Table of Contents
1.1 Purpose of the Manual
1.2 Background
1.3 Environmental Monitoring and Audit Requirements
1.4 Project Organization
1.5 Construction Programme
1.6 Environmental Mitigation Measures proposed in the EIA
2.1 Introduction
2.2 Measurement Parameters
2.3 Monitoring Equipment
2.4 Monitoring Locations
2.5 Baseline Monitoring
2.6 Impact Monitoring
2.7 Event and Action Plan for Air Quality
2.8 Mitigation Measures
3.1 Introduction
3.2 Noise Parameters
3.3 Monitoring Equipment
3.4 Monitoring Locations
3.5 Baseline Monitoring
3.6 Impact Monitoring
3.7 Event and Action Plan for Noise
3.8 Noise Mitigation Measures
4.1 Introduction
4.2 Water Quality Mitigation Measures
6.1 Site Inspections
6.2 Compliance with Legal and Contractual Requirements
6.3 Environmental Complaints
7.1 General
7.2 Baseline Monitoring Report
7.3 EM&A Reports
7.4 Data Keeping
7.5 Interim Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 1.1 Construction and Operation Programme of the
Proposed Concrete Batching Plant
Table 2.1 Proposed Air Quality Monitoring Stations During
the Construction Works
Table 2.2 Action / Limit Levels for Air Quality
Table 2.3 Event / Action Plan for Air Quality
Table 2.4 Mitigation Measures on the Concrete Batching
Plant
Table 3.1 Proposed Noise Monitoring Stations during Construction
Works
Table 3.2 Action/Limit Levels for Construction Noise
Table 3.3 Event/Action Plan for Construction and Operation
Noise
List of Figures
Figure 1.1 Project Organisation
Figure 1.2 Outline Development Programme
Figure 1.3 Summary of Master Programme
Figure 2.1 Proposed Monitoring Stations for Cyberport Environmental Monitoring System
List of Appendices
Appendix B Environmental Monitoring System
Appendix C Mitigation Measures Implementation Schedules
Appendix D Environmental Proformas
Appendix E Interim Notifications of Environmental Quality Limits Exceedances
Appendix F Impact Prediction Review