TABLE OF CONTENTS
Environmental Status in the Reporting Month
Monitoring Parameters,
Frequency and Duration
Monitoring Parameters,
Frequency and Duration
5. ENVIRONMENTAL
SITE INSPECTION.
Review of Environmental Monitoring Procedures
Advice on Waste Management Status
Status Environmental Licences and Permits
Implementation Status of Environmental Mitigation
Measures
Summary of Exceedances of Environmental Quality
Performance Limit
Summary of Environmental Complaints, Notifications of
Summons and Successful Prosecutions
Environmental Monitoring and Audit Schedule for the
Coming Months
7. CONCLUSIONS
AND RECOMMENDATIONS
List of Tables
Table 2.1 Air Quality Monitoring
Equipment
Table 2.2 Air Quality Monitoring Parameters,
Frequency and Duration
Table 2.3 Locations of Air Quality
Monitoring Stations
Table 2.4 Summary of Impact 1-hour TSP
Monitoring Results
Table 2.5 Summary of Impact 24-hour TSP
Monitoring Results
Table 3.1 Noise Monitoring Equipment
Table 3.2 Noise Monitoring Parameters,
Frequency and Duration
Table 3.3 Locations of Noise Monitoring
Stations
Table 3.4 Summary of Impact Noise
Monitoring Results during 07:00 – 19:00 on Normal Weekdays
Table 5.1 Summary of Waste Disposal in
The Month
List of Figures
Figure 1.1 Project
Organisation for Environmental Management
Figure 1.2 Layout
of Work Site
Figure 1.2a Layout
of Work Site A
Figure 1.2b Layout
of Work Site B
Figure 1.2c Layout
of Work Site C
Figure 1.2d Layout
of Work Site D
Figure 1.2e Layout
of Work Site E
Figure 2.1 Locations
of Air Quality Monitoring Stations
Figure 3.1 Locations
of Construction Noise Monitoring Stations
Figure 4.1 Locations
of Water Quality Monitoring Stations
Figure 5.1 Complaint
Flow Diagram
Appendices
Appendix A Key
Contacts of Environmental Personnel
Appendix B Construction
Programme
Appendix C Environmental
Action and Limit Levels
Appendix
D Environmental Monitoring and Audit
Schedules
Appendix E Calibration
Details
Appendix F Air
Quality Monitoring Results and Graphical Presentation
Appendix G Noise
Monitoring Results and Graphical Presentation
Appendix H Summary
of Weekly Environmental Site Inspection Observations
Appendix I Status
of Environmental Permits/Licences
Appendix J Implementation
Schedule of Mitigation Measures
Appendix K Event
and Action Plans