Table of Contents

 

1       INTRODUCTION

1.1        Purpose of the Manual

1.2        Background

1.3        Environmental Monitoring and Audit Requirements

1.4        Project Organization

1.5        Construction Programme

1.6        Environmental Mitigation Measures proposed in the EIA

2       AIR QUALITY

2.1        Introduction

2.2        Measurement Parameters

2.3        Monitoring Equipment

2.4        Monitoring Locations

2.5        Baseline Monitoring

2.6        Impact Monitoring

2.7        Event and Action Plan for Air Quality

2.8        Mitigation Measures

3       NOISE

3.1        Introduction

3.2        Noise Parameters

3.3        Monitoring Equipment

3.4        Monitoring Locations

3.5        Baseline Monitoring

3.6        Impact Monitoring

3.7        Event and Action Plan for Noise

3.8        Noise Mitigation Measures

4       WATER QUALITY

4.1        Introduction

4.2        Water Quality Mitigation Measures

5       WASTE MANAGEMENT

6       SITE ENVIRONMENTAL AUDIT

6.1        Site Inspections

6.2        Compliance with Legal and Contractual Requirements

6.3        Environmental Complaints

7       REPORTING

7.1        General

7.2        Baseline Monitoring Report

7.3        EM&A Reports

7.4        Data Keeping

7.5        Interim Notifications of Environmental Quality Limit Exceedances

 

 

List of Tables

 

Table 1.1   Construction and Operation Programme of the Proposed Concrete Batching Plant

Table 2.1   Proposed Air Quality Monitoring Stations During the Construction Works

Table 2.2   Action / Limit Levels for Air Quality

Table 2.3   Event / Action Plan for Air Quality

Table 2.4   Mitigation Measures on the Concrete Batching Plant

Table 3.1   Proposed Noise Monitoring Stations during Construction Works

Table 3.2   Action/Limit Levels for Construction Noise

Table 3.3   Event/Action Plan for Construction and Operation Noise

 

 

List of Figures

 

Figure 1.1         Project Organisation

Figure 1.2         Outline Development Programme

Figure 1.3         Summary of Master Programme

Figure 2.1         Proposed Monitoring Stations for Cyberport Environmental Monitoring System

Figure 2.2         The Description and Detail Locations of the Sensitive Receivers for Air Quality During Main Construction Works and Advance Works of Cyberport Development

Figure 3.1         The Description and Detailed Locations of the Sensitive Receivers for Noise During Main Construction Works and Advance Works of Cyberport Development

 

List of Appendices

 

Appendix A      Site Location Plan

Appendix B      Environmental Monitoring System

Appendix C      Mitigation Measures Implementation Schedules

Appendix D      Environmental Proformas

Appendix E      Interim Notifications of Environmental Quality Limits Exceedances

Appendix F      Impact Prediction Review