TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.        INTRODUCTION

Background

Scope of Report

Project Organization

Summary of Construction Works

Summary of EM&A Requirements

2.        AIR QUALITY

3.        NOISE MONITORING

4.        WATER QUALITY

Monitoring Requirement

Monitoring Equipment

Monitoring Parameters, Frequency and Schedule

Monitoring Locations

Monitoring Methodology and Calibration Details

Results and Observations

Assessment of Environmental Monitoring Results

5.        LANDSCAPE AND VISUAL

6.        ENVIRONMENTAL SITE INSPECTION AND AUDIT

Site Inspections

Review of Environmental Monitoring Procedures

Assessment of Environmental Monitoring Results

Advice on the Solid and Liquid Waste Management Status

Environmental Licences and Permits

Implementation Status of Environmental Mitigation Measures

Summary of Exceedances of the Environmental Quality Performance Limit

Summary of Complaints, Notifications of Summons and Successful Prosecutions

7.        FUTURE KEY ISSUES

Construction Programme for the Coming Months

Key Issues for Coming Month

Monitoring Schedule for the Coming Months

8.        CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 


List of Tables

 

List of Tables

 

Table 1.1           Contact Information of Key Personnel

Table 1.2           Construction Activities and the Corresponding Environmental Mitigation Measures

Table 2.1           Air Quality Monitoring Equipment

Table 2.2           Frequency of Air Quality Monitoring

Table 2.3           Air Quality Monitoring Stations

Table 2.4           Summary of 1-hour TSP Impact Monitoring Results

Table 2.5           Summary of 24-hour TSP Impact Monitoring Results

Table 3.1           Noise Monitoring Equipment

Table 3.2           Frequency and Parameters of Noise Monitoring

Table 3.3           Location of the Noise Monitoring Stations

Table 3.4           Summary of Impact Noise Levels during 07:00 – 19:00

Table 4.1           Water Quality Monitoring Equipment

Table 4.2           Water Quality Monitoring Parameters and Frequency

Table 4.3           Limits of Detection for the In-situ and Laboratory Measurements

Table 4.4           Marine Water Quality Monitoring Stations

Table 4.5           Summary of Total Number of Exceedances in the Reporting Month

Table 4.6           Total Number of Water Quality Exceedances in the Reporting Month and Previous Month

Table 5.1           Summary of Landscape and Visual Observations, Recommendations, Corrective Actions and Outstanding Issues

Table 6.1           Waste Disposal in the Reporting Month

Table 6.2           Summary of Environmental Licensing and Permit Status

Table 6.3           Corrective Actions by Contractor on Audit Findings

Table 6.4           Summary of Environmental Complaints and Prosecutions

 

 

 

List of Figures

 

Figure 1.1          Project Site Locations

Figure 4.1          Water Quality Monitoring Stations

Figure 6.1          Complaint Response Procedures

 

 

Appendices

 

Appendix A       Project Organization Chart

Appendix B       Action and Limit Levels for Water Quality

Appendix C       Monitoring Schedule for December 2006

Appendix D       Calibration Certificates

Appendix E       Site Audit Summary

Appendix F        Implementation Schedule of Mitigation Measures

Appendix G       Interim Notification of Environmental Quality Limits Exceedance

Appendix H       Event Action Plan

Appendix I         Construction Programme

Appendix J        Tentative Schedules for January 2007 to March 2007

Appendix K       Marine Water Quality Monitoring Results and Graphical Presentation

Graphical Presentation (DOSM, DOB, TUR & SS) –monthly

Graphical Presentation (DOSM, DOB, TUR & SS) –Trends

 

Appendix L        QC Results

Appendix M       Landscape and Visual Audit and Monitoring (Operational Phase) Bi-monthly Inspection Report No. 01 (December 2006)