DIR-163/2007 |
Reuse of Treated Sewage Effluent from Redeveloped Lo Wu Correctional Institution for Toilet Flushing
(* Withdrawn by Applicant on 4 Jan 2008*) |
Section 5(11) |
Architectural Services Department |
28 Dec 2007 |
Not
Applicable |
DIR-162/2007 |
Landslip
Preventive Works at Feature No. 3SE-B/C156 Along Bride's Pool Road, Near Chung
Mei Plover Cove Reservoir, Tai Po |
Section 5(11) |
Geotechnical Engineering Office, Civil
Engineering and Development Department |
21 Dec 2007 |
22 Dec 2007 to 4 Jan 2008 |
DIR-161/2007 |
Tai
Po Tai Wo Road Sewage Pumping Station |
Section 5(11) |
Drainage Services Department |
9 Nov 2007 |
10 Nov 2007 to 23 Nov 2007 |
DIR-160/2007 |
Asia-America Gateway (AAG) Cable Network, South Lantau |
Section 5(11) |
Reach Networks Hong Kong Ltd. |
5 Oct 2007 |
6 Oct 2007 to 19 Oct 2007 |
DIR-159/2007 |
Restoration to Chik Kwai Study Hall Sheung Tsuen, Pat Heung, Yuen Long |
Section 5(11) |
Antiquities and Monuments Office, Leisure and Cultural Services Department
|
3 Oct 2007 |
4 Oct 2007 to 17 Oct 2007 |
DIR-158/2007 |
Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate |
Section 5(11) |
ASB Biodiesel (Hong Kong) Limited
|
27 Sep 2007 |
28 Sep 2007 to 11 Oct 2007 |
DIR-157/2007 |
Extension of Ma On Shan Salt Water Service Reservoir - Construction of Ma On Shan No.3 Salt Water Service Reservoir |
Section 5(10) |
Water Supplies Department
|
11 Sep 2007 |
12 Sep 2007 to 25 Sep 2007 |
DIR-156/2007 |
Operation of Shenzhen Section of Shenzhen Bay Bridge |
Section 5(9) |
Major Works Project Management Office, Highways Department
|
3 Sep 2007 |
4 Sep 2007 to 17 Sep 2007 |
DIR-155/2007 |
VSNL Intra Asia Submarine Cable System - Deep Water Bay |
Section 5(11) |
Videsh Sanchar Nigam Ltd.
|
31 Aug 2007 |
1 Sep 2007 to 14 Sep 2007 |
DIR-154/2007 |
TETRA Radio Base Station at Yuen Ng Fan, Sai Kung |
Section 5(11) |
CLP Power Hong Kong Limited
|
29 Aug 2007 |
30 Aug 2007 to 12 Sep 2007 |
DIR-153/2007 |
Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project |
Section 5(10) |
The Hong Kong Electric Co. Ltd.
|
24 Jul 2007 |
25 Jul 2007 to 7 Aug 2007 |
DIR-152/2007 |
Proposed Installation of Integrated Mobile Phone Base Station at Shek Pik Fire Lookout, Lantau Island, N.T. |
Section 5(11) |
Hong Kong CSL Limited
|
17 Jul 2007 |
18 Jul 2007 to 31 Jul 2007 |
DIR-151/2007 |
Proposed Installation of Integrated Mobile Phone Base Station at Tai Long Au, Sai Kung East Country Park, Tai Po, N.T. |
Section 5(11) |
Hong Kong CSL Limited
|
25 Apr 2007 |
26 Apr 2007 to 9 May 2007 |
DIR-150/2007 |
Reprovisioning and Upgrading of Salt Water Service Reservoirs in Western District for Water Supplies Department |
Section 5(11) |
The University of Hong Kong
|
3 Apr 2007 |
4 Apr 2007 to 17 Apr 2007 |
DIR-149/2007 |
Decommissioning and Disposal of Clinical Waste Incinerator at Wai Oi Block of Caritas Medical Centre |
Section 5(11) |
Hospital Authority (Caritas Medical Centre)
|
22 Mar 2007 |
23 Mar 2007 to 5 Apr 2007 |
DIR-148/2007 |
Proposed Installation of Integrated Mobile Phone Base Station at South Lantau Island Country Park, Man Cheung Po, Tai O, Hong Kong |
Section 5(11) |
SmartTone Mobile Communications Ltd.
|
2 Mar 2007 |
6 Mar 2007 to 19 Mar 2007 |
DIR-147/2007 |
Upgrading of Quarantine Stables for the 2008 Olympic Equestrian Event |
Section 5(10) |
Hong Kong Jockey Club
|
21 Feb 2007 |
22 Feb 2007 to 7 Mar 2007 |
DIR-146/2007 |
Dredging at Seabed of Peng Chau, Tung Wan |
Section 5(11) |
Civil Engineering
and Development
Department |
11 Jan 2007 |
12 Jan 2007 to 25 Jan 2007 |