TABLE OF CONTENTS
Background
Scope of Report
Project Organization
Summary of
Construction Works
Summary of EM&A
Requirements
Monitoring
Requirement
Monitoring Equipment
Monitoring
Parameters, Frequency and Schedule
Monitoring Locations
Monitoring
Methodology and Calibration Details
Results and
Observations
Assessment of
Environmental Monitoring Results
6. ENVIRONMENTAL SITE INSPECTION AND AUDIT
Site Inspections
Review of
Environmental Monitoring Procedures
Assessment of
Environmental Monitoring Results
Advice on the Solid
and Liquid Waste Management Status
Environmental
Licences and Permits
Implementation
Status of Environmental Mitigation Measures
Summary of
Exceedances of the Environmental Quality Performance Limit
Summary of
Complaints, Notifications of Summons and Successful Prosecutions
Construction
Programme for the Coming Months
Key Issues for Coming
Month
Monitoring Schedule
for the Coming Months
8. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
List of Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2 Construction Activities and the Corresponding
Environmental Mitigation Measures
Table 2.1 Air Quality Monitoring Equipment
Table 2.2 Frequency of Air Quality Monitoring
Table 2.3 Air Quality Monitoring Stations
Table 2.4 Summary of 1-hour TSP Impact Monitoring Results
Table 2.5 Summary of 24-hour TSP Impact Monitoring Results
Table 3.1 Noise Monitoring Equipment
Table 3.2 Frequency and Parameters of Noise Monitoring
Table 3.3 Location of the Noise Monitoring Stations
Table 3.4 Summary of Impact Noise Levels during 07:00 – 19:00
Table 4.1 Water Quality Monitoring Equipment
Table 4.2 Water Quality Monitoring Parameters and Frequency
Table 4.3 Limits of Detection for the In-situ and Laboratory
Measurements
Table 4.4 Marine Water Quality Monitoring Stations
Table 4.5 Summary of Total Number of Exceedances in the
Reporting Month
Table 4.6 Total Number of Water Quality Exceedances in the
Reporting Month and Previous Month
Table 5.1 Summary of Landscape and Visual Observations, Recommendations,
Corrective Actions and Outstanding
Issues
Table 6.1 Waste Disposal in the Reporting Month
Table 6.2 Summary of Environmental Licensing and Permit Status
Table 6.3 Corrective Actions by Contractor on Audit Findings
Table 6.4 Summary of Environmental Complaints and Prosecutions
List of Figures
Figure 1.1 Project Site Locations
Figure 4.1 Water Quality Monitoring Stations
Figure 6.1 Complaint Response Procedures
Appendices
Appendix A Project Organization Chart
Appendix B Action and Limit Levels for Water Quality
Appendix C Monitoring Schedule for December 2006
Appendix D Calibration Certificates
Appendix F Implementation Schedule of Mitigation Measures
Appendix G Interim Notification of Environmental Quality Limits Exceedance
Appendix I Construction Programme
Appendix J Tentative Schedules for January 2007 to March 2007
Appendix K Marine Water Quality Monitoring Results and Graphical Presentation
Graphical
Presentation (DOSM, DOB,
TUR & SS)
–monthly
Graphical
Presentation (DOSM, DOB,
TUR & SS)
–Trends