TABLE OF CONTENTS
Background
Project
Organization
Summary Of
Construction Works
Summary Of EM&A
Requirements
Air
Quality
Water Quality
Implementation
Status of Environmental Mitigation Measures
Status
of Environmental Licensing and Permitting
Advice
on Solid and Liquid Waste Management Status
Landscape and
Visual Audit
Summary
of Exceedances
Review
of the Reasons for and the Implications of Non-compliance
Summary of Actions Taken
Complaint
Log
6 NOTIFICATION
OF SUMMONS AND SUCCESSFUL PROSECUTIONS
7 COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
List of Tables
Table 2.1 Summary of Number of
Exceedances for 1-hr & 24-hr TSP Concentration
Table 2.2 Total Number of Water
Quality Exceedances in the Quarter
Table 2.3 Summary of Statistically
Significant Results of SS
Table 3.1 Actual Amounts of Waste
Generated in the Reporting Quarter
List of Figures
Figure 1.2 Project
Site Location Project
Figure 1.3 Air
Quality Environmental Monitoring Stations
Figure 1.4 Water
Quality Monitoring Stations
Appendices
Appendix A Contacts
of Key Personnel
Appendix B Implementation
Schedule of Environmental Mitigation Measures
Appendix C Environmental
Quality Performance (Action/Limit Levels)
Appendix D Graphical
Presentation of Air Quality Monitoring Results
Appendix E Graphical
Presentation of Water Quality Monitoring Results
Appendix F Statistical
Analysis of the Trend of Suspended Solids in the Quarter