informed on 09 Mar 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Mar 1999 to 10 Apr 1999. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 26 Apr 1999.
- Register No.: AEIAR-009/1999
Link to other related information
|
EIA-009/1998 |
1,800 MW Gas-fired Power Station at Lamma Extension
[Executive Summary]
[EIA Report] (February 1999)
[EM&A Manual]
|
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 19 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 05 Mar 1999 to 03 Apr 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 05 May 1999.
- Register No.: AEIAR-010/1999
Link to other related information
|
EIA-008/1998 |
Planning and Engineering Feasibility Study for Development near Choi Wan Road and Jordan Valley
[Executive Summary]
[EIA Report] (January 1999) |
Civil Engineering Department |
- Applicant was informed on 09 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Feb 1999 to 15 Mar 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 20 Apr 1999.
- Register No.: AEIAR-008/1999
Link to other related information
|
EIA-007/1998 |
Footbridge and Improvement to Ap Lei Chau Bridge Road and Ap Lei Chau Drive
[Executive Summary]
[EIA Report]
(January 1999)
[EM&A Manual]
|
Highways Department |
- Applicant was informed on 04 Jan 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 08 Jan 1999 to 06 Feb 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 24 Feb 1999.
- Register No.: AEIAR-005/1999
Link to other related information
|
EIA-006/1998 |
Dredging an Area of Kellett Bank for Reprovisioning of Six Government Mooring Buoys
[Executive Summary]
[EIA Report]
(December 1998) |
Civil Engineering Department |
- Applicant was informed on 28 Nov 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 8 Jan 1999. During the period, 1 set of written comments was received from members of the public.
- Approved without conditions on 01 Mar 1999.
- Register No.: AEIAR-006/1999
Link to other related information
|
EIA-005/1998 |
Planning and Engineering Feasibility Study for Development at Anderson Road
[Executive Summary]
[EIA Report]
(September 1998)
[EM&A Manual] |
Civil Engineering Department |
- Applicant was informed on 04 Dec 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 08 Jan 1999. During the period, no comments were received from members of the public.
- Approved with conditions on 02 Mar 1999.
- Register No.: AEIAR-007/1999
Link to other related information
|
EIA-004/1998 |
Yuen Long Bypass Floodway - Feasibility Study
[Executive Summary]
[EIA Report]
[Ecological Reassessment Report]
[EM&A Manual] |
Territory Development Department |
- Applicant was informed on 31 Jul 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 14 Aug 1998 to 12 Sep 1998. During the period, no comments were received from members of the public.
- Approved without condition on 10 Oct 1998.
- Register No.: AEIAR-003/1998
Link to other related information
|
EIA-003/1998 |
Kai Tak Airport North Apron Decomissioning
[Executive Summary]
[EIA Report]
[EM&A Manual] |
Territory Development Department |
- Applicant was informed on 25 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 03 Jul 1998 to 02 Aug 1998. During the period, 1 set of written comments was received from members of the public.
- Approved with conditions on 04 Sep 1998.
- Register No.: AEIAR-002/1998
Link to other related information
|
EIA-002/1998 |
Tsuen Wan Bay Further Reclamation, Area 35, Tsuen Wan Engineering, Planning and Environmental Investigation
[Executive Summary]
[EIA Report]
[EM&A Manual]
|
N.T. West Development Office |
- Applicant was informed on 15 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 25 Sep 1998 to 24 Oct 1998. During the period, no comments were received from members of the public.
- Approved with conditions on 24 Nov 1998.
- Register No.: AEIAR-004/1998
Link to other related information
|
EIA-001/1998 |
Pak Shek Kok Development
[Executive Summary]
[EIA Report]
[EM&A Manual]
|
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15 Jun 1998 on the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 19 Jun 1998 to 18 Jul 1998. During the period, no comments were received from members of the public.
- Approved with conditions on 10 Aug 1998.
- Register No.: AEIAR-001/1998