TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1      INTRODUCTION

Background

Project Organization

Summary Of Construction Works

Summary Of EM&A Requirements

2      MONITORING RESULTS

Air Quality

Water Quality

3      Environmental Audit

Implementation Status of Environmental Mitigation Measures

Status of Environmental Licensing and Permitting

Advice on Solid and Liquid Waste Management Status

Landscape and Visual Audit

4      NON-COMPLIANCE (EXCEEDANCE) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)

Summary of Exceedances

Review of the Reasons for and the Implications of Non-compliance

Summary of Actions Taken

5      ENVIRONMENTAL COMPLAINTS

Complaint Log

6      NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS

7      COMMENTS, CONCLUSIONS AND RECOMMENDATIONS

 


List of Tables

 

Table 2.1      Summary of Number of Exceedances for 1-hr & 24-hr TSP Concentration

Table 2.2      Total Number of Water Quality Exceedances in the Quarter

Table 2.3      Summary of Statistically Significant Results of SS

Table 3.1      Actual Amounts of Waste Generated in the Reporting Quarter

 

 

List of Figures

 

Figure 1.1  Organisation Chart

Figure 1.2  Project Site Location Project

Figure 1.3  Air Quality Environmental Monitoring Stations

Figure 1.4  Water Quality Monitoring Stations

 

Appendices

 

Appendix A       Contacts of Key Personnel

Appendix B       Implementation Schedule of Environmental Mitigation Measures

Appendix C       Environmental Quality Performance (Action/Limit Levels)

Appendix D       Graphical Presentation of Air Quality Monitoring Results

Appendix E       Graphical Presentation of Water Quality Monitoring Results

Appendix F        Statistical Analysis of the Trend of Suspended Solids in the Quarter

Appendix G       Event Action Plan